1 ECL electronics status and plan Vladimir Zhulanov, Yury Usov BINP, Russia 2009.07.07.

Slides:



Advertisements
Similar presentations
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
Advertisements

18/05/2015 Calice meeting Prague Status Report on ADC LPC ILC Group.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
SiLC Front-End Electronics LPNHE Paris March 15 th 2004.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group: A. Baird, D. Bowerman,
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
C-Card and MMFE using the BNL Peak Finding ASIC (VMM1) Ken Johns, Joel Steinberg, Jason Veatch, Venkat Kaushik (U. Arizona)
31st July 2008AIDA FEE Report1 AIDA Front end electronics Report July 2008 Progress Virtex5 FPGA choice Milestones for prototype delivery.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Institute of Experimental and Applied Physics Czech Technical University in Prague 11th December 2007 Michal Platkevič RUIN Rapid Universal INterface for.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
INSTR-08, BINP, Novosibirsk 1 Belle calorimeter upgrade B.Shwartz, Budker Institute of Nuclear Physics Novosibirsk on behalf of BELLE calorimeter.
SuperKEKB 1st open meeting 1 Belle calorimeter upgrade B.Shwartz, on behalf of BELLE calorimeter group.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Napoli October 2007 WG3 - Pierre Edelbruck FAZIA WG3 – Front End Electronics.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
Outer Tracker meeting NIKEF 27 July Dirk Wiedner Status of the OT readout electronics in Heidelberg Dirk Wiedner, Physikalisches Institut der Universität.
1 Hall D Drift Chamber ElectronicsFJ Barbosa Drift Chamber Review6-8 March 2007 Electronics for CDC and FDC Hall D 1.Motivation 2.ASIC Development 3.Preamp.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
12th May 2008AIDA FEE Report1 AIDA Front end electronics Report May 2008 Progress Data compression Plan for prototype delivery.
Building blocks 0.18 µm XFAB SOI Calice Meeting - Argonne 2014 CALIIMAX-HEP 18/03/2014 Jean-Baptiste Cizel - Calice meeting Argonne 1.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
Mircea Bogdan, NSS2007 Oct. 27-Nov.3, 2007 – Honolulu, Hawaii1 Custom 14-Bit, 125MHz ADC/Data Processing Module for the KL Experiment at J-Parc M. Bogdan,
CDC readout system status MT 2009 July 7. BELLE II CDC readout electronics CDC.
CCD Cameras with USB2.0 & Gigabit interfaces for the Pi of The Sky Project Grzegorz Kasprowicz Piotr Sitek PERG In cooperation with Soltan Institute.
Front-end readout study for SuperKEKB IGARASHI Youichi.
Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Status of NA62 straw electronics Webs Covers Services Readout.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
ASIC Activities for the PANDA GSI Peter Wieczorek.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
DOM MB Test Results at LBNL Main Board Readiness Status Review LBNL, July 2003 Azriel Goldschmidt.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
DAQ ELECTRONICS 18 March 2015MEG Collaboration Meeting, Tokyo Stefan Ritt.
The SuperB EMC Front End electronics Prototypes Valerio Bocci 2009 INFN sezione di Roma Valerio Bocci A. Papi, C. Cecchi, P. Lubrano (INFN Perugia) M.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
ZHULANOV Vladimir Budker Institute of Nuclear Physics Novosibirsk, Russia Beijing
VFE & PCB Status & schedule of production Presented by Julien Fleury Christophe de La Taille, Julien Fleury, Gisèle Martin-Chassard.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
Organization for Micro-Electronics desiGn and Applications HGCAL Front-End Electronics Christophe de LA TAILLE, Marcello MANNELLI sept 2015.
The SuperB EMC Front End electronics Prototypes
Status of the ECL DAQ subsystems
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
14-BIT Custom ADC Board Rev. B
Discussion Items Clock PC and/or VME CPU Trigger readout
CALICE COLLABORATION LPC Clermont LAL Orsay Samuel MANEN Julien FLEURY
Electronics requirements for special diagnostics for the XFEL
GlueX Flash ADCs 3425 PMT channels Forward, Barrel Calorimeters
Christophe de La Taille, Julien Fleury, Gisèle Martin-Chassard
Belle calorimeter upgrade on behalf of sBELLE calorimeter group
Christophe de La Taille, Julien Fleury, Gisèle Martin-Chassard
BESIII EMC electronics
JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
Trigger session report
FEE Electronics progress
3rd Open Meeting of the Belle II Collaboration
FEE Electronics progress
Signal processing for High Granularity Calorimeter
Beam Beam electronics Block diagram disc gated disc gate disc gated
Presentation transcript:

1 ECL electronics status and plan Vladimir Zhulanov, Yury Usov BINP, Russia

Barrel electronics 2 16 channels / shaper, FADC, pipeline, DSP on shaper board 12 DSP-shapers / collector

Shaper-DSP 3 The second version is ready and waits to be delivered. Modifications: 1.ADC redesign 2.Tantalum  ceramic 3.Supply 5  7.5, 12  15 4.Tail compensation for FAM

4 Noise Some PCB layout problem

Dynamic range 5 Good linearity

ECL-COLLECTOR 6 SER/DESER LVDS drivers, SCK, RCK 12 Shaper- DSPs FPGA with embedded CPU RocketIO FINESSE Flash memory 512 MByte DDR2 memory 512 MByte DAC LVDS TTD PLL RCKSCK calib FAM Clock Ethernet PC

Endcap electronics A faster preAmplifyer and shaper are needed for endcap with pure CsI. The new preAmplifyer design has been tested on beam with pure CsI. Noise is ~1000 e. The first prototype of the preAmplifyer will be ready in August. The Shaper (CAMAC version) with 30 ns shaping time was used in beam test. The new shaper design will be ready in Oct

Status & plans 1.The design of Shaper-DSP is ready. The ADC problem must be solved in the second version of the Shaper-DSP. 2.The new FINESSE (with MGT) and ECL_COLLECTOR are needed to verify the whole data path. 3.The schematics of the ECL COLLECTOR is ready. 8 Main goal: start mass production of Shaper-DSP in FY2010

Thank you 9

Waveform fitting 10

ECL FINESSE 11

Shaper-ADC and ECL FINESSE 12