Project presentation Templet (4-7 slides) (maximum 10 minutes)
Project background & overview Location, distances Average wind speed, wind direction Limits (area, MW, height, depth, etc) Installed MW Production Investment cost etc
Turbine layout (2 layouts?) Technology (turbines, fundations) Micro siting Wake and other losses Production etc
Cable layout Technology (AC, DC?) Internal grid Total cable lenght Dimensions etc Substation (s) Interconnection to shore
Economics – Key figures Inputs Assumptions Results (Key Figures: NPV, IRR, COEL etc) Risks etc
OPTIONAL Project time schedule (and organisation) Only construction phase included Separate between different activities such as wind turbines, fundations, cables, etc
SWAT analysis Strengths Examples: Special expertis, reputaion, cost advantages, technology advantages, etc Weaknesses Examples: Limited service facilities, marketing deficiencies, management and staff problems, etc Opportunities Examples: New technology, lack of dominant competition, new markets or services, etc Threats Examples: New or increaased competition, insurance plan, adverse demographic changes, adverse govt. Polices, economic slowdown, etc INTERNALINTERNAL EXTERNALEXTERNAL