Project presentation Templet (4-7 slides) (maximum 10 minutes)

Slides:



Advertisements
Similar presentations
Presented by Daniel E. DuBois. Lessons Learned Developers – dont fall in love with your projects What do I mean ?
Advertisements

1 Wyoming Infrastructure Authority November 10, 2009 Superconductor Electricity Pipelines.
Econnect Ltd Independent specialists in the grid integration of renewable energy...
Charlie Salamone Cape Power Systems Consulting Presented at the Northeast Sustainable Energy Association’s Wind Project Development Strategies for New.
From Analysis to Strategy
Chapter 5 THE IMPORTANCE OF SCALE AND TIMING IN PROJECT APPRAISAL.
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
Principles of Management Learning Session # 26 Dr. A. Rashid Kausar.
A review of offshore wind power grid connection options in the Bothnian Bay Offshore grids for wind power integration Sisu Niskanen VTT Technical Research.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.
Chapter 2 – Operations Strategy for Competitive Advantage.
The Australian/New Zealand Standard on Risk Management
Strengths This is an example text. Go ahead an replace it with your own text. This is an example text. Opportunities This is an example text. Go ahead.
Alternativenergy Flat Ridge Wind Facility Ted Hofbauer – Asset Manager.
SWOT Analysis Strengths, Weaknesses, Opportunities, Threats.
Economics of The Yankee Ridge Wind Farm Project Mark E. Hardwidge Rachael Jabusch.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
授課教師 : 吳元康 老師 學生 : 詹博雄 HVDC Connection of Offshore Wind Farms to the Transmission System.
A Case Study in Community Wind New Ulm Public Utilities Commission - Success with Due Diligence Welcome.
Analyzing the Current Situation. Today’s Discussion (Overview) Environmental Scanning and Analysis Analyzing the Internal Environment Mission Resources.
Wind Farm Design and Engineering Mark Legerton Head of Engineering and Supply Chain April 2010.
DC Superconductor Cables for Long Distance Transmission 2009 Mid-America Regulatory Conference Traverse City, MI June 14-17, 2009.
Turkish Power System Overview March 2012
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
EG-Power European Green Power. «No Cake Without Electricity»
Discussion of Resource Plans Michael Schilmoeller for the Northwest Power and Conservation Council Wednesday, June 10, 2009.
MGT-519 STRATEGIC MARKETING AAMER SIDDIQI 1. LECTURE 9 2.
DALLAS BAR ASSOCIATION ENERGY LAW SECTION REVIEW OF OIL & GAS LAW XXIII SEPTEMBER 11-12, 2008 Lisa Chavarria Stahl, Bernal & Davies, LLP Austin, Texas.
Town of Orleans Wind Energy Project Berkshire Renewable Energy Summit June, 2005 Kevin Galligan
 Transmitting power at high voltage and in DC form instead of AC is a new technology proven to be economic and simple in operation which is HVDC transmission.
NASCAR PROJECT Presentation Layout. Slide 1 – Company Selection  Name of Company  What they produce/make/sell  Brief History  What types of Advertising.
Offshore Wind Power Technologies, Economics Aleksandras Paulauskas, SSI.
Principles and Practice of Marketing David Jobber Chapter 2 Market Planning: An Overview of Marketing.
Structure of Organisations Slide 1. Structure of Organisations Slide 2 Business Plan Description of the Business –What it does (or will do) –Size, location,
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
The Business Plan: Creating and Starting the Venture
BI Marketing Analyst input into report marketing Report TitleElectricity in Madagascar Report SubtitleCountry profile of power market trends and investment.
An Overview of the Technology and Economics of Offshore Wind Farms
Engineering, Policy, Finance
Wind Turbine Power Plant. Sources ●
BI Marketing Analyst input into report marketing Report TitleElectricity in Namibia Report Subtitle Country profile of power sector, market trends and.
TuuliSaimaa Oy (WindSaimaa Ltd) is a Finnish company located at city of Lappeenranta.TuuliSaimaa Oy (WindSaimaa Ltd) is a Finnish company located at city.
SWOT Analysis The SWOT (strengths, weaknesses, opportunities and threats) analysis identifies and describes the organization’s strengths and weaknesses.
Design of Proposed Wind Turbine Tower Testing Facility at the University of Wyoming Original Design (Fall 2011): Wade Burkett Margaret KimblePresented.
05 October 2009 Heike Thomsen, BEUC SWOT Analysis - Emphasis on your organisation -
RECENT TRENDS IN POWER SYSTEMS
Cover slide Project, course, team, date. Outline welcome  1 slide introducing the key sections/ information items in this presentation.
Operation of power systems with high shares of wind power
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
Estimation of the Optimum Wind Turbine Size for Two Different Offshore Sites and Wind Farm Rated Powers MSc. Candidate: Shajid Kairuz Fonseca Supervisor:
Peter Reynolds CEO, Early Childhood Council (May, 2012)
What are the strengths, weaknesses, opportunities and threats in relation to your organization when reporting to the Committee on the Rights of Persons.
Future Business Leaders of America Wednesday September 19th
Shouldice Hospital Case
Input your Massage Text / Input your Massage Text
SWOT Analysis Use this space for description of Strengths: Point 1
WIND TURBINE GENERATORS.
کنکور کارشناسی ارشد 93 مدیریت
Arkansas Junction Energy Project
Engineering, Policy, Finance
כלי אבחון.
HVDC Transmission Systems:
Evaluation of wind farm layouts
Lockeford Elementary School Kindergarten Construction
STRENGTHS WEAKNESSES OPPORTUNITIES THREATS SWOT.
“Қазіргі таңда жастарға ақпараттық технологиямен байланысты әлемдік стандартқа сай мүдделі жаңа білім беру өте-мөте қажет” Н.Ә. Назарбаев.
Strategic Analysis.
ENG. Julius Ndirangu and
Funder Preferred Risk Allocation
Presentation transcript:

Project presentation Templet (4-7 slides) (maximum 10 minutes)

Project background & overview Location, distances Average wind speed, wind direction Limits (area, MW, height, depth, etc) Installed MW Production Investment cost etc

Turbine layout (2 layouts?) Technology (turbines, fundations) Micro siting Wake and other losses Production etc

Cable layout Technology (AC, DC?) Internal grid Total cable lenght Dimensions etc Substation (s) Interconnection to shore

Economics – Key figures Inputs Assumptions Results (Key Figures: NPV, IRR, COEL etc) Risks etc

OPTIONAL Project time schedule (and organisation) Only construction phase included Separate between different activities such as wind turbines, fundations, cables, etc

SWAT analysis Strengths Examples: Special expertis, reputaion, cost advantages, technology advantages, etc Weaknesses Examples: Limited service facilities, marketing deficiencies, management and staff problems, etc Opportunities Examples: New technology, lack of dominant competition, new markets or services, etc Threats Examples: New or increaased competition, insurance plan, adverse demographic changes, adverse govt. Polices, economic slowdown, etc INTERNALINTERNAL EXTERNALEXTERNAL