RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.

Slides:



Advertisements
Similar presentations
CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
Advertisements

Setup/Installation/Operation of an Environmental Control Unit (ECU)
Basic Refrigeration Cycle
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
31/03/11FV 1 CEDAR from flammable gas safety point of view.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
THE HYDROFLOW STAR FILTER
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Tempest Blower SECTION: Tools and Equipment ISSUED: REVISED: ##-####
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
CLAS12 Drift Chamber Prototyping
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Installation of the T600 at Fermilab CSN2, September 22,
ICARUS Collaboration Meeting Dec A. Scaramelli.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Installation of the T600 at Fermilab Fermilab, February 15,
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Kitakami Side AHCAL Assembly or anywhere in any detector.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Cryoplant Controls Installation
CLAS12-RICH Responsibility, Manpower & Summary
Installation of the T600 at Fermilab
CBETA Technical Review
CLAS12 – RICH RICH - TECHNICAL PARAMETERS PARAMETER DESIGN VALUE
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
NA62 LAV Anti1 REMOVAL & TESTS
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
FRESH Fruits & Vegetables are a part of our daily diet.
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Detector hall in mountain regions
Detector hall in mountain regions
Active Reciprocating Compressor Valve Assembly P16452
Maintenance at ALBA facility: Strategy for the conventional services
TEC assembly and commissioning at Lyon
as a prototype for Super c-tau factory
Presentation transcript:

RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review

Outline 1.Assembly of the detector in the clean room at JLab. 2.RICH transportation to the Hall B 3.RICH Installation in the CLAS12 apparatus. 4.Utilities 5.Conclusions. 2S. Tomassini, D. Orecchini

RICH assembly operation plan The delivery of the components will start after summer: -aerogel (October) -1 st CFRP mirror (March 2016) -RICH mechanical Case (March 2016) The CFRP Mirror test will start in March 2016 in the dark room. The assembly of the RICH module will start in October 2016 (according to the management plan) and will last till the transportation in Hall B (June 2017). The mechanical assembly requires: Clean room: -storage of aerogel -storage and test (dark room) of the mirrors -assembly and alignment of the mirrors -installation of the aerogel in the front panel Normal room: -storage of the RICH module before the beginning of the assembly operations -assembly and tests of the electronic panel The areas must also allow the survey of the module before the installation in Hall B 3S. Tomassini, D. Orecchini

RICH assembly time schedule More details in the assembly document 4S. Tomassini, D. Orecchini M. Mirazita

CLAS12 – RICH ASSEMBLY : EEL m 5.35m 18.30m 7.30m 13.30m Discussed and agreed with Walt Ackers 5S. Tomassini, D. Orecchini CLEAN ROOM -Has been used to assemble the Drift chambers -Available since OCTOBER 2016 after the installation of the Drift chambers -Small areas inside the room will be available since first delivery of materials

RICH ASSEMBLY AREA LAYOUT IN EEL-124 AREA FOR ASSEMBLY AND SURVEY DARK ROOM ASSEMBLY AREA. 1.all the assembly operations will be performed in EEL Dark Room is a removable enclosure AREA FOR ASSEMBLY AND SURVEY The dark room must be available since the delivery of the first CFRP mirror 6S. Tomassini, D. Orecchini

CLEAN ROOM EEL-124 Is equipped with a Gantry Crane Capacity 3 TON A Gantry Crane will be used for mechanical assembly of the RICH case. The rotation of the RICH, once the assembly will be completed, will be performed by means of a winch. 7S. Tomassini, D. Orecchini

List of operations before the RICH module rotation and transportation to Hall B 1.Mechanical assembly of the RICH case after the delivery to Jlab 2.Installation of the glass lateral mirrors 3.Installation of the spherical mirror 4.Alignment of the mirrors wrt the reference system 5.Installation of the electronic panel, cable trays 6.Cabling and Piping (cooling air and purging nitrogen) 7.Installation of the exit panel 8.Installation of the frontal panel 9.Light tightness test and sealing if necessary Rotation and transportation of the RICH module to the hall B S. Tomassini, D. Orecchini8

ROTATION STEP_2 ROTATION STEP_3 1)THE RICH HAS BEEN ASSEMBLED 2)THE RICH IS ROTATED BY THE WINCH 3)THE RICH IS SECURED ON THE TROLLEY 4)THE TROLLEY IS ROLLED OUT THE CLEAN ROOM Rotation of the RICH module S. Tomassini, D. Orecchini9 ROTATION STEP_1 TROLLEY

TROLLEY FOR THE TRANSPORTATION TROLLEY RICH MODULE AN EXPECIALLY DESIGNED TROLLEY WILL BE USED TO TRANSPORT THE RICH TO THE HALL B IN ORDER TO REDUCE AS MUCH AS POSSIBLE THE RISK OF BREAKING THE AEROGEL TILES AND TO NOT STRESS THE AEROGEL SUSPENTION SYSTEM The volume will be closed and sealed in its final assembly and the inner volume will be temporarily fluxed by dry nitrogen 10 Low pressure tires to damp vibrations Jackable wheels for fine adjustment The system can be safely pulled by a Forklift or electric tractor … S. Tomassini, D. Orecchini

Hall B ENTRANCE 11 To easily enter the hall B door, the trolley has an asymmetric shape There are 10 cm of clearance on each side of the door One stirrup must be dismounted and the two patch panels must be folded S. Tomassini, D. Orecchini

Back Rotation once in hall B S. Tomassini, D. Orecchini12 The assembly structure will be dismounted and remounted in Hall B The RICH will be back rotated to the position ready to attach the lifting tool

LIFTING TRIPOD A TRIPOD FOR RIGGING THE RICH MODULE ON THE FORWARD CARRIAGE IS UNDER DEVELOPMENT Details in the Dario’s presentation Crane Counter Weight 13 LIFTING TOOL INSTALLATION S. Tomassini, D. Orecchini

Installation in CLAS12 S. Tomassini, D. Orecchini14 Crane Counter Weight Crane Counter Weight The module will be rotated by means of the hall B crane

Installation in CLAS12 cont’ S. Tomassini, D. Orecchini

UTILITIES S. Tomassini, D. Orecchini16 Compressed air to cool down the electronic panel to keep safe the FTOF Limit temperature is 100F on the FTOF panel Purging Nitrogen to reduce the relative humidity inside the RICH as required to maintain the aerogel performances Total volume is 5 m^3

Electronic Box: Test Cooling Setup Prototype of half of the electronic panel made of Aluminum and PVC and resistive wires to simulate the heating. The box is sealed and has an air inlet and outlet - 50W on the ASIC plane - 150W on the FPGA plane Fresh air fluxed inside the box from a compressor Temperatures measured in few points inside and outside the box Temperature limit for TOF operation is 100 °F /38 °C Cover S. Tomassini, D. Orecchini17 M. Mirazita, V. Lucherini TOF Elec. Panel

Measured Temperatures Air flow is 100 l/min, inlet temperature scaled to 20 °C RICH cover Temp vs Time Inner temperatures FPGA ASIC FTOF Temp vs Time FTOF Surface map Temp Tmax~28Cwell below the requirements 18 M. Mirazita, V. Lucherini

Effect of gravity gravity The Effect of natural convection can be neglected Tmax ~ 37.6 degC Tmax ~ 37.8 degC R. Perrino – INFN-Lecce 19

S. Tomassini, D. Orecchini20 Utilities: Compressor Layout To the Electronic Box Flow rate20,2 l/s Elec. Power10,4 kW Dew Point T3 °C Dimensions1,4x0,7x1,8m Weight515 kg Noise Press60 dB(A) SF11-8 MC FF Installation area: 10 m^2 Cost:  30k€ SF11-8 MC FF M. Mirazita, V. Lucherini

UTILITIES: Purging Nitrogen S. Tomassini, D. Orecchini21  p= 0.5 mbar Flow rate  5 m^3/day

Slow control Elements to be controlled Electronics and MAPMT o High Voltage o Low Voltage Services o Nitrogen gas system - humidity, pressure, flow rate o Electronic cooling system - inner temperature - air temperature, humidity, flow rate o Air Compressors - Functioning status Only instrumentation compatible with JLab will be used (e.g. CAEN HV power supply) In charge of Glasgow group

CONCLUSIONS 23 The assembly procedures in the clean room have been defined The RICH will be transported in the Hall B fully assembled and sealed, safe condition for the aerogel Installation in CLAS12 must be done by minimizing the potentially risky movements Preliminary design of the services done, finalization in collaboration with JLab Slow control will be required to manage standard equipment for JLab S. Tomassini, D. Orecchini

Spare Slides S. Tomassini, D. Orecchini24

Geometry Inner air volume only 3 holes for fresh air inlet Physics Power source on boundary 3: 200 W/m 2 Fresh air inlets on boundary 6: defined through inlet velocity and temperature All other boundaries are adiabatic ON/OFF Gravity volume force along coordinate of choice (e.g. X) Boundary 8: convective outflow Boundary 6: simulates fresh air inlets Boundary 3: large flat heat source gravity Z X Y (Code: Comsol Multiphysics 3.2) S. Tomassini, D. Orecchini25

CLAS12 RICH Assembly area in EEL124 26S. Tomassini, D. Orecchini