Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

School of Medicine Emergency Planning David H. Silberman & Keith A. Perry Stanford University School of Medicine.
Welcome to American #2 Wastewater Treatment Plant.
Hospital Emergency Management
Area -10,1km2, Inhabitants – (2013) –  Shareholder – Saldus municipality  Operation area – Saldus town  Activities of Saldus Komunalserviss.
Board of Trustees Roles & Responsibilities During a Disaster Multi-hazard approach.
Disaster Cost Reimbursement Assistance IDAHO BUREAU OF HOMELAND SECURITY.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Steve Schwabe Woolpert Project Manager
1 CITY OF MONROE WASTEWATER DEPARTMENT BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities March 27, 2010.
Join the conference call by dialing the conference number in your Invitation or Reminder s. Please put your phone on mute. Please stand by! The webinar.
Records Emergency Planning and Response Webinar Session 2 Join the conference call by dialing the conference number in your Invitation or Reminder s.
Records Emergency Planning and Response. Overview of Emergency Planning and the REAP.
With Good Flow Data: Greater control Decisions grounded in facts Needs clearly prioritized Remove the risk from planning.
Franklin County Technical School Performance Contract Project.
Super Storm Sandy 2012 Robin Haag Coney Island Hospital Infection Control Department.
Spring 2008 Campus Emergency Management Program Overview
Spring 2009 San Diego State University Emergency Management Program
ECOMMERCE TECHNOLOGY SUMMER 2003 COPYRIGHT © 2003 MICHAEL I. SHAMOS eCommerce Technology ERP Systems.
RETScreen® Energy Efficiency Projects
1 Facilities Operations and Maintenance Overview Part 5 of 5.
CE HYDRAULICS ENGINEERING
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
Unit 3: Command & Control IC/IMT Interface
United States Department of Health & Human Services Office of the Assistant Secretary for Preparedness and Response Bill Mangieri CBCP, CHEP Region VI.
City of Lynden Ambulance Utility Cost of Service and Rate Study Fire Chief Gary Baar Presented by.
MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 FISCAL YEAR BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
การออกแบบ โรงงานทาง วิศวกรรมเคมี (Chemical Engineering Plant Design) 3(3-0-6)
Hospital Planning. Hospital Planning Team Hospital planning starts with the formation of a planning team : A.Hospital Administration B.Reps from clinical.
3  Why does a supervisor or manager need to be familiar with emergency management terms and concepts?
EDUCATION & STUDENT HOUSING UNIT LEADER HUMAN RESOURCES UNIT LEADER INCIDENT COMMAND CENTER UH 1307D INCIDENT COMMANDER LOGISTICS CENTER CONFERENCE ROOM.
Chapter 8 Support Functions
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Module 1: Orientation to ICS
Office of Risk Management Annual Conference. AGENDA  Remembering 2009  Types of Claims Handled by the Property Unit  What to do after a loss  How.
Section B Inventory Process and Forms. General Inventory Actions %Getting Started Set inventory goals and objectives %Who District Program Manager Site.
Shop Safety and Operations
Allison 2001 Charles Chambers Information Technology 2001 Tropical Storm Allison Recovery.
1 Save Money with the use of Procurement Cards PASBO 47th Annual Conference Hershey, PA March 14, 2002 Presented by: Ray Abbott Vice-President, Government.
FLOOD MITIGATION OBSERVATIONS AND LESSONS FROM A FLOOD IN THE SMITH FIELDHOUSE BRIGHAM YOUNG UNIVERSITY AUGUST 2006.
North Carolina’s Hazard Mitigation Planning Initiative Making North Carolina Homes, Businesses and Communities Less Vulnerable to Natural Hazards.
TFS Science Support Main Categories of Science Support at Toolik Field Station  Science gadget & widget fabrication support  Lab equipment repair & setup.
CtWARN April 2013 Gary Zrelak CtWARN Steering Committee (Connecticut Water & Wastewater Agency Response Network) Connecticut Storm ExperiencesConnecticut.
The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.
KARADUVAR WASTEWATER PURIFICATION PLANT MERSİN. Karaduvar Wastewater Purification Plant is designed for purification of the wastewater from carbon, nitrogen.
Computerized Manufacturing Systems
August 19, hrs. SEOC LEVEL 1 24 Hour Operations.
LESSONS FROM LOURDES FLOOD EXPERIENCE. Repeating the Past Major flooding occurred in April 2005 Major flooding occurred in April 2005 Lourdes remained.
Introduction to Hotel Accounting by Esther Lau, Controller
IN THE BAHAMAS.  Hazardous waste is waste that poses substantial or potential threats to public health or the environment.  In The Bahamas, the treatment,
Procurement Part Two Marketing Logistics Purchasing Decision Variables: How to Rate Suppliers.
Business Continuity & Disaster Recovery Larry Corrigan-Tractor Supply Co Sarah Gunterman-Gunterman Consulting.
Washington State Patrol Office of the State Fire Marshal Unit 5: Command and Support Structure of a State Mobilization.
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
IT Services Model Business Requirements IT Strategies Goals
Wastewater treatment and sludge management in Klaipeda region Chief wastewater treatment engineer Vaidotas Girdvainis.
World War I Veteran’s Camp in 1934, Lower Matecumbe Key (Islamorada area)
High Density Polyethylene Pipes Our Products & Services
PUBLIC ASSISTANCE GRANTS
Data Communication & Networking in Manufacturing System
Green Cleaning to Meet LEED (Leadership in Energy and Environmental Design) Existing (Green) Building Operations and Maintenance Requirements.
Chapter 2 Product Costing: Manufacturing Processes, Cost Terminology, and Cost Flows.
Incident Command System (ICS)
FLOODPLAIN MANAGEMENT FEMA and the Florida Building Code
City of Lynden Ambulance Utility Cost of Service and Rate Study
Yes No Contacted to Receive Residents Notify:
PACE Purchasing Cooperative
Execute Purchase Order South Shore Water Reclamation Facility Building 359 Odor Control System Repairs Commission Agenda Item #8.
Presentation transcript:

Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at floor drains, unit heaters, conduits, air intake ducts Both Fluidized Bed Incinerators and ancillary equipment Entire blower building 1 – Main pump station – Administration building 5 major motor control centers – Lab building – Maintenance shop Both primary sludge pump stations & 1 Return activated sludge station

Fischer Incident Command Operations Planning Logistics Finance / purchasing Anderson/Theodora Broyles/Theodora Dubey / Izzo Fuel Chemicals Hauling & Disp Equipment Inventory communications Prioritize recovery Manpower requirement Locate vendors Process claims Payroll processing Pick up supplies Applications and forms Phones Maintain systems Assign manpower Determine staff needs Direct recovery Support System recovery Komerek/Dow R3M/Canal Engineering Support Short-term systems design Long-term systems design Identify BRSA as-built Electrical system recovery Phone, network, SCADA, internet computers Contractor Support various Temp Pumping, sludge hauling Mechanical-electrical repair Heavy labor & equipment Cleaning Disposal Broyles/Anderson

Administrative Issues: Workforce Logistics Procurement Insurance FEMA Cash flow Technical Issues Communication Sludge Management Power supply Temporary systems

Mitigation Plans 1.Raise all Motor Control Centers 2.Raise Blower Building 3.Flood-proof buildings