Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.

Slides:



Advertisements
Similar presentations
05/31/131 MicroBooNE photon collection system 1. Introduction 2. PMT unit 3. Installation 4. Performance 5. Conclusion Teppei Katori for the MicroBooNE.
Advertisements

S. Bricola, A. Menegolli, M. Prata, M.C. Prata, G.L. Raselli, M. Rossella, C. Vignoli INFN and University of Pavia - Via Bassi, 6 – Pavia – Italy.
Hamamatsu Photonics K.K. Electron Tube Division R for ICECUBE 1.Delivery Record and Plan 2.Specification of R Test Result at Hamamatsu.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Demonstration and comparison of photomultiplier tubes operation at liquid Argon Temperature Ettore Segreto LNGS (Italy) On behalf of the WArP Collaboration.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Catania VLVnT09 Athens, Greece 1/14 Catania Performances of four super bialkali large area photomultipliers with respect to.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
SINP MSU, July 7, 2012 I.Belolaptikov behalf BAIKAL collaboration.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Compressor status AWAKE Technical Board meeting 19 August 2015.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
Catania 11 ICATPP october, 2009 Como 1/12 Catania Comparative measurements of the performances of four super bialkali large.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Cold PM test at Indiana final measurements, September 9 – 24, 2007 PM under test: Hamamatsu R7725 serial # ZK3692 (tube with Pt underlayer) Hans-Otto Meyer.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Characterization of the QUartz Photon Intensifying Detector (QUPID) Artin Teymourian UCLA Dark Matter Group Dept. of Physics and Astronomy.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 4 Tile Detector Assemblies 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) WBS
Installation of the T600 at Fermilab CSN2, September 22,
About PMTs first series cold and warm tests G. Raselli (INFN and Universita di Pavia) F. Tortorici (INFN and Universita di Catania) M. Rossella (INFN and.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
WPs assigned to the Accelerator Sector Groups for the neutrino platform TE-VSC involvement in: Tetra-Phenyl-Butadiene (TPB) coating of photomultipliers.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Characterization of Hamamatsu R12199 PMTs Oleg Kalekin KM3NeT Meeting CPPM, Marseille
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
Status procurement of PMTs Oleg Kalekin KM3NeT WPF/L General Meeting Amsterdam
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
High energy beam transport.
Installation of the T600 at Fermilab
TOTEM Electronics Status
LIU Wire Scanner Milestones June 2017
HF Test station at P5 A.Mestvirishvili.
PMT cabling Gian Luca Raselli INFN Pavia
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
PMT system production, QA and installation
Far Detector Activities Late 2017 – Early 2018
GLAST Large Area Telescope:
Status of the PANDA Solenoid Magnet Production in BINP
Department of Physics and Astronomy,
Status of the PANDA Solenoid Magnet Production in BINP
Prototype cryomodule development
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting

● The present T600 light detection system will be refurbished with new 8” HAMAMATSU R5912-MOD PMTs. ● Given the present TPC mechanical structure, the layout allows a PMT deployment of 90 devices behind each chamber (a total of 360 PMT in the whole T600 detector). ● This design yields a 5% photocathode coverage of the wire plane area. ● The number of photoelectrons collected per MeV of deposited energy in a single TPC is ≈ 5 phe/MeV, allowing the possibility to trigger low energy events (100 MeV) with fairly high threshold and multiplicity. PMT deployment Slide: 220-AUG ICARUS executive meeting Z axis (beam direction) X axis (vertical direction)

PMT procurement The PMT order has been sent to Hamamatsu in August The supply of 400 samples is organized in two parts: 1)a pre-series (20 samples), expected delivery in the second half of September 2015; 2)a series production (380 samples), expected delivery from October 2015, about 100 samples/month. All PMT delivered shall be compliant with the technical requirements reported in the IT-4126/DG-DI/WA104 Tender Form, which specify all the deliverables included in the supply and their technical details. Slide: 320-AUG ICARUS executive meeting

Acceptance conditions Upon delivery the units will be verified if they conforms to the technical requirements. a)For the pre-series units all the 20 PMTs will be tested at warm and at cryogenic temperature. b)For the series production, all the PMTs will be tested at warm temperature, 10% of each batch will be verified in LAr. In case of a deviation of ±10% with respect to one or more of the parameters specified: a)The pre-series will be rejected by CERN and the contractor shall deliver new pre-series units within six weeks at no additional cost to CERN, subject to verification by CERN; b)The number of units to be verified will be increased to 20%. In case the additional 10% of quantity verified is not conform to the parameters specified the entire batch will be rejected by CERN. In such a case the contractor shall deliver a new batch within six weeks at no extra cost for CERN. Slide: 420-AUG ICARUS executive meeting

Areas for PMT activities The main activities for PMT tests, certification, instrumentation and preparation for the final installation will be organized in three different areas at CERN: 1) Warm tests at IdeaSquare building (B3179); 2) Cold tests at building 182; 3) TPB deposition at TE-Laboratory hall (B169). All these areas are being instrumented in order to be ready as soon as the first PMT batches (20 samples) will be delivered. Some complementary measurements (for ex. photo-cathode Quantum Efficiency, TPB deposition certification, Transit Time Spread…) will be carried out in other properly instrumented laboratories. Slide: 520-AUG ICARUS executive meeting

Test area 1 (warm tests) Preparation of an area for PMT warm tests is in progress in the IdeaSquare building (B3179) and it will be completed during the first half of September. A set of optical fibers and cables will connect up to 16 samples under test placed in a dark room to the electronics and optical equipment installed in an adjacent site. Slide: 6 Main planned activities: PMT bases mounting; Functionality check for a few days in dark environment; Single electron response (peak- to-valley ratio and pulse shape); Gain response vs. power supply; Dark count rate; Pulse linearity; … 20-AUG ICARUS executive meeting

Test area 2 (cryogenic tests) Preparation for the cryogenic tests in B182 is progressing. All materials have been ordered and most of them are already available. The dewar for the tests will become available at the end of September. Slide: 7 Planned activities: Functionality check for working at LAr temperature; Operation stability at cryogenic temperature by measuring the gain response for few days. 20-AUG ICARUS executive meeting

Test area 3 (TPB evaporation) Slide: 8 Laboratory tests for the definition of the evaporation procedures (temperature, duration, required compound quantity, TPB coating quality,…) have been already started in Pavia with a local device and will continue at CERN. 20-AUG ICARUS executive meeting TPB evaporation will be carried out in the B169 “TE-Laboratory hall”. The area will become available the first week of September. Transport of the evaporator and related equipment has already been organized.

PMT bases The production of bases for R5912 PMTs is progressing. All the passive components have been ordered and are available for mounting. Printed circuits have been ordered and few prototypes have been checked. The component mounting for 50 samples will be completed the first week of September. Slide: 920-AUG ICARUS executive meeting

Conclusions Slide: 10 ● The PMT procurement and test organization at CERN are well proceeding. ● Other ancillary activities, in particular material supply (cables, TPC compound, optical fibers…) and design of the supports for the final mounting, are going on. ● The upgrade of the light detection system is progressing according to the planned time schedule. 20-AUG ICARUS executive meeting