Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
April 05 Jason Tarrant CCLRC1 PRR of SCT off-detector cooling system l Cooling System »Design - Off-cylinder & On-cylinder »Installation – Off-cylinder.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
M. Gilchriese Glued Fittings October 5, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface prep.
M. Gilchriese Glued Fittings October 26, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
Construction of the Tracker End Caps CMS Tracker MPR 22/11/2004 D. Contardo Aachen I, Aachen III, Antwerpen, Brussels, Hamburg, Karlruhe, Louvain, Lyon,
7/17/02Reyco Henning -- TRD Box S Component Testing 1 TRD Box S Solenoid Valve Testing AMS TRD Meeting, CERN, July 2002 U. Becker, G. Carosi, R. Henning,
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
C ONCENTRIC TUBE H EAT EXCHANGER TEST SETUP AT C RYOLAB CO2 FOR CMS T RACKER WEEK MEETING. Theodoros Katopodis PH-CMX.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Service channels between Tracker and PP1 TK-PP1 Cable Channel Review 14 September 2007, Antti Onnela, CERN Installation order and Component status Mock-up.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Installation of the T600 at Fermilab CSN2, September 22,
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
The 96 Chann FED Tester: Greg Iles2 September Channel FED Tester Status –Prototype now fully populated with AOHs. –Forced to borrow seven 2-channel.
Internal Guide : Batch No : 4 Mrs.Punyavathi Madam
SPS High Energy LSS5 Thermal contact & cooling aspects
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
EC: 7 DISK concept Preliminary considerations
ATLAS Internal ID Service Integration
Feedback on transfer line sizing and flow calculations for UT
Installation of the T600 at Fermilab
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Service channels between Tracker and PP1
Ti/SS transitions A.Basti INFN-PISA*
Pipe Bending Ian Mercer, Harald Fox, Richard French.
HFM Test Station Main Cryostat
Status of design and production of LEP connection cryostat
Manufacturing of the first FCC-hh beam screen prototype for ANKA
? ENDCAP: Mechanics IFIC-Valencia.
Mechanics: (Tim).
Teleconference ACS – FREIA 17th October 2017
Tracker Outer Barrel COOLING Antti Onnela, CERN.
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
MICE Coupling Coil Update
Recirculating CO2 System
Work flow Lyon Karlshrue 14/11/2018 Nick Lumb Preparation (no TEC)
Phase II Collimators : design status
TEC assembly and commissioning at Lyon
Presentation transcript:

Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available Arrangement gives good stability in all directions First 2 plates (10 petals) expected next week – prototype petals will be checked for stability (mount petal at 0°/45°/90° orientation and hang weight of 2kg). Ti-pipes for cooling circuit all delivered; bending jigs (FP and BP) available. Manifolds redesigned (simplified): material SS and in one piece Waiting for welding trials to the Ti-cooling pipes. Inserts (all types) in hand and electrically insulating! Gluing jigs (FP and BP) ready. Small parts in hand Conclusion: Petal production can start as soon as welded manifolds exist

Tests/Quality control during petal production 1/ Leak test for cooling circuit (at 3 x working pressure = 12bar) A setup exists in Louvain, to be implemented in Aachen 2/ Measure thermal efficiency/electrical resistance of each insert Measurement combined in one test setup, which is in preparation. ResultsDB 3/ Precision and Deformation measurements Control all petals at start of production (10-15%); Sample later Measure all insert positions on CMM (room temperature) Cool petal and measure inserts on CMM in cold condition (has to be tried to see if measurement can be done fast enough to avoid ice formation), or Optical method (setup exists but not yet taken into operation) 4/ ICB testing : operative (WK)

Request: Decide the petal types to be integrated in each center, so that the small parts needed for petal integration (centerliners,screws,washers,bridges,…..) and of course subsequently the other components (modules,AOHs,…) can be distributed accordingly