MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November

IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
Automated HIC assembly A. Di Mauro ITS-MFT mini-week
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Hybrid Integrated Circuit
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
Summary: Mechanics - Overview of the MFT in ALICE. - Description of the MFT. - Description of a MFT detection plane. - Environment of the MFT. - Procedure.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Update on tendering for HIC automatic assembly system A. Di Mauro ITS Upgrade Plenary,
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Low Mass Rui de Oliveira (CERN) July
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Marcello Lunardon - ALICE Gluing Meeting 010/03/2003 Study of glues for the assembly of the ALICE Silicon Pixel Detectors Status at The PADOVA.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
L0 Module Testing and Analog Cable What we built so far: –No.3 First prototype with SVX4 (L1 hybrid) –No.4 with irradiated sensor –No.5 Installed on the.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Dec
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
Florian Buchsteiner (HEPHY Vienna)
Berkeley status Aug 10th, 2012.
SVD Electronics Constraints
Ladder Assembly All tools and jigs produced Glue dispensing works
Local Supports for Inclined Layout: CERN Update
Hybrid Pixel R&D and Interconnect Technologies
ALICE-MFT-WP5-FPC- vidyo
Ladder Assembly All tools and jigs produced Glue dispensing works
ob-fpc: Flexible printed circuits for the alice tracker
Gluing jigs for Demonstrator
Soldering process 1 Add the soldering material on the soldering pad of speaker in order to solder the wire on the speaker.
WG4 – Progress report R. Santoro and A. Tauro.
F. Ronchetti, INFN-LNF, September
Module/Ladder Assembly
Flex Status A.Nomerotski, 4 May 2010.
LPKF Laser Direct Structuring System
Presentation transcript:

MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER ALICE ITS, MFT and O2 Asian Workshop

2

Sensor+FPC  Hybrid Integrated Circuit (HIC) with 1 to 5 sensors each. Carbon plastic CFRP stiffener/protector. 3 Alice Muon meeting - Chia - 26th May 2015

ALICE ITS, MFT and O2 Asian Workshop Cold plate Foam Disk support Cooling pipes Manyfold

Simplified ladder model Water velocity in pipes 1 m/s Power distribution 85%(dig)+ 15%(ana) Influence of the water pipe diameter 5 X Z 40 mW/cm 2 50 mW/cm 2

6 Disks 0, 1 & 2 Alice Muon meeting - Chia - 26th May 2015

Pipe diameter Ø1=> Ø2 : Tmax -1.5 / -2°C Composite material - Tmax > 50°C !! - Non cooled sensor impossible with ‘standard’ composite High thermal conductivity composite required (K13D2U) for ‘straight pipes’ configuration 7

Analog part Digital part ALICE ITS, MFT and O2 Asian Workshop WG5 weekly meeting - 12th Mayl 2015 Stiffener in carbone fiber material = cold plate 467MP Heater Dummy sensors FPC Glue 467MP Constantan constantan wire, 100 µm diameter, 62.4  /m Heater, 28  13 x 140 mm, 170 µm thickness Thermal dissipation of a sensor Digital part : 1 mm width,85 % of the power dissipation 2 lenghts of constantan wires Analog part : 14 mm width, 15 % of the power dissipation

ALICE ITS, MFT and O2 Asian Workshop Thermal tests, general diagram Thermal camera Tc recorder Power unit Pomp and chiller HIC Cold plate Water pipe ThermoCouple

ALICE ITS, MFT and O2 Asian Workshop

Micrometric tools to Place sensors (ITS) ALICE ITS, MFT and O2 Asian Workshop Vacuum table(ITS) To keep sensor in position To optimize laser soldering Worktable MFT To align sensors/Flex circuit/laser soldering mask

ALICE ITS, MFT and O2 Asian Workshop Procedure: Sensors alignment Add Flex and Soldering grid. Check alignment of pads sensors and holes Install balls (200µm) on the special tool Put the balls on the soldering grid Install the vacuum box/ make vacuum Soldering the balls

ALICE ITS, MFT and O2 Asian Workshop Features for laser soldering operation:  Quality of the FPC Perfect Ni/Au finishing in the hole. Accurate position of the hole. High cleanness (Washing Workshop).  Good precision for alignment and stacking of Sensors/Flex/Soldering grid/balls.  Clean worktable and sensors Ball FPC hole Soldering grid hole

ALICE ITS, MFT and O2 Asian Workshop Terminal To monitor laser soldering Results: Worktable to be redesign to improve mechanical tolerance A new production of FPC with better quality First HIC (5 chips with just connections soldered )

ALICE ITS, MFT and O2 Asian Workshop FPC : * Several prototypes in copper for mechanical purposes and first soldering, * Final version with traces in aluminum  Very expensive, try to reduce the surface

ALICE ITS, MFT and O2 Asian Workshop * Allowed temperature for FPC integrity: up to 140 °C * Technical choice: Gluing components with conductive glue : H20E * Produced by Epoxy Technology * Provided by FTPolymer in France * Can be cured at 80°C for a minimum of 3 hours * Commonly used for HEP. * Specific SMD components : Pd/Ag plating for gluing curing. * Under discussion with a company for trial

ALICE ITS, MFT and O2 Asian Workshop * Laser soldering worktable * FPC ears cutting system * Worktable gluing support * Tools to handle and store the ladders

First MFT ladder (5 sensors) by November Production at CERN. 504 MFT ladders (2 to 5 sensors). This includes half MFT as spare and 20% of spares ladders. 2 technicians and 1 physicist 10 months 18 ALICE ITS, MFT and O2 Asian Workshop 2015

19

ALICE ITS, MFT and O2 Asian Workshop Design of the prototype done and fabricated for disk 0 Disk support Ladder positioning reference FPC tail cutting tool Dummy cold plate Disk support positioning reference Disk support reference plane

ALICE ITS, MFT and O2 Asian Workshop First assembly of FPCs on a disk : Position of one FPC defined by 2 pins and the connector => risk of overconstrain Tests done, assembling work, => design validated (pins, screw, lenght of FPC)

ALICE ITS, MFT and O2 Asian Workshop On going gluing tests HIC Glue Cold plate Kapton adhesive HIC Glue Cold plate Ladder removable mechanically Removability in whole or in part of the ladder insured by pulling the kapton adhesive Case 2 : Glue only Case 1 : kapton adhesive + glue 1-a HIC Glue Cold plate Kapton adhesive 1-b Others cases... GlueType Eccobond 45 (ITS) Epoxy Adhesive tape 467MP (used in STAR) Transfert adhesive LEDPAD SFH5 2-sided adhesive, acrylic film APTEK 2724 A/B (used in STAR) Silicone Dow Corning SE 4445 (used in ATLAS) Silicone Several glue tested

Disk assembly process, design and specific tooling by April Production half-disks. One week per half-disk assembly, one week for the survey and one week for qualification. Global assembly 4 months on surface and 6 months in the cavern (october 2019). 23

ALICE ITS, MFT and O2 Asian Workshop