Transformer positions for BISMV and BSW M. Hourican 2 March 2015.

Slides:



Advertisements
Similar presentations
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Advertisements

Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
LArTF and MicroBooNE Installation
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
TP4-ENERSOL-TD/PV double function
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Injection foils and handling system Review on PSB 160 MeV H - Injection 9-10 November 2011 W. Weterings C. Boucly, M. Hourican, R. Noulibos, Y. Sillanoli.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
SC Project Review of NCSX, April 8-10, 2008 NCSX Fueling and Vacuum Pumping Systems W. Blanchard WBS 21 and 22 Manager.
Vacuum sectorisation H- Injection Some history Wim Weterings
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Engine Performance BASIC MAINTENANCE AND LIGHT REPAIR.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
MTA Installation Meeting February 21, 2007 Agenda 1)Progress report (Fernanda+Carol) 2)Floor Plan layout (Fernanda+Larry) 3)AOB Key Red – critical Orange.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
1 Target Station Design Dan Wilcox February 2012.
Wim Weterings Remy Noulibos
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
Teleconf ACS – FREIA 28th March 2017
Linac4-PSB 160 MeV connection readiness review
Subject: INJECTION SYSTEM Junction LINAC4-booster
CLIC Handling Engineering Update
SBN Far Detector Installation & Integration
IT-4189 Supply and installation of a cryogenic distribution system
LINAC4 ADVISORY COMMITTEE
Update of MVD services and requests
Dielectric Oil Installations
VELO-installation meeting CERN, January 17, 2006
AD consolidation activities in LS2
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
The 11T cryo-assembly: summary of design and integration aspects
Disabling Rules.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
RDR Baseline Layouts for Interaction Region
February 2019.
Cryomodule Assembly Plan
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Transformer positions for BISMV and BSW M. Hourican 2 March 2015

BSW 4 transformers (‘small’) 12 power cables Water manifold for 16 magnets Control box BISMV 3 transformers Water manifold for 3 magnets Control box

BISMV – Downstream (Beams 2 & 4) 3 transformers, 0.8 m3, and 1 Tonnes each 3 striplines equipped with Pearson / DCCT EPC prefer not to stack transformers in case of a failure and the subsequent exchange procedure (…ALARA) Crane available for installation

Upstream magnet Ring 1 Main magnet feedthrough here Proposed transformer position for upstream magnet BTSMV10 in close proximity to the BISMV Remember The pumping group shall be transferred to the main BT10 vacuum tank for 2 GeV operation BI equipment transferred to here Primary Pumping group new location here

BSW - Objectives Place transformers in a place where they will not cause obstruction Optimise the positions for the lengths of the strip lines Ensure transformers have sufficient clearance for installation of DCCT and for maintenance / failure intervention Remove obsolete cabling if possible-Transformers can be shimmed off the floor level to allow useful cables to remain The area under the false floor is approx. 0.67m deep and can house the transformers Protection covers can be fitted to prevent access by unauthorised personnel Last but not least, if one transformer fails, it can be easily and rapidly replaced (Stacking does not permit this) Remember – No crane available !

Viewed from inside booster ring Viewed from outside booster ring 4 transformers to place Size approx. 600x600x power cables for BSW2,3 &4 go to surface building Water distribution manifolds, flowmeters, gauges etc Control (SMB) interface box Each transformer shall be equipped with 2x DCCT’s (Dimensions approx. 470x470x 30mm) Protective covers to be easily accessed DCCT

Conclusion s BISMV No interference with piping Raised off floor by 100mm Crane access ok Minimum distance from magnet feedthroughs Space for DCCT guaranteed BSW No interference with piping Raised off floor by 100mm Crane access no ok – Forklift can be used to do the installation Space available for DCCT’s No restriction on access around the injection region Lengths of striplines can be optimised

Booster Transfer Lines