RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

Slides:



Advertisements
Similar presentations
Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Radiation 2 Electronics Session th January 2010 Radiations to Electronics.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Development of a DC/DC converter for low voltage power distribution in LHC upgrades. Stefano Michelis Supervisor: Federico Faccio ELACCO mid-term review.
CELeSTA CERN LATCHUP STUDENT SATELLITE TEST BOARD DEVELOPMENT AND CHARM PRELIMINARY RESULTS Raffaello Secondo ESA/ESTEC CERN Visit - DECEMBER 9 th 2014.
Beam Position Monitors: Front-End Components - BPM Acquisition Architecture - Components Selection - Irradiation Tests MOPOS Radiation Tests - JL Gonzalez.
COMPONENT TEST H4IRRAD 15 TH NOVEMBER 2011 G. Spiezia, P. Peronnard, G. Foucard, S. Danzeca, P. Gander, E. Fadakis (EN/STI/ECE)
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
2012 H4IRRAD test campaigns Summary of results S. Uznanski CERN, Geneva, Switzerland Radiation Working Group meeting Oct 16, 2012.
SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 2 ND TH MARCH 2012 G. Spiezia (EN/STI/ECE)
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.
Fraunhofer Test-Campaigns March 25 th 2013 (R2E) Mitigation Project: RadWG March 25 th 2013 FRAUNHOFER Test-Campaigns & Facilities M. Brugger.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
Apr, 2014 TE-EPC-CCE Radiation Tests
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
TECHNICAL INSTALLATION RADWG - 2 APRIL /03/20091J.Lendaro EN/STI/ECE.
(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
The FGClite Project Status Update and Requirements R2E Extended Project meeting TE-EPC-CC R2E Team.
RADWG 6 TH TH NOVEMBER 2013 G. Spiezia (EN/STI/ECE)
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
European Organization for Nuclear Research Industrial Controls Engineering Department GUAPI working group meeting May the 6th 2015.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC Calendar for 2004   March   May   30 June -1 July  
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
New Irradiation Test Facility : CHARM June 10 th 2014 CERN R2E project CHARM Introduction June 10 th 2014 New CERN Irradiation facility : CHARM !!! Many.
Matters arising RADWG - 3 July 2009
DerivFIP – Radiation test
CHARM facility update 23/04/2015
Cryo equipment strategy in the R2E context
S. Baron - BE/BI-PH-ESE GBT/VL meeting
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
Tile Upgrade Workshop (CERN- February and 9)
on behalf of the RF group
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
6th WorldFIP Insourcing Meeting
CNRAD dosimetry and Summary of the TS
Irradiation Facilities Questionnaire
10/month is the present production rate 2 FTE + sporadic contributions
SPS Beam Position Monitors: Front-End Electronics
Collimator Control (SEUs & R2E Outlook)
RADIATION induced failures in LHC 28th June 2011
February 2007 Note: Source:.
MICROFIP-Do we need further tests? 28th June 2011
R2E LMC Update (Weeks 32/33) Post-Mortem database: SEE analysis and link to existing RadWG list in preparation Shielding block delivery crisis solved:
RADWG Meeting February 2017
Radiation Working Group RADWG
Presentation transcript:

RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)

AGENDA  Matters arising and SEU events  CNRAD and PSEAST area  H4IRRAD  LHC Weekly report  PSI test- Voltage regulators, Current source, Switch

Technical stop  LHC TS2  Reading of the radfets-analysis on going (PS and SPS)  LHC TS3  Moved to September. Consequences for CNRAD will be communicated (if any)

PSI test plan -1 Date Equipment Owner Test groupDUT 1 FebruaryEN/STI PXI power supply 18-19February EN/STI Voltage regulator Cypress Toshiba Diff Amp TE/EPC AC/DC MarchBI BPM electronics MarchEN/STI Analog switches current regulator RadFet April TE/EPCEN/STIMosfet-1 EN/STI RadMon prototype BI Beam Loss Monitor

PSI test plan-2 Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage reference July 1 st TE/EPC EN/STI- TE/EPC PWM, Transceiver EN/STI Profibus module 28-29JulyBI BPM components August/SeptemberTE/EPC FGC lite components  The collaboration is to renew for the next years. 1 test per month?

PSI – Irradiated boards and cables

 The amount of boards and cables from previous irradiation start to become significant  Use a label on the DUT and on the cables to identify  Equipment  Group/Responsible contact  Date of the test  Specify if you want to recuperate or throw it away (once the activation levels are low). The material is under your responsibility

PSI - Note on Profibus controller  Anybus IC. Tested at PSI to implement the data communication from an acquisition board to a PLC  ASIC does not stand radiation (overcurrent consumption as soon as beam is on)  Work-around  IP core for FPGA could be bought  Use of ModBus. Require a rad tol RS485 transceiver. Good candidate?

CEA – 1 MeV facility  Request of beam time for 2013 to be sent by next week  Test is advised for equipment in DS LHC areas and SPS  Passive test can be an option  Send your request by specifying the components and the location  A brief communication is appreciated if you do not consider such a test  Beam slots in October/ November

TID test for the future  Use of external facility under consideration  GIF++. Dedicated source at CERN  Foreseen for the experiments  Negotiations to get test slots and have a Co60 source

News on NanoFip purchase  Ordered 2 batches of 5000 A3P400-PQG208 each  Batch 1 (non programmed) expected on  Batch 2 (programmed and marked with logo) expected on  ~10 components per batch will be tested at E. Gousiou

SEU events in LHC  Summary at the LMC on 20 June by M. Brugger  committee/Presentations/1/lmc_138/l mc_138i.pdf committee/Presentations/1/lmc_138/l mc_138i.pdf

Conferences Topical workshop on electronics for Particle Physics (TWEPP-12)  The registration is open  September 2012, Oxford  p12/ p12/

Back-up

SEU events in LHC DateTitle LHC point AreaTypeSEU? Beam Dump Equipment 04/05/2012 Cryogenic compressor stop in P8 Point 8US85soft SEETBCFALSECRYO 03/05/2012 RF trip module M2B2, L8B2 Point4UA47soft SEETBCTRUERF 19/04/2012QPS Wfip lostPoint 5DSsoft SEEYESFALSEQPS 16/04/2012Power converter- FGCPoint 7ARCssoft SEETBCTRUEEPC 13/04/2012Power Converter FaultPoint 1RR17hard SEEYESTRUEEPC 10/04/2012QPS-Protection 600 APoint 5UJ56soft SEETBCTRUEQPS 09/04/2012Power Converter FaultPoint 1UJ16hard SEEYESTRUEEPC 04/04/2012 Trip of QPS 4R8 - loss of cryo maintain Point 8LSS-TBCTRUEQPS

Course conference workshop  Course radiation effects R. Gaillard on CERN training web site  SEE symposium  April 2012   NSREC  July 2012   RADECS  September 2012 