1 Cost Health Checks Aug 2013 NAVY CEVM 2 Outline BCWP with no ACWP ACWP with no BAC Credibility of the Most Likely EAC Timely detail planning MR health.

Slides:



Advertisements
Similar presentations
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Advertisements

Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
1 Evaluating the Estimate at Completion (EAC) August 2013 NAVY CEVM.
Replanning, Reprogramming, and Single Point Adjustments July NAVY CEVM
N O T E “CLICK” TO CONTINUE… If the slide show is not launched, click on View  Slide Show in the menu bar at the top of the Power Point window. When the.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M30 - Version 9.01 SMU CSE 7315 Planning and Managing a Software Project.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
The Role of Earned Value in Fixed Price Projects Dave Johnson.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Chapter 10: Monitoring and Controlling Change
Project Monitoring and Control. Introduction Goal: ensuring that the project is on time and on budget and/or highlight any deviation from the plan Areas.
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
ENHANCED MANAGEMENT FRAMEWORK FOR IM/IT PROJECT HEALTH CHECK DASHBOARD The Enhanced Management Framework (EMF) for IM/IT, approved by the Treasury Board.
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Project Management Methodology Project monitoring and control.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Chapter 15 Cost Control.
Software Project Management (SPM)
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
Earned Value management This presentation is just a short introduction to a few terms and concepts. I am sure there will be training sessions in the next.
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
1 Lecture 4.3b: Earned Value as the Cost and Schedule Metric (SEF Ch 14) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Project Management 6e..
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
EARNED VALUE MANAGEMENT (EVM) TUTORIALS
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Where Module 04 : Knowing Where the Project Is 1.
PMP Study Guide Chapter 11: Controlling Work Results.
Presented by Niyi Ladipo September 14,  Results of the Survey  What is Earned Value Management (EVM)?  EVM vs. Traditional Cost Management 
EARNED VALUE MANAGEMENT & ORACLE PRIMAVERA P6 TREY MILLER, MBA, PMP ORACLE PRIMAVERA P6 EPPM CERTIFIED IMPLEMENTATION SPECIALIST GLOBAL PROJECT MANAGEMENT,
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
Schedule Control (Earned Value)
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Performance Measurement Baseline Contract Price (Project Price)
Project Monitoring
“PMP® Exam Prep” Earned Value Management
CHAPTER:7 Project Cost Management
Earned Value Management
Project Communication, Tracking, and Reporting
Performance Measurement Baseline Contract Price (Project Price)
Earned Value Management & Oracle Primavera P6
September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)
September 2016 EVM 202—Lesson 8 Integrated Product Team (IPT) Analysis and Performance Case.
Progress and Performance Measurement and Evaluation
Dave Bachman DAU / CDSC September 9, 2004
Earned Value Analysis It is a continuous comparison between the plan of the project data and the actual data. Budgeted and Committed Cost: Variance = Budgeted.
LSST Project EVMS Performance Overview Kevin E
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
Cost Health Checks NAVY CEVM
Cost Health Checks NAVY CEVM
Evaluating the Estimate at Completion (EAC)
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

1 Cost Health Checks Aug 2013 NAVY CEVM

2 Outline BCWP with no ACWP ACWP with no BAC Credibility of the Most Likely EAC Timely detail planning MR health Active Risk & Opportunity Management

3 BCWP with no ACWP BCWP earned without incurred ACWP may indicate a failure to integrate cost and schedule –May also indicate mischarging Both cumulative and current month BCWP and ACWP should be reviewed monthly at the control account level How can work be performed without expending any effort?

4 ACWP with no BAC ACWP incurred for un-budgeted effort represents a breakdown in the integration of budget, scope, and schedule Both cumulative and current month ACWP should be zero for any account or package with zero BAC. Why would effort be expended if not for budgeted scope?

5 Most Likely (ML) EAC Credibility If the EAC requires future cost efficiency that is significantly better or worse than incurred cost efficiency, then the forecast is probably unrealistic –At lower levels of the WBS, some examples of accounts with significant differences between incurred and forecast performance may exist and should be explained; however, instances should be limited To Complete Performance Index for the EAC (TCPI EAC ) and cumulative Cost Performance Index (CPI) should be compared each month at the account and program levels to determine if they differ by 0.1 or more. If so, then the EAC in question is either extremely optimistic or pessimistic Is ML-EAC reasonable given incurred performance?

6 Timely Detail Planning If the contractor is unable to detail plan effort sufficiently far in advance of execution (per their system description requirement), it calls into question their planning capability and general level of baseline control –Potentially results in a situation where effort is being performed while the baseline is still being established. This undermines the objectivity of the baseline plan. Budgets in the defined freeze period should be reviewed each month to be sure that all planning package budgets have either been liquidated and detail planned or deferred to future months for subsequent planning Are work packages planned far enough in advance?

7 MR Health If the pace of MR distribution exceeds the pace of execution, then the contractor is likely to run out of MR for future risk mitigation and unknowns Monthly review of MR as a % of ETC is recommended to ensure that the contractor doesn’t distribute all MR early in the contract MR transaction justifications should also be reviewed to ensure that MR is used in accordance with the system description Can the program sustain the current level of MR use?

8 Active Risk & Opportunity Management If the contractor does not actively manage and/or has not developed cost estimates for identified risks and opportunities, then the EAC is likely understated Risk and Opportunity (R&O) Management Board minutes and the risk register/database should be reviewed to monitor: –level of new/retired risk –Updated valuations and probabilities for active risks and opportunities Ensure that R&O estimates are accounted for in the Most Likely EAC position Is the contractor actively managing and quantifying risk?

9 Point of Contact Navy Center for Earned Value Management (703)