S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.

Slides:



Advertisements
Similar presentations
Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
Advertisements

Monitoring for Data Quality Status of monitoring Histogramm analysis tools Data quality qualification.
Calo Calibration meeting 10/19/2010 Tools & software O. Deschamps (LPC)
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
On Noise Characterization Michel Lefebvre University of Victoria Physics and Astronomy 14 August 2003.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
Far Detector Data Quality Andy Blake Cambridge University.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
Ursula Bassler1online monitoring 7/2/2002 Calorimeter Data Quality  aim: enhance the information flow concerning the data quality between the detector-
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
M.N Minard Calorimeter Calibration scheme Calorimeter calibration procedure.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
10-Dec-2008 / S.KunoriHCAL Noise Identification and Monitoring1 HCAL Noise Identification and Filtering (HPD behavior and noise identification) Shuichi.
Sept 03:  About ~80 patches are installed, all in the periphery of Outer section:  C-side: voltage control / distribution boxes 1, 2, 3, 4, 8, 9 (partially)
N. Saoulidou, Fermilab1 Study of the QIE Response & Calibration (Current Injection CalDet & Development of diagnostic tools for NearDet N.Saoulidou,
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
Errors Detection and Reporting L0DU Hervé Chanal, Olivier Deschamps, Régis Lefèvre, Magali Magne, Pascal Perret LPC Clermont-Ferrand - Université Blaise.
Calo Calibration meeting 08 september 2009 Calorimeter Olivier Deschamps LPC Clermont-Fd Software Status&News.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
L1Calo EM Efficiency Maps Hardeep Bansil University of Birmingham L1Calo Weekly Meeting 07/03/2011.
Study of missing Level-1 triggers using data10 Hardeep Bansil University of Birmingham Trigger E/Gamma Signature Group Meeting 20/05/2010.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
CP Athena Monitoring Status as of 20/05/08 Revised directory structure (again!). Phi scale configurable in degrees, radians or channels. Existing plots.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Rainer Stamen, Norman Gee
Preparation for CERN test beam
PEDESTAL STABILITY OF HCAL DURING GLOBAL RUNS AND 2009 CASTOR DQM ANALYSIS Emine GÜRPINAR Cukurova University 7/31/2018.
Calorimeter Software Status & News Software week – 17/06/2009
Commissioning of the ALICE-PHOS trigger
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Presentation transcript:

S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive distributions 2. Reconstruction 3. Hadron and EM triggers performance 1. DAQ/Tell1 summary 2. CF summary.

S.MonteilCaloPiquet2 1. Calorimeters 2D Views Pick up the distribution in HISTDB/Calorimeters/Calo2DView Comment: allows to spot hot/dead channels. For instance, 5 dead channels in HCAL (See the CaloPiquet twiki page).

S.MonteilCaloPiquet3 1. Inclusive distributions: XCAL Pick up the distributions in HISTDB/Shift/XCAL: XCAL Status Overview Comment: the typical ECAL and HCAL ADC spectra. You can refine the view by looking at the number of saturated channels per event.

S.MonteilCaloPiquet4 1. Inclusive distributions: PRS Pick up the distributions in HISTDB/Shift/PRS: PRS Status Overview Comment: PRS measures MIPs at ~15 ADC counts (left plot) and EM component (right plot).

S.MonteilCaloPiquet5 1. Inclusive distributions: SPD multiplicity Pick up the distributions in HISTDB/L0Calo/SPD/Summary Comment: those days, we have pretty occupied detectors. 400 hits in average for SPD. Far from the design. Do not report that anyway at the run meeting, even if you fear for your hadronic and/or EM channel …

S.MonteilCaloPiquet6 2. Reconstruction Pick up the distributions in HISTDB/Calorimeters/Reconstruction Comment: well, see some online pi0s.

S.MonteilCaloPiquet7 3. Hadron trigger performance Pick up the distribution in HISTDB/L0Calo/Hadron/Emulator Comparison Comment: the plots on the left compare the trigger response to the reconstructed response from the DAQ values. Any entry points a hardware failure. In this case (HC24FEB1), all the HW were changed except the cable…

S.MonteilCaloPiquet8 3. Electron trigger performance Pick up the distribution in HISTDB/L0Calo/Electron/Emulator Comparison Comment: few errors inner C-side. No obvious trend observed. Make sure the L0Calo guys are aware of it.

S.MonteilCaloPiquet9 3. Photon trigger performance Pick up the distribution in HISTDB/L0Calo/Photon/Emulator Comparison Comment: same comment as the previous one is in order. When checking Global pi0 (HISTDB/L0Calo/Global pi0/Emulator Comparison), you’ll find an error-free response (ECAL only). The guilty guy here is hence most likely the PRS.

S.MonteilCaloPiquet10 4. DAQ/Tell1 summary Pick up the distribution in HISTDB/Calorimeters/Analysis/CaloReadoutStatus Comment: tells you how the DAQ communications behaved. This run is perfect. An error rate (correlated between all detectors) of few per is acceptable [corresponds to a known desync Croc/Tell1 for the first BCID count].

S.MonteilCaloPiquet11 5. Calibration Farm summary Pick up the distribution in HISTDB/Calorimeters/Analysis/CalibrationData Comment: overview of the four detectors. They are critical plots since they trigger Shift Crew actions. Comments destinated to the data manager have been updated. In more details for each detector …

S.MonteilCaloPiquet12 5. Calibration Farm summary: ECAL. Pick up the distribution in HISTDB/Calorimeters/Analysis/CalibrationData Comment: give statements on the detector, provided that the LED monitoring system behaves as expected. If the number of channels in error/fatal notice are large (>300), most likely linked [for the time being] to a LEDTSB configuration problem. Action: reconfigure LEDTSB. The shift crew is notified to do so. Actions in nominal operation (hopefully soon) are also given in Shift page. GainVariation Pmt2PinNoise NoGainMonitor LargeLEDNoise LEDNoise OutRangeLED LowLEDSignal UnexpectedSignal PedestalChi2 LargePedestalNoise PedestalShiftOverNoise PedestalNoise AveragePedestalNoise LargePedestalShift PedestalShift

S.MonteilCaloPiquet13 5. Calibration Farm summary: HCAL. Pick up the distribution in HISTDB/Calorimeters/Analysis/CalibrationData Comment: stable so far. The nominal indications to the shift crew are standing. GainVariation Pmt2PinNoise NoGainMonitor LargeLEDNoise LEDNoise OutRangeLED LowLEDSignal UnexpectedSignal PedestalChi2 LargePedestalNoise PedestalShiftOverNoise PedestalNoise AveragePedestalNoise LargePedestalShift PedestalShift

S.MonteilCaloPiquet14 5. Calibration Farm summary: PRS. Pick up the distribution in HISTDB/Calorimeters/Analysis/CalibrationData Comments: under development. LEDs are not enabled. The corresponding 4 monitored quantities should be found in UNKNOWN state at each data SaveSet. Pedestal mean and sigma are measured for the two VFE alternances. A goodness of fit is given in each case (~300 warnings is currently the expectation). No action must be taken so far. Yet, warn L. Li Gioi or S. Monteil for any deviating behaviour. Chi^2 of the fit odd Pedestal sigma odd Pedestal mean odd Chi^2 of the fit even Pedestal sigma even Pedestal mean even

S.MonteilCaloPiquet15 5. Calibration Farm summary: SPD. Pick up the distribution in HISTDB/Calorimeters/Analysis/CalibrationData Comments: under development. Again LEDs are not enabled. The corresponding 2 monitored quantities should be found in UNKNOWN state at each data SaveSet. Count the number of hits for each alternance. No signal expected apart the electronic noise. Actions: diagnose noisy channels. In case of Error/Fatal, you’ll have most likely to mask the channel in the trigger path.. Electronic noise odd Electronic noise even

S.MonteilCaloPiquet16 6. Conclusion. It was a nice run …