TBL BPMs: electronics Antoni Gelonch, Yuri Kubyshin, Xavier Millán, Gabriel Montoro CTF3 Collaboration MeetingCERN, January 16-17, 2007 In collaboration.

Slides:



Advertisements
Similar presentations
Experience of the Spanish collaboration with TBL F. Toral on behalf of the Spanish Collaboration with TBL CERN, CTF3 Collaboration Technical Meeting, 6/5/2010.
Advertisements

5/4/2006BAE Analog to Digital (A/D) Conversion An overview of A/D techniques.
BPS Location in CTF3/CLEX Area Mechanics with PCB Electronics Test Results BPS Linearity Error A linear fit of the wire test measures was done (left) for.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
Analog Electronics Lecture 5.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
CTF3 BPMs October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 1.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
First results from PADI-2 Mircea Ciobanu CBM Collaboration Meeting March 10 –13, 2009 GSI-Darmstadt FEE1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
January 19, 2006PEP TFB R.Akre PEP II Transverse Feedback System Ron Akre William Colocho Anatoly Krasnykh Vojtech Pacak Dmitry Teytelman Uli Wienands.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
1 Accelerator R&D for Future Linear Colliders at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
- CTF3 Collaboration Technical Meeting, 27th Jan BPS amplifier for TBL Gabriel Montoro*, Yuri Koubychine, Antoni Gelonch Universitat Politècnica.
Collimator BPM electronics – Results from the lab, SPS and LHC
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Teachers Name - Suman Sarker Subject Name Subject Name – Industrial Electronics (6832) Department Department – Computer (3rd) IDEAL INSTITUTE OF SCIENCE.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
State Scientific Center of Russian Federation Institute for Theoretical and Experimental Physics ( ITEP )
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
BeamCal Electronics Status FCAL Collaboration Meeting LAL-Orsay, October 5 th, 2007 Gunther Haller, Dietrich Freytag, Martin Breidenbach and Angel Abusleme.
Converter Regulation Board Status WP PO 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 1.
An Inductive Pick-Up (IPU) for Beam Position and Current Measurement
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
6th CTF3 Committee1 BPS Status Report SUMMARY OF TAU COMPENSATION TEST Test performed at CERN AB-BI/PI Labs during the 30 th week. One of the important.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Diagnostics Workpackage G A Blair EUROTeV Final Meeting, DESY, Hamburg 30 th January 2009 Tasks Summary.
FBCT experience at Desy Presenter: Matthias Werner, DESY At CERN Workshop: „Improving the accuracy of the BCT measurements in the LHC“ January 2011.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
- CTF3 Collaboration Technical Meeting, January TBL BPM Electronics: Amplifier Status and Future Work Gabriel Montoro (1), Antoni Gelonch,
CTF3-CLEX 12 July 2006 A. Faus-Golfe1 BPM´s for TBL IFIC group: A. Faus-Golfe, P. Modesto Mechanics UPC group: Y. Kubyshin, G. Montoro, A. Gelonch Electronics.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Duarte December th 2009 LHCb upgrade meeting Tests Front-end Status  Necessity.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Stripline Beam Position Monitors for the High Luminosity LHC D. Draskovic, T Lefevre CERN, BE-BI-QP.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
Specifications Asic description Constraints Interface with PDM board Planning Summary.
- CLICK WORKSHOP, October BPM for TBL: status of the amplifier Gabriel Montoro*, Antoni Gelonch, Yuri Kubyshin Universitat Politècnica de.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Components of Mechatronic Systems AUE 425 Week 2 Kerem ALTUN October 3, 2016.
EUROTeV Diagnostics WP5
Solid State Amplifier Development at PSI
Calorimeter Mu2e Development electronics Front-end Review
LAPP BPM Read-out Electronics
Analog FE circuitry simulation
Calorimeter Upgrade Meeting
Summer Tasks on UAV Radar
The ATLAS LAr. Calibration board K. Jakobs, U. Schaefer, D. Schroff
Breakout Session SC3 – Undulator
Presentation transcript:

TBL BPMs: electronics Antoni Gelonch, Yuri Kubyshin, Xavier Millán, Gabriel Montoro CTF3 Collaboration MeetingCERN, January 16-17, 2007 In collaboration with Ángeles Faus-Golfe, Pablo Modesto

TBL BPMs: electronics2 BPMs at the TBL ♦ 16 BPMs are planned to be installed at the TBL

TBL BPMs: electronics3 H V ∆H ∆V ∑ Inductive pick-up Analog front-end electronics Mechanics IPU electronics Amplifier

TBL BPMs: electronics4 General scheme of the analog head electronics Digital (front-end) block Design by M. Gasior

TBL BPMs: electronics5 Tentative parameters of the BPMs for the TBL BPM analog bandwidth (BPM with associated electronics) 10 kHz -100 MHz (200 MHz is highly desirable) Beam position range of interest +/-5 mm horizontal and vertical Beam aperture diameter22.5 mm Overall mechanical length< 100 mm Number of BPM’s in TBL 18 Resolution at maximum current <5  m Overall precision <50  m Hans Braun, The BPM design for the DBL by M. Gasior cannot be applied directly. Modifications required: a)The dimensions of the BPM (IPU) must be reduced (by a factor of 0.6 approximately) b) The amplifier bandwidth should be broaden up to 200 MHz and attenuator should be added. Typical radiation levels<1000 Gray/year

TBL BPMs: electronics6 Work done (I) a) Amplifier design A: schematics, PCB and tests of the 1 channel b) IPU electronics: design and schematics ● Based on a previous design using AD8370. ● Necessary modifications to meet the requirements to the TBL BPMs have been done. ● The IC is not certified to sustain the existing radiation level.

TBL BPMs: electronics7 c) Amplifier c) Amplifier design B: PCB routing is in progress (to be finished in 2 weeks). The design accomplishes the following characteristics: –10 kHz -200 MHz bandwidth (to be tested in the lab) –Selectable gain (2 gains) –3 outputs: ΔH, ΔV and Σ –± 2 V output level –Differential or unipolar outputs ??? (TBD) –The amplifier can be used as a analog front-end A new feature: the designed amplifier is able to endure 100 Krads (certified by the IC manufacturer) Work done (II)

TBL BPMs: electronics8 Current status Design A  A one-channel prototype has been designed (Design A), built and tested. Required characteristics has been achieved (digitally variable gain and bandwidth up to 750 MHz). Design B  A design of a radiation tolerant version of the amplifier (Design B) has been worked out.  A design of the IPU electronics has been done. The project is carried out with a financial support of the Spanish Ministry of Education and Science.

TBL BPMs: electronics9 Schedule ● Build the full version of the amplifier ● Carry out tests of IPU + amplifier - local test - at CERN test bench (?) January-February March-April April-May Many thanks to Louis Bellier, Hans Braun, Steffen Doebert, Domènec Espriu, Marek Gasior, Gunther Geschonke, Lars Soby

IPU Electronics

TBL BPMs: electronics11 IPU Electronics: schematic

TBL BPMs: electronics12

TBL BPMs: electronics13

TBL BPMs: electronics14

Amplifier Electronics

TBL BPMs: electronics16 Based on a previous design using AD8370. Prototype A: 1 channel

TBL BPMs: electronics17 PCB plot The design has been successfully tested for another application and has shown a good performance. Necessary modifications to meet the requirements to the TBL BPMs have been done. Prototype A: 1 channel

TBL BPMs: electronics18 Prototype A: 1 channel Can it endure 100 Krads? …. We need to test it !!!!

TBL BPMs: electronics19 Prototype B: 3 channels full schematic

TBL BPMs: electronics20 Prototype B: main components Wide-band amplifier IC: THS4508 Positive voltage regulator: RHFL4913 Negative voltage regulator: RHFL7913A ■ All of them sustain 100 Krads according to the manufacturers Note: the full schematic will be available from Gabriel Montoro or as a pdf document on the meeting website

TBL BPMs: electronics21

TBL BPMs: electronics22

TBL BPMs: electronics23

TBL BPMs: electronics24

TBL BPMs: electronics25 We are interested to have a feedback from experts and to cooperate with other groups to validate the developed design B to test the AD8370 IC (design A) under radiation (?) to choose the proper type of: case, connectors and interface (standardization!!!), so that our front-end amplifier can be connected to the digitizer developed by another groups TBD: differential or unipolar outputs