Earned Value as the Main Driver for Integrating Project Management Michael A. Hatfield PMP, CCC David J. Post PE.

Slides:



Advertisements
Similar presentations
M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
Advertisements

Module 8: Government Required Reports
Chpter#5 -part#1 Project Scope and Human Resource Planning
Chapter 2 The Software Process
Project Scope Management
Project Cost Management Estimation Budget Cost Control
Project Change Management
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Monitoring and Control Earned Value Management (EVM)
What is a project? Project Management Institute definition
Chapter 5: Project Scope Management
Glen Knight, PMP, CSP President How Mature Do You Think Your Are? The Project Management Maturity Model.
Chapter 4 Defining the Project. NEED FOR DEFINING PROJECTS One Project, small Many small projects, or large one –Yes.
Project Management Session 7
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Project Management Basics
Chapter 5: Project Scope Management J. S. Chou, P.E., PhD.
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Office of Innovations and Solution ACB-1 Project Management Principles and Practice for Managers Presented by: Pat A. Eigbe, PMP® Office of Innovations.
Project Scope Management J. S. Chou, P.E., PhD.
The Project Management Body of Knowledge (PMBOK)
Using Earned Value Management System (EVMS) Briefing for ATC Engineering & Test Division (ACT-200) Managers and Leads.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Advanced Project Management Project Plan Templates
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Systems Analysis and Design in a Changing World, 6th Edition
Advanced Project Management -Review
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Project ManagementDay 1 in the pm Project Management (PM) Structures.
Chapter 9 Project Communication, Tracking, and Reporting Copyright 2012 John Wiley & Sons, Inc. 9-1.
J. R. Burns, Texas Tech University Capability Maturity Model -- CMM n Developed by the Software Engineering Institute (SEI) in 1989 –SEI is a spinoff.
Resources Performance time. resources Performance time 2.
Management & Development of Complex Projects Course Code - 706
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Chapter Extension 18 Large-Scale Systems Development © 2008 Pearson Prentice Hall, Experiencing MIS, David Kroenke.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Software Engineering Lecture # 17
Project Management for Software Engineering Starting at “I’ve got a project” How do you decide: –What do I need to do? –When should I do it? –How long.
Agenda  Purpose  Definition  Processes  Performance Reports  Quality Control  Risk Monitoring & Control  Change Requests 5.3.
Management & Development of Complex Projects Course Code - 706
05/19/08 PM Boot Camp I International Sign Association Risk/Regulatory Compliance Department Las Vegas Division.
DEFINING THE PROJECT CHAPTER 4.
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Unit Guide C ertificate IV in Project Management
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Project Management Process Groups and Knowledge Areas Source: PMBOK 4 th Edition Prepared
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
What is Project Management? What makes it different from a process, service or program?
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
1 Advanced Project Management Project Plan Templates Ghazala Amin.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Implementing Earned Value Management System Lessons Learned from the Life and Death of the Progress Tracking System Michael Hatfield PMP, CCC & Toby Lovato.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
The Project Plan Plan Your Work, then Work Your Plan
Advanced Project Management Project Planning Phase Ghazala Amin.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
- 1 - Case Elaboration. Design Closing XPMR PMR Definition of Results RS Risk Analysis RA PMR n every 6 months Execution Multiannual Planning PEP.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
Information Technology Project Management, Seventh Edition.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Project Communication, Tracking, and Reporting
CS4311 Spring 2011 Process Improvement Dr
Project Management and Information Security
YIIP1100 Project Management
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Earned Value as the Main Driver for Integrating Project Management Michael A. Hatfield PMP, CCC David J. Post PE

What is Integrated Project Management? PMBOK Guide© lists, besides Integration, the following processes as part of Project Management: Cost Risk Time (Schedule) Scope Communication Human Resources Quality Procurement

Why should Projects have Integrated PM? Appreciable capability in one area depends on (at least) some capability in another Disparate, uncoordinated efforts are almost guaranteed to fail to improve PM within an organization But … how do you implement an integrated Project Management system?

The Capability Maturity Model (CMM)© Carnegie Mellon University’s Software Engineering Institute (SEI) developed a Capability Maturity Model for software. This model, with some mild adjustments, has become the foremost maturity model for Project Management and PM Information Systems.

SEI-CMM© Five Phases Phase I: Chaos, uncoordinated Phase II: Very basic capability, but consistently applied Phase III: Documented, repeatable Phase IV: Seamless, exportable Phase V: Routine discovery of new, ground-breaking solutions to PM problems

Components of a Basic EVMS A valid Work Breakdown Structure An Estimate, both in duration and resources, of each WBS Element (at the reporting level) The ability to collect Actual Costs for each WBS Element The ability to collect Start and Completion Dates, and percent complete information Acceptable report format

Once these elements are in place, a basic EVMS exists, and can serve as the main driver behind moving the organization from Phase to Phase.

According to the PMBOK Guide©... A complete PM capability involves a capacity in the following areas: Integration Scope Time (Schedule) Cost Risk Quality Human Resources Communication Procurement

How an EVMS helps drive Scope Management In order for an EVMS to exist, it needs a Work Breakdown Structure Since EVMSs need percent complete data, OBS elements will tend to be weeded out of the WBS If a task incurs actual costs without any Earned Value claimed, unauthorized work may have been performed … but you wouldn’t know it without the EVMS

How an EVMS helps drive Time or Schedule Management In creating the time-phased budget, the basic information needed for the Schedule Baseline is made available. Pre-critical path duration estimating capability can be attained by dividing the EVMS’s percent complete data into cumulative duration. With an EVMS in place, all that is needed for the Critical Path capability is the relation between the activities (schedule logic).

How an EVMS drives Cost Management Notice how this slide doesn’t say helps drive. You have a project to make 2,000 widgets You have two months, and $2,000, so you budget $1,000 per month. At the end of month 1, your accountant tells you that you have spent $1,100 How are you doing?

How an EVMS helps drive Quality Management Even a basic EVMS can generate Variance Analysis Reports, which can identify problems in the following categories: Formally added scope Scope Creep (informal scope additions) Resource Rate Variance Legitimate Contingency Event Poor Quality or performance

How an EVMS helps drive Human Resources Management By cross-connecting the WBS and OBS, it is possible to create a Responsibility-Accountability Matrix, or RAM, signaling high-performing teams as well as the less-than-optimal teams. Depending on the detail in the resource estimates, an EVMS can also be used to transfer resources to the project areas of greatest need.

How an EVMS helps drive Communication Management By measuring performance via the EVMS, a common vernacular is introduced into the organization, enhancing horizontal communication. With a Phase II capability, the entire organization is having its performance measured on the same basis, furthering enhancing vertical communication.

How an EVMS helps drive Risk Management A basic Risk Management requires the following to be in place: WBS Dictionary Cost and Schedule Estimates With the basic EVMS capability, these are already in place. More advanced Risk Management depends on the same information that leads to more advanced Earned Value capability as well.

How an EVMS helps drive Procurement Management From the PMBOK Guide©: “Procurement planning is the process of identifying which project needs can be best met by procuring products or services outside the project organization.” How could such an assessment occur without cost or schedule performance data?

To summarize... Scope capability is created by the EVMS practitioner establishing the baselines Schedule capability is created and enhanced by the data made available through the EVMS Cost capability relies exclusively on EVMS Quality capability depends on identifying performance problems, which is what an EVMS does

To summarize... Human Resources capability is enhanced by the EVMS Communications capability is also enhanced by the EVMS Risk capability depends on the information resident in the EVMS Procurement capability begins with performance knowledge, which is generated by the EVMS.

Any Questions?