SESAR and GA Michael Erb Member of SESAR Excom IAOPA Regional Meeting Larnaka, 22nd September 2007.

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

SIP/2012/ASBU/Nairobi-WP/19
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Mission Trajectory Step 1 From planning to deployment.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
AIM Operational Concept
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
6th Framework Programme Thematic Priority Aeronautics and Space.
PBN Airspace Concept Process
The European Organisation for the Safety of Air Navigation Ian Middleton, Deputy Director EUROCONTROL - Directorate Single Sky Amsterdam, 27 April 2012.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Federal Aviation Administration General Aviation’s Technology Transition Presented to: SETP Flight Test Workshop By: FAA Small Airplane Directorate Lowell.
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Regional Cooperation Activity JOINT MEETING OF THE ADVISORY COMMITTEE AND THE EXECUTIVE BOARD Nicosia 17 Jan 2014.
AGCC CGSIC ISC Feb US DEPARTMENT OF TRANSPORTATION CIVIL GPS SERVICE INTERFACE COMMITTEE INTERNATIONAL SUB COMMITTEE MEETING Melbourne, Australia,
17 January 2014 United Kingdom Future Airspace Strategy FAS VFR Implementation Group Launch Meeting Phil Roberts – SARG Hd AAA.
SESAR Single European Sky Air traffic management Research
Session One – Airspace Allocation and Use NextGen IAOPA World Assembly September 2011 Stellenbosch, South Africa.
FASVIG Introductory Meeting
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
David Bowen Head of ATM Operations and Systems
24-25 June 2010 SWIM-SUIT Final User Forum, Rome SWIM-SUIT Final User Forum.
IAOPA Europe 112 th Regional Meeting Brussels 9 April 2005 Martin Robinson.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
AVINOR FLYSIKRING AS AVINOR AIR NAVIGATION SERVICES INVESTMENTS AND FINANCING FOR AVINOR DEPLOYMENT PER INGAR SKAAR.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
SESAR State of the Art – Civil RPAS Insertion in the European Aviation System 3 rd Workshop on European Unmanned Maritime Systems FÓRUM DO MAR Porto, May.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ADS-B An Industry Perspective New Technologies Workshop Washington, DC January 10, 2007.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
ASAS Opportunities SESAR and NextGen. SESAR D4 Time is very short – we only have until the end of October Lines of Change, Operational Improvements and.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT ASAS-TN2 3rd Workshop – Glasgow 11 September 2006 ASAS-TN2 Third workshop Address by the Commission.
How is Sports Aviation affected by SESAR? LEISURE AVIATION AND SESAR.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
Petros Stratis – BLUE MED Project representative – DCA Cyprus Co-financed by the EU (TEN-T)
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Welcome to the SESAR SWIM Master Class 2013
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
SIP/2012/ASBU/Nairobi-WP/19
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
OptiFrame WP1: Project Management
Summary of the results of discussions in the aviation panel
ANConf/12 – Agenda H. Sudarshan
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
The Single European Sky Implementation Programme: SESAME
PBN and the benefits for GA
GNSS Approach for General Aviation
4D Trajectory Management
Soren Dissing - EUROCONTROL
ICAO Forum on Integration and Harmonization of NextGen and SESAR into the Global ATM Framework 8-10 September 2008 Lex Hendriks Deputy Director DAS, EUROCONTROL.
Presentation transcript:

SESAR and GA Michael Erb Member of SESAR Excom IAOPA Regional Meeting Larnaka, 22nd September 2007

SESAR Structure The Definition Phase produces 6 Milestone Deliverables: D1 Current Situation  D2 Performance Target  D3 Definition of the future ATM target concept  D4 Selection of the best Deployment Scenario = in progress D5 Production of the ATM Master Plan D6 Work Programme for ETA: March 2008 Starting 3/2008: The Implementation Phase as SESAR Joint Undertaking. The European Commission urges to invest into the JU and promisses on its homepage “Voting Rights and Influence“ in return.

Main SESAR-Elements Efficiency Improvements –4D Trajectories –SWIM =System Wide Information Management –Self-SeparationGA relevant Satety Improvements Environmental Improvements

GA´s Objectives in SESAR Continued Access to Airspace, GA-Ghettoisation must be avoided Affordable, beneficial Avionics and Procedures –Integrated Pre-Flight Planning –Access to inflight weather –SBAS/EGNOS supported IFR-Approaches, following the WAAS example, after 2010 –Surveillance via ADS-B -Out and if desired ADS-B–In, to allow Phase out of Radar after 2020 –Digital Radios in 2020 instead of 8.33 Analogue Radios in 2012 (ongoing battle between GA&MIL vs. ANSPs) –Long Term Safety on Investments is fundamental

Cost for GA in SESAR Within the General Aviation community, two subcategories have been identified: (1) GA IFR and (2) GA VFR. For IFR the ‘structural’ avionic package includes advanced aircraft communications capabilities (ADS-B in/out, access to SWIM). It also includes an ‘incidental’ package containing SBAS based navigation. VFR includes a ‘structural’ package consisting of advanced communication capabilities, GNSS based navigation capabilities and a ‘squitter’. Table Unit Cost per aircraft

Cost-Benefit Findings for GA For the IFR GA, the case is likely to be always negative …, the result is due to the lack of significant benefits as well as difficulty to quantify some their specific benefits. –17 k € investment until ~ 2020 For VFR GA, no benefit has been monetised and there are mainly only costs. –6 k € investment until ~ 2020 GA´s benefit is non-monetary: Safety, Access to Airspace and Facilitation of Operations Deliverable 3, Chapter Civil Airspace Users Results

GA´s problems in SESAR Will GA get a financial compensation? –Like in Australia, where ADS-B equipment is given to GA for free. The Huge Financial Benefit achieved by Radar Phase Out is used for compensating GA Airlines want all the benefits, but they avoid any extra cost, i.e. compensation payments for disadvantaged GA Airlines, ANSPs and Industry have a majority of voting rights in the SESAR Excom and the SESAR JU Still unclear how the safety benefits will come into our cockpits, via which enablers. To solve these problems is the challenge of D4, the “Deployment Secenario“ of SESAR

Our way ahead in SESAR IAOPA is aware of both problems & opportunities. We are prepared to continue in SESAR via engagement in the workpackages, the User Advisory Board and the Executive Committee Without adequate benefits for GA, IAOPA will not accept any outcome Europe can´t allow SESAR to fail Europe needs “the buy“ in of GA, so it has to aim for a “fair and symmetric cost/benefit distribution“ Airspace Users intend to continue jointly in the SESAR Joint Undertaking via the “User Advisory Board“

Thanks for your attention! For any questions and more information contact me under: Phone: