1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

T958! Fermilab Test beam experiment to study fast timing counters for FP420 MOU between UTA, Alberta, Louvain, Fermilab (Brandt spokesman) Data taking.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Parameter List Edda Gschwendtner Introduction Parameter list for sub-systems of MICE.
PID activities 1. Summary of work/activities since last CM in Berkeley 2. PID parallel session in Frascati 3. Topics specific to each subdetector CKOV1.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Argonne Laser Test Stand and Fermilab Test Beam Facility Karen Byrum 8 March, 2007 Status of Argonne Laser Teststand (Joint ANL – UC program) Some first.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Software parallel session summary MICE collaboration meeting INFN, Frascati 27/6-05.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
M. Bonesini - MICE CM CERN 24/2/071 M. Bonesini INFN Milano Updates on TOF project.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
1 HERSCHEL: PMT status report The order to replicate PCB for divider of R has been launched on a) digital file for production(promised.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Abort Gap Monitoring Randy Thurman-Keup 6 / 8 / 2004 LARP Meeting.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
1 MICE Beamline PID w Aerogel Counters Ghislain Gregoire, Don Summers, Lucien Cremaldi*, MICE Collaboration Meeting, FNAL, Jun 06.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Downstream Cherenkov Gh. Grégoire University of Louvain MICE collaboration meeting RAL, October 28, 2004 Design study for the Technical Reference Document.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
23/02/07G. Vidal-Sitjes, VCI2007 Vienna Conference on Instrumentation1 The LHCb RICH detector G. Vidal-Sitjes on behalf of the LHCb RICH team Outline:
CDMS II Shielding To Installation To Construction From Design.
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
V0 present status of the V0 project at CERN A. Sandoval, R. Alfaro.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
University of Wisconsin
Preparation for CERN test beam
The Beam Test at Fermilab:
Luminosity Monitor Status
EMU Slice Test Run Plan a working document.
ROBOX modification plans
MICE Beamline PID w Aerogel Counters
Particle ID Diagnostics in the MICE Beamline
Testbeam status report
Presentation transcript:

1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2 L. Cremaldi, CM17 CERN, Feb 24, 2007

2 2 Threshold Aerogel Counters Aerogel Counter L. Cremaldi, CM17 CERN, Feb 24, 2007

3 A B C ISIS Beam Line

4 Magnetic Shielding- 2D Model 9.4% 4.6% 3.4% 3.3% 58% 48% 41% 17% B tube = 10%B Z + 60% B  B Z  g, B  <5g BZBZ BB L. Cremaldi, CM17 CERN, Feb 24, 2007

5 - H20 fraction is negligible. - Tested with low energy betas. - Background may be dominated by  -rays, etc. L. Cremaldi, CM17 CERN, Feb 24, 2007

6 Rate Tests L. Cremaldi, CM17 CERN, Feb 24, 2007

7 Rate Tests L. Cremaldi, CM17 CERN, Feb 24, 2007

8 Transistor base prototype Resistive base RCA 8854 Transistor base L. Cremaldi, CM17 CERN, Feb 24, 2007

9 Transistor Base L. Cremaldi, CM17 CERN, Feb 24, 2007

10 CKOV1 Electronics CAEN V Channel 14 bit 100 MS/s FlashADC ps  t resolution CAEN V1290 TDC 25 ps  t resolution 20 ns.div L. Cremaldi, CM17 CERN, Feb 24, 2007

11 -Machining- UM -Nickel Plating -Ready in Spring '07 for light tests Light Box Assembly L. Cremaldi, CM17 CERN, Feb 24, 2007

12 -Needed June/July ‘07. -Aerogel order in Mar’07 -4mo lead time? -Assembly in Mississippi -Ship to RAL in Jul ’07 Radiator Box Assembly L. Cremaldi, CM17 CERN, Feb 24, 2007

13 L. Cremaldi, CM17 CERN, Feb 24, CKOV1 Platform Design-GG -Decision should be made if RAL or US responsiblity.

14 -Magnetic shields and PMT assemblies from Treste. -Mu-metal shield needs modification and re-annealing. -10 PMTs checked at Trieste before shipping to RAL. (UM) PMT + Shield Assembly L. Cremaldi, CM17 CERN, Feb 24, 2007

15 Mirror Flashing Concept Mirror aluminized in 2 sections. Large Vacuum vessel.

16 Mirror Fabrication CERN Facility - Andre Braem - meeting next week FNAL Facility - Eileen Hahn - Lab7 Large Vacuum Chamber- Off Line. Small Chamber- On Line. 90cm id 38cm id L. Cremaldi, CM17 CERN, Feb 24, cm id 60cm od

17 quartz fiber PM T DAQ Gate LED Pulser Non-linear Response Sensitive to LED Vapp Adequate for Monitoring Calibration of 1-Photon LEDs mounted near PMTs Pulser fanned out at CKOV1 Two BNC control lines. VME/NIM PULSER L. Cremaldi, CM17 CERN, Feb 24, 2007

18 Alignment & Self Calibration - 1,2 PE most probable in PMT Small correlation with muon x,y. - Data 1,2 pe signals self calibrating - Some Alignment of CKOV1 by balancing PMT light yield. L. Cremaldi, CM17 CERN, Feb 24, 2007

19 CKOV1 Services m signal cables RG-58 type. 8 CKOV1 signals 2-Pulser 2 spare Should terminate at a patch panel in the Control Room SHV type high voltage cables. - HV supply not specified yet, may start with something simple Lecroy 4032?? -4 Low voltage Monitor cables for humidity sensor, gas flow, etc -Dry air supply for mirror box or silica gel packs. - NIM Crate for Pulser and checkout. ckov1 Contr Room 45m

20 CKOV1 Schedule Mar Apr May Jun Jul Aug Sep Oct ‘07 Light Box Aerogel Order Mirror Assemble PMT Check + Housing to RAL PMT Bases(FNAL) Radiator Box Mirror Assembly Nickle Plate CKOV1 Stand (RAL) Mu-metal Shield Mod(??) L. Cremaldi, CM17 CERN, Feb 24, 2007 Radiator Box

21 Hardware/Software Experience TOF + CKV systems installed by hardware experts. H2 Testbeam CERN User analysis by software experts FNAL. Specialization, wave of the future! L. Cremaldi, CM17 CERN, Feb 24, 2007

22 Full Scale Model of the Royal Crown L. Cremaldi, CM17 CERN, Feb 24, 2007