(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.

Similar presentations


Presentation on theme: "(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015."— Presentation transcript:

1 (1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015

2 (2/8) J. Mekki RadWG meeting – 03/02/2015 1 st year - 2014  Construction of the facility has been finished last year on the 9 th of October  Intensive commissioning period from 10/10/2015 during 1 month  First operation period has been performed from 12/11/2014 to 15/12/2014 (≈ 1 month)  Within this period we made radiation tests for 10 users on 14 different equipment (in parallel)

3 (3/8) J. Mekki RadWG meeting – 03/02/2015 GroupTechnical responsibleEquipement EN/STI Giovanni Spiezia/Raffaello Secondo/Salvatore Danzeca RadMON V6 Ruben G, Alia / SlawoszSRAMs Gilles Foucard/Paul PeronnardJDI tester IT/CS Alberto Garcia MoleroIT beacons TE/CRG Nikolaos Trikoupis/ Juan Casas CubillosCryogenic electronics crate LEDs TE/EPC Slawosz UznanskiComponents o SRAM Renesas o ADS1271 Delta-Sigma ADC Lionel Foro / Louis de MallacComponents tester Components (Op-amp, Comparator, power MosFETs etc …) UM2_EN/STI Raffaello SecondoCubesat Julien MekkiCapa MOS INFN Massimiliano FioriniPCB board and wires 10 users 14 equipment 1 st year - 2014

4 (4/8) J. Mekki RadWG meeting – 03/02/2015 1 st Run Analysis  Radiation levels at the different locations are being analysed  Benchmarking is being performed between experimental measurements (RadMON / BLM) and Fluka simulations  Results will be provided to the users as soon as they are available TID 1 MeV neutron eq. fluence HEH fluence Thermal neutrons fluence Dedicated test position Radiation test period

5 (5/8) J. Mekki RadWG meeting – 03/02/2015 2 nd year - 2015  From 15/12/2014 to about Mid-April 2015 → Winter Shutdown  Dedicated to the upgrade of the facility  If you have any feedbacks to improve CHARM (or the way we make tests)  Please let me know.  From Mid-April to Mid-May 2015 → Commissioning period  From Mid of May up to November 2015 → CHARM operation with users  Strong differences between 2014 and 2015 operation:  Access to the target area will be restricted to maintenance operations  Use of the conveyer to install equipment inside the target chamber  Maximum 2 users per irradiation slots  1 → At the Montrac test location  1 → At a test location using the AVT conveyer

6 (6/8) J. Mekki RadWG meeting – 03/02/2015 2 nd year - 2015  From 15/12/2014 to about Mid-April 2015 → Winter Shutdown  Dedicated to the upgrade of the facility  If you have any feedbacks to improve CHARM (or the way we make tests)  Please let me know.  From Mid-April to Mid-May 2015 → Commissioning period  From Mid of May up to November 2015 → CHARM operation with users  Strong differences between 2014 and 2015 operation:  Access to the target area will be restricted to maintenance operations  Use of the conveyer to install equipment inside the target chamber  Maximum 2 users per irradiation slots  1 → At the Montrac test location  1 → At a test location using the AVT conveyer

7 (7/8) J. Mekki RadWG meeting – 03/02/2015 2 nd year - 2015  From 15/12/2014 to about Mid-April 2015 → Winter Shutdown  Dedicated to the upgrade of the facility  If you have any feedbacks to improve CHARM (or the way we make tests)  Please let me know.  From Mid-April to Mid-May 2015 → Commissioning period  From Mid of May up to November 2015 → CHARM operation with users  Strong differences between 2014 and 2015 operation:  Access to the target area will be restricted to maintenance operations  Use of the conveyer to install equipment inside the target chamber  Maximum 2 users per irradiation slots  1 → At the Montrac test location  1 → At a test location using the AVT conveyer  Schedule has to be defined in advance

8 (8/8) J. Mekki RadWG meeting – 03/02/2015 List of possible users (2015) GroupTechnical responsible EquipementTarget Dose/Criterion Comments / Request form EN/STI Paul Peronnard Components (To be defined) To be definedNo request form received yet Ruben G, AliaSRAMsTo be definedTest foreseen No request form received yet S, DanzecaFloating Gate sensorsTo be definedTest foreseen No request form received yet TE/EPC Slawosz UznanskiFGCLite prototypeTo be definedTest foreseen No request form received yet Lionel Foro / Louis de MallacComponents tester (upgrade of the existing one) Components to be tested (op- amp/comparator/Power Mos …) Test will be 200 Gy / slotsTest will be done No request form received yet Vincent BarbetFull power converterTo be definedTest foreseen No request form received yet TE/MPE Yan BastianRemote I/Os interlocks equipment 1 kGy Start: Low Dose Rate 1- 2Gy/h And 10 Gy/h Estimation: around 15 days at position 15 Test will be done Request form received

9 (9/8) J. Mekki RadWG meeting – 03/02/2015 GroupTechnical responsible EquipementTarget Dose/Criterion Comments / Request form UM2/CERN Raffaello SecondoCubesatTo be definedNo request form yet TE/MPE Jens SteckertnDQQDG boardTest with blown up beam To be defined Test in direct beam (another iteration is needed) No request form yet PH/ESE Francis AnghinolfiASICs testTest with the blown-up beam To be defined First discussion already done No request form yet EN/EL Carl CrommelinckData concentrator with different I/O To be definedFirst discussion already done No request form yet Results needed by end of summer Stephane DelarueLight sytemTo be definedTest to be done No request form yet Vincent ChareyreUPSTo be definedTest foreseen No request form yet BE/RF Wolfgang HofleHigh Bandwidth solid state amplifiers To be definedTest foreseen No request form yet TE/CRG Nikolaos TrikoupisNo requirement yet PH/AID Hartmut HillemannsMAPS sensor on PCBTest with the blown up beam To be defined Request form received List of possible users (2015) Already 16 users More to be added

10 (10/8) J. Mekki RadWG meeting – 03/02/2015 Information  CHARM website available here.here  You can make your radiation test request from the website “Radiation test request form”  CHARM user’s meeting will be organize each ≈ 2 weeks to follow-up on the test preparation and requests  CHARM user’s meeting presentations and meetings will be made available on indico soon.  Please if you want to participate to those meetings and are not already on the list  Send me an email and we will update it


Download ppt "(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015."

Similar presentations


Ads by Google