Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Advertisements

NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
Another Route to CP Violation Beyond the SM – Particle Dipole Moments Dave Wark Imperial/RAL WIN05 Delphi June 10, 2005.
Experimental Facilities DivisionORNL - SNS June 22, 2004 SNS Update – Team Building Steve Miller June 22, 2004 DANSE Meeting at Caltech.
Accurate  Spectroscopy for Ultracold Neutrons Jeff Martin University of Winnipeg See also: J.W. Martin et al, Phys. Rev. C (2006) J.W. Martin.
1 Neutron Electric Dipole Moment Experiment Jen-Chieh Peng International Workshop on “High Energy Physics in the LHC Era” Valparaiso, Chile, December 11-15,
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
Electric Dipole Moment of Neutron and Neutrinos
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM January.
Collab 4/15/04 #1 EDMEDM Funding the Project Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Raleigh, NC March 3, 2006.
New nEDM Sensitivity Calculation T. Langford B. Beise University of Maryland 7/3/2008 Simulation Teleconference Starting Points: Work by V. Cianciolo,
Astronomy & Astrophysics Advisory Committee (AAAC) May 11, 2006 Vladimir Papitashvili Antarctic Sciences Section Office of Polar Programs National Science.
EPOCA – 11. June EPOCAConsortiumOrganisation.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
NSF Programs and Possibilities Research Linkages EU-US 23 September 2004 Sylvia Spengler US National Science Foundation.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
LIGO-G M Summary Remarks: Management of LIGO Gary Sanders California Institute of Technology NRC Committee on Organization and Management of Research.
Office of Science U.S. Department of Energy The Medium Energy Program Outline: Program Overview Some Recent Results FY 2008 Funding Summary.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
EDMEDM EDM Fast Start, May 23, 2006He3S, Steven Williamson EDM Fast Start Helium-3 Services (He3S) Steven Williamson May 23, 2006.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
EDMEDM EDM Collaboration Meeting Project Management Fast Start Summary Prepared by: John P. Tapia May 25, 2006.
Collab 4/15/04 #1 EDMEDM UIUC meeting 12/3/2004 Walter Sondheim, P-25, Los Alamos for presentation to The EDM Collaboration UIUC meeting, Urbana, IL UCN.
Collab Store 6/6/07 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June.
P25 Business 11/1/07 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration MIT-Bates, Middleton,
E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.
P25 Interface 5/19/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Subsystem Managers Duke University,
Office of Nuclear Physics Response 12/14/06 #1 Response to the CD-1 Review Report Martin Cooper Los Alamos.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
P25 Business 5/20/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration Duke University, Durham,
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee.
3 He R&D Plan at Los Alamos Takeyasu Ito Los Alamos National Laboratory EDM Collaboration Meeting May 26, 2006 Oak Ridge, TN.
EDM Assembly and Commissioning – or – How to Cut Two Years from the Project P. Huffman and V. Cianciolo.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
P25 Business 2/8/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration ASU, Tempe, AZ February.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June 20,
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Idaho National Laboratory Battelle Energy Alliance Working Group Chair June.
Office of Nuclear Physics R&D 12/14/06 #1 Risk Based R&D Plan Martin Cooper Los Alamos.
LCLS 2009 NSLS-II 2015 APS 1995 BES Light & Neutron Sources SPEAR ALS 1993 HFIR 2008 SNS
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Specifications for the Integrated Tests II Paul Huffman.
Comments on the February DOE Review
Collaboration Business
Background simulations: update and simulations of absorbed dose
Jim Fast Pacific Northwest National Laboratory
GlueX Collaboration Meeting
Neutron and electron electric dipole moments
Technical Summary - ANL
MIRACLES budget: Summary of the 3 configurations
X-Ray Endstations Update
Presentation transcript:

Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration Pasadena, CA February 14, 2007 Collaboration Business

Collab 5/26/06 #2 EDMEDM Outline New institution vote The DOE CD-1 Reprise Review The CD-1 documents Continuing resolution Town Meeting for the Long Range Plan Publications Committee The next collaboration meeting

Collab 5/26/06 #3 EDMEDM Election of New Collaborating Institution Boston University Jim Miller, Lee Roberts et al. Electronics and computers Light collection Machine shop University of Maryland Betsy Beise, Herbert Breuer et al. Simulation and data analysis Electronics

Collab 5/26/06 #4 EDMEDM DOE CD-1 Reprise Review From the DOE: Jehanne Simon-Gillo, Wlodek Guryn, Gene Henry, Eugene Colton by telephone From the NSF: Brad Keister Technical Advisors: John Haines, Roy Holt, John Wilkerson by telephone From EDM: Martin Cooper, Paul Huffman, Doug Beck, Brad Filippone Institutional Managers: Jack Shlachter, Geoff Greene Agenda Response to the CD-1 Review ReportM. Cooper Risk Based R&D PlanM. Cooper Assembly Plan and CD-4 RequirementsP. Huffman Cost, Schedule and Management IssuesM. Cooper December 14, 2006

Collab 5/26/06 #5 EDMEDM Crucial Points to Agreement Project name is now nEDM R&D establishes technical feasibility prior to CD-2 NSF a major partner Cryogenic physicist at ORNL Delays to slow controls and beam guides CD-2 requirement on sensitivity – 30 x 10 –28 e·cm CD-4 completion requirements Cost $ $4.2 = $19M AY$ The CD-1 documents will be on the web once they are finalized

Collab 5/26/06 #6 EDMEDM CD-4 Requirements Distributed Completion Integrated Tests Cryogenic vessel installed at ORNL  Demonstrated to cool the central detector volume to 500 mK  Operated with the magnet coil package, central insert and 3 He services in place Central detector insert installed and cryogenically integrated at ORNL but the following requirements met at LANL  High voltage holds  5 kV/cm with a leakage current < 10 nA  Mean number of photoelectrons from 750 keV of energy deposition is  4  SQUID noise 1  Neutron storage time in similar cell demonstrated to be >100 sec in an independent test Magnet coil package installed and cryogenically integrated at ORNL  /B 0 < /cm at 77 K achieved at Caltech

Collab 5/26/06 #7 EDMEDM CD-4 Requirements Four-layer magnetic shield in storage at Caltech or ORNL  Shielding factor of achieved at Caltech The shields will be installed post project at a time when needed technically. Premature installation will endanger the shields and delay progress towards science because they would be a hindrance to other required operations. 3 He services installed and cryogenically integrated at ORNL but the following requirements met at LANL or Illinois  Produces  /cm 3 of  70%-polarized 3 He in the collection volume as seen with a SQUID  Purifier reduces the 3 He concentration to less than 1 part in  3 He demonstrated to move between volumes with a time constant of 500 sec  Valves shown to operate over 500 cycles Neutron guides installed at ORNL except for the final two meters  Flux out/MW  2x10 6 n/A/cm Å with a polarization  70% An evaluation of the overall sensitivity to be better than 300 x 10 –28 e·cm

Collab 5/26/06 #8 EDMEDM Continuing Resolution Congress will either pass A continuing resolution A budget In either case, the likelihood is no new starts EDM construction is a new start Any more funds in FY’07 are likely OPC, i.e have limited but creative usage Have received $430k this year for R&D and the project office Of the remaining $870k+$110k, DOE may give ~$400k NSF might give $110k or more

Collab 5/26/06 #9 EDMEDM Town Meeting for the Long Range Plan Chicago, January 18-21, 2007 From “Fundamental Symmetries and Neutrino Physics” topical subfield, nEDM got essentially a stand alone recommendation in second place behind DUSEL Likely to result being mentioned as a new initiative in the executive summary of the long range plan Importance to the DOE is unclear Impressive and important to the NSF

Collab 5/26/06 #10 EDMEDM Publications Committee Upcoming conferences Are written conference proceedings treated the same as journal publications?

Collab 5/26/06 #11 EDMEDM The Next Collaboration Meeting At Los Alamos? May, June or when?