CHARM facility update 23/04/2015

Similar presentations


Presentation on theme: "CHARM facility update 23/04/2015"— Presentation transcript:

1 CHARM facility update 23/04/2015

2 1st year Construction of the facility has been finished last year on the 9th of October Intensive commissioning period from 10/10/2015 during 1 month First operation period has been performed from 12/11/2014 to 15/12/2014 (≈ 1 month) Within this period we made radiation tests for 10 users on 14 different equipment (in parallel)

3 1st year - 2014 14 equipment 10 users Group Technical responsible
Equipement EN/STI Giovanni Spiezia/Raffaello Secondo/Salvatore Danzeca RadMON V6 Ruben G, Alia / Slawosz SRAMs Gilles Foucard/Paul Peronnard JDI tester IT/CS Alberto Garcia Molero IT beacons TE/CRG Nikolaos Trikoupis/ Juan Casas Cubillos Cryogenic electronics crate LEDs TE/EPC Slawosz Uznanski Components SRAM Renesas ADS1271 Delta-Sigma ADC Lionel Foro / Louis de Mallac Components tester (Op-amp, Comparator, power MosFETs etc …) UM2_EN/STI Raffaello Secondo Cubesat Julien Mekki Capa MOS INFN Massimiliano Fiorini PCB board and wires 14 equipment 10 users

4 Dedicated test position
1st Run Analysis Radiation levels at the different locations are being analysed Benchmarking is being performed between experimental measurements (RadMON / BLM) and Fluka simulations Results have been provided to the users TID 1 MeV neutron eq. fluence HEH fluence Dedicated test position Radiation test period

5 Winter Shutdown From 15/12/2014 to about Mid-April 2015 → Winter Shutdown Dedicated to the upgrade of the facility – Main activities: Montrac upgrade → Allow for a proper connection with the cable holder chain Revolver redesign and upgrade of the control system → Allow for a better accuracy Movable shielding → Bug with the switches solved EN/EL activities (light, new cabling, activities inside the facility) → Done (activities outside still to be done) Reception / Test / finalization of the installation for the AGV → Tests with the cables holder chains See video Repair of the Mantion System + new variators for the motor + speed adjustement for the conveyers Dry run station for water cooling finished And others… →

6 2nd year Planning for Run2 Next 2 weeks → Commissioning

7 2nd year - 2015 Planning for Run2
We start to operate with users on the 11th of May

8 2nd year - 2015 Planning for Run2
In-beam test periods → No target and blown-up beam

9 2nd year Planning for Run2 High Intensity period

10 2nd year - 2015 CERN users (25 users) External users (14 users)
EN Department (10 users) EN/STI → 7 Users (Components test / Tester / Sensors / Cubesat / Optical fibers / RPL dosimeters…) EN/EL → 3 Users (Data concentrator / Light system / UPS system) TE Department (8 users) TE/EPC → 3 Users (FGCLite/ Components test / Tester / Full power converter system …) TE/MPE → 2 Users (Remote I/O interlocks equipment, QPS equipment) TE/CRG → 3 Users (Beam screen heaters system / Remote Sipart positioners …) BE Department (3 users) BE/RF → 2 Users (High bandwidth solid state amplifiers / PS electronics) BE/ASR → 1 User (Ionization chamber electronics for Linac4) IT Department (1 user) IT/CS → 1 User (Safety and network repeaters) PH Department (3 users) PH/ESE (collaboration with PH/UAT and University of Liverpool)→ 1 User (ASICs test) PH/AID → 1 User (MAPs sensor) PH/ULB (collaboration with INFN) → 1 User (LHCb RICH readout detector system) External users (14 users) France : University of Montpellier, Zodiac system company → Cubesat / Memories / Mixed Analog Digital devices / Full digital system / dosimeters …) Spain : University of Malaga → Dosimeters USA: Brown University → CMS HF Front end electronics cards / full crate Germany: DLR, Infineon → Applications for Robotic in space / Memories Czech Republic: IEAP → Timepix Japan: KEK, Hiroshima University → NE213 measurements Russia: URSC ISDE Institute → Cross calibration / space applications + More → Still in discussion

11 List of users – Requests Received
For the Moment I got 7 radiation test requests: TE/EPC : Components tester TE/MPE: Remote I/O interlocks equipment TE/MPE: nDQQDG board PH/ESE: ASICs test (Blown up beam) PH/AID: MAPs Sensors PH/UCM: CMS HF Front end (electronics board + crate - 2 slots of irradiation) EN/EL: Field concentrator for the supervision of the electrical network Any others ?