AAQG Project # 56 Harmonized Process/Standard Oversight / Surveillance Prepared by: Tim Lee The Boeing Company The Boeing Company June 7, 2005 June 7,

Slides:



Advertisements
Similar presentations
Company Confidential Registration Management Committee (RMC) Other Party (OP) Assessor Workshop San Diego, CA January 20, AS9104/2 Oversight Process.
Advertisements

Company Confidential Registration Management Committee (RMC) 1 Other Party Management Team (OPMT) Resolutions Stanley Faust Spirit AeroSystems Other Party.
Registration Management Committee (RMC) Other Party (OP) Assessor AS Workshop January 24, 2008 – Mesa, Arizona AAQG RMC 101 Registration Management.
Prepared by: Tim Lee – Chair IAQG OPMT The Boeing Company October 10, 2013 International Aerospace Quality Group (IAQG) Other Party Management Team (OPMT)
Company Confidential Registration Management Committee (RMC) OP Assessors Need to Know 1 Other Party (OP) Assessor Workshop Palm Beach Gardens, Florida.
Company Confidential Registration Management Committee (RMC) Other Party (OP) Assessor Workshop San Diego, CA January 20, /9110/9120:2009 AQMS.
1 IAQG Other Party Management Team (OPMT) - Report to the IAQG General Assembly Montreal Canada – October 7 th, 2005 Michael C. Roberts IAQG OPMT Vice.
Company Confidential Registration Management Committee (RMC) The OP Assessor Process San Diego, CA January 19, 2012 Melvin L. Jeppson ATK Propulsion Systems.
The OP Assessor Process
Other Party Management Team (OPMT) Status Briefing Americas Aerospace Quality Group (AAQG) Registration Management Committee (RMC) Tim Lee – Chair The.
Company Confidential Registration Management Committee (RMC) What’s Next for Oversight? 1 Other Party (OP) Assessor Workshop Palm Beach Gardens, Florida.
Company Confidential Rewrite Team Proposal Tim Lee - OPMT.
1 SAE AIR5359A Requirements for Registration of Quality Systems to AS9100 Nik Sutton Boeing IDS This briefing contains non technical data reviewed by Export.
Company Confidential Registration Management Committee 1 Industry Controlled Other Party (ICOP) Oversight Market Surveillance AS9104/2A Supplemental Oversight.
Company Confidential Registration Management Committee (RMC) Audit Calc Program Palm Beach, Florida January 16, 2014 Tim Lee The Boeing Company.
Company Confidential 1 JAPC Update Buck Crenshaw, JAPC Deputy –Chairman Tony Gutierrez, JAPC Manager 20 January 2010.
9104/1 Rewrite Team Report / Review to the AAQG-RMC 11 March 2009 Michael C Roberts Boeing, Technical Fellow.
Other Party Management Team (OPMT) Report Rick Downs Textron – Cessna Aircraft IAQG OPMT Chair March 11, 2009.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
Americas Aerospace Quality Group AAQG Project #56 Harmonized Oversight Process AS91XX.
Registration Management Committee (RMC) Aerospace Auditor Workshop July 30 – 31, 2009 Minneapolis, MN AAQG RMC 101 Industry Controlled Other Party Structure.
Other Party Management Team (OPMT) Status Briefing Americas Aerospace Quality Group (AAQG) Registration Management Committee (RMC) Tim Lee – Chair The.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
Company Confidential 1 AS9104/2A Oversight Standard Revision Report Tim Lee Project Chair September 11, 2012.
Company Confidential 1 Other Party Management (OPMT) 9104/1 Special Sub Team Recommendation Summary Tim Lee & Ian Folland June 23, 2010.
׀ 1 Industry Controlled Other Party (ICOP) Supplemental Oversight Process 2008 Strategies & Initiatives Prepared by: Boeing Oversight Representative (BOR)
Rewrite Team Report to the RMC RMC Annual Meeting January 2008.
Company Confidential Oversight Revision Report Long Beach 14 Sept 2011 Tim Lee Project Chair.
IAQG Other Party Management Team (OPMT) - Report to the IAQG General Assembly San Diego, California – April 6, 2006 Rick Downs IAQG OPMT Chair.
AAQG RMC Meeting AS9104 Discussion. Purpose The AS9104 document will be reviewed and revised in This is a general discussion and your opportunity.
Registration Management Committee (RMC) Other Party Assessor Workshop January 16, 2009 – Orlando, Florida AS/EN/SJAC Oversight Process Tim Lee The.
1 IAQG Oversight Team Report (Other Party Management Team) (Abridged Version - mcr) Amsterdam – April 27 th, 2005 Julio Perez Caballero IAQG OPMT Chair.
Registration Management Committee (RMC) Other Party (OP) Assessor Workshop January 16, 2009 – Orlando, Florida AAQG RMC 101 Industry Controlled Other Party.
1 IAQG OPMT Workshop International Aerospace Quality Group Other Party Management Team Workshop Session #1 Melbourne, Australia April 18, 2007 Hosted by:
Company Confidential /2 Oversight Revision Report San Diego, CA 19 Jan 2011 Tim Lee Project Chair.
Company Confidential AAQG RMC Meeting January 19, Other Party Management (OPMT) Team AAQG RMC Report Tim Lee, The Boeing Company OPMT Chair January.
Company Confidential IAQG Workshop October 21, IAQG Workshop 9100 Certification Scheme Certification status – Changes implemented Tim Lee The Boeing.
Tim Lee The Boeing Company September 17, ICOP Oversight Revision Status.
Registration Management Committee (RMC) Auditor Training and Workshop Minneapolis, MN July 30-31, 2009 Americas Aerospace Quality Group AAQG Registration.
Report on AS/EN/SJAC 91xy Requirements for Aerospace Auditor Competency and Training January 30 & 31, 2006 February 1, 2006 Orlando, Florida.
Registration Management Committee (RMC) January 22-23, 2008 Phoenix, Arizona AAQG RMC Surveillance Team Report 2007 Prepared by: Susie Neal Goodrich Corporation.
July 21, 2016 Susie Neal Director QMS Compliance UTC
Tim Lee The Boeing Company January 20, 2010
Oversight Revision Report
Aerospace Auditor Workshop
AAQG Registrar Management Committee (RMC) SAE AS9104/AIR5359 OVERSIGHT RMC Procedure 102 REV 5 Changes 15-Sep-18.
Communication Sub-team Report
AAQG Member AS/JISQ Supplemental Oversight
AAQG Surveillance Team Report
AAQG RMC Surveillance Team Report 2006
Americas Aerospace Quality Group AAQG Project Management
IAQG Other Party Management Team (OPMT) AAQG RMC Report
July 21, 2016 Susie Neal Director QMS Compliance UTC
AAQG RMC OASIS Multi Site Issue
AS9104/2 Oversight Revision Report
ICOP – Industry Controlled Other Party
AAQG Member AS/JISQ Supplemental Oversight
New 9100 QMS Standard New 9101 Audit Process Standard
AS Risk Mitigation Plan
AS9104/2 Oversight Revision Report
AAQG RMC Surveillance Team Report 2008
Authorities Recognition of "Other-Party" Approaches
Tim Lee – Chair The Boeing Company July 13, 2012
9104/2 Oversight Revision Report
AAQG RMC Surveillance Team Report
AAQG RMC Surveillance Team Report
OP Assessor Training An Overview.
Tim Lee The Boeing Company Chair IAQG OPMT October 22, 2010
AAQG RMC Surveillance Team Report 2010
AAQG RMC 2007 Other Party (OP) Assessor Training
Presentation transcript:

AAQG Project # 56 Harmonized Process/Standard Oversight / Surveillance Prepared by: Tim Lee The Boeing Company The Boeing Company June 7, 2005 June 7, 2005

Discussion Topics Team Members Team Charter Team Deliverables Team Activities Issues Summary

l l Team Members Tim Lee, Lead The Boeing Company Jean Louis Bounie Airbus Shuji KomoriFuji Heavy Industries Tamaki Nakagawa Kawasaki Heavy Industries Lori ScheidANAB (ANSI National Accreditation Board)

Team Charter Develop an internationally harmonized (91XX) standard for AB/CRB oversight by Sector Management Structures and IAQG Original Equipment Manufacturers in support of AS9104 requirements Team Deliverables The AS/EN/SJAC 91XX Oversight Standard ECD for initial routing of draft July 31, 2005 IAQG OPMT & AAQG/EAQG/APAQG RMC Publication by January 2006 Status reports regarding team progress to the AAQG and IAQG Registrar Management Committee (RMC) Disposition of comments received and updates to the (91XX) standard once the initial draft document has been routed

Team Activities The team has meet via telecon on six occasions Monthly through May, bi-weekly beginning in June The working draft has been created Using existing processes as the benchmark (e.g. RMC 102, TS157) Agreed to use and define the term "Assessor" “An IAQG Member Representative that has been qualified in accordance with this standard and supports an Industry Controlled Other Party Management Team (OPMT) joint team assessment or conducts independent oversight activity in accordance with this standard.” The team agreed that when making reference to the overall Aerospace accreditation/certification scheme we would use the term Aerospace Industry Controlled Other Party (ICOP) scheme. When referring to IAQG oversight management we would use the term Other Party Management Team (OPMT)

Team Activity The team will have a face to face meeting the week of July 11, 2005 to finalize the AS91XX draft The final table of contents: The IAQG OPMT has agreed to expand oversight to include Personnel Certification Bodies (e.g., RAB/QSA) and Training Approval/Certification Bodies Current Oversight Processes do not include these bodies The team members are conducting a process review to identify how each sector operates (e.g. ANAB relationship with RAB/QSA in the Americas) Assessor Qualifications will be contained in the new (AIR5493/AS91XX) writings.

Summary The draft is in work and progressing towards initial routing (July 05) AAQG RMC will be provided the opportunity for review and input prior to formal balloting. Ballot at Montreal IAQG meeting (Oct 2005) Your support and feedback is greatly appreciated by the team