RSRDC UNIT - KOTA. ORGANISATION CHART OF RSRDC - UNIT KOTA.

Slides:



Advertisements
Similar presentations
RSRDC UNIT- Quality Control, Jaipur
Advertisements

RSRDC UNIT- II JAIPUR.
RSRDC UNIT-II JODHPUR.
Rajasthan State Road Development & Construction Corporation Ltd.
RSRDC UNIT-IV, JAIPUR. ORGANISATION CHART OF RSRDC UNIT –IV, JAIPUR R.E. Sh.S.S. Vijay ARE Sh. R.K. Vijay ARE Sh.M.K. Saini ARE Sh. Rajiv Sethi ARE Sh.
ELECTRICAL UNIT JAIPUR. JURISDICTION Electrical Works of Following Civil Units are Executed Bikaner Unit – I Bikaner Unit – II Kota Unit Alwar Unit Udaipur.
Q4 FY14 RESULTS PRESENTATION June,2014. OVERVIEW FINANCIAL HIGHLIGHTS PROJECTS INFORMATION 3D Views SAFE HARBOUR This report includes forward looking.
Welcome to the Jurisdiction
1 1 National Highways Development Project(NHDP) Ministry of Road Transport and Highways National Highways Authority of India.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
RSRDC UNIT- II, AJMER.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
Reconstruction of Earthquake Damaged Rural Houses (REDRH)
1 Mid Day Meal Scheme Madhya Pradesh Government of Madhya Pradesh Panchayat & Rural Development Deptt.
LIST OF STAFF S.N o. Name of Employee Designati on Work Load Name of Work Sanction Cost (in Lacs) Work Executed up to date Remainin g work 1.Sh. A.B.
© 2007 Tally (India) Pvt. Ltd. All rights reserved. A Beginning…. Rajasthan State Road Development & Construction Corporation Ltd. Priyam Infosystems Pvt.
Examination 7 th Semester CAHS 71 Bianca Bogdan. Outline Proposal Scheme Design Detail Design 1 Detail Design 2.
BSBPMG522A : Undertake Project Work
REVIEW MEETING ON RURAL DEVELOPMENT SCHEMES UNDER THE CHAIRMANSHIP OF HON’BLE MINISTER, RD Date: , Time: AM Venue:- Secretariat Conference.
1 Freight Operations Information System COM/CCM’s Conference
Finance DEPARTMENT: FINANCE MPUMALANGA PROVINCIAL GOVERNMENT Presentation to Select Committee on Finance on Budget and Expenditure Outcomes for the period.
Civil engineering branches & scopes
IWMP- Maharashtra Annual Action Plan New Delhi- Dt. 19th March 2014 V Giriraj Principal Secretary WC & EGS, Chairman VWDA, Maharashtra State, Pune.
REVIEW ON NREGS – AP BY Hon’ble Chief Minister Date
West Bengal IWMP Annual Action Plan
Summary of IWMP Sr. No. ParticularsYear of AppraisalTotal Batch-I ( ) Batch-II ( ) Batch-III ( ) Batch-IV ( ) Batch-V ( )
Galion City Schools Financial Summary General Operating Fund 3 rd Quarter FY Presented to the Board April 17, 2013.
Progress Review On Ongoing Construction Projects aimed at Budget Professor Ranjith Premalal De Silva Vice Chancellor Uva Wellassa University, Sri.
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
Hydro Electric Power Plant
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
RAJIV GANDHI UNIVERSITY OF HEALTH SCIENCES, KARNATAKA. WELCOME TO ENGINEERING SECTION OF R G U H S, KARNATAKA.
Instructions for On Line feeding of IWMP projects (On departmental website)
SOLAR ROOF-TOP is A necessity for DELHI METRO DR. MANGU SINGH Managing Director, DMRC.
RAJASTHAN STATE AGRICULTURAL MARKETING BOARD JAIPUR
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
Presentation on Annual Action Plan for IWMP State Level Nodal Agency Department of Agriculture Government of Tripura.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
S.NoItem I st Quarter II nd Quarter III rd Quarter IV th Quarter Total Unspent Balance as on (Expected) Actual Requirement (7-8) 1 Batch.
RSRDC UNIT- III JAIPUR. ORGANISATION CHART RE Sh. A.M. Khan ARE Sh. Rajesh Gupta ARE Sh. S.K. Chejara ARE Sh. V.B. Mathur ARE Sh. Rakeev Gupta JEN Smt.
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
COLLEGE OF ENGINEERING KIDANGOOR TEQIP II 7 TH REVIEW MEETING.
SRI DURGA MALLESWARA SWAMY VARLA DEVASTHANAM INDRAKEELADRI: VIJAYAWADA
Project Launch Workshop: New Delhi May 9-10, 2013 State: Maharashtra ICDS Systems Strengthening and Nutrition Improvement Project.
ORGANISATION CHART OF RSRDC UNIT-GURGAON RE SH. SUKESH MATHUR ARE SH. UMESH KUMAR GARG ARE SH. J.M. MITTAL ARE SH. R.D. MEENA ACCOUNTANT SH. SANT LAL.
AGARTALA MUNICIPAL CORPORATION
BACKWARD REGIONS GRANT CAPACITY BUILDING PLAN PANCHAYATI RAJ DEPARTMENT GOVERNMENT OF ODISHA PANCHAYATI RAJ DEPARTMENT GOVERNMENT OF ODISHA.
Ring Road Proposal PWD.
ZADNA Update Iweek Update ZA licensing Late 2009 public consultation Revision of submissions – March 2010 Additional public comment period – May.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
ESTIMATES SANJAY UPRETI PAM. PREPARED FOR Construction or purchase of new works or assets. renewal or replacement of asset chargeable to any of the funds.
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
Residential Construction Drawings
Sarva Shiksha Abhiyan SSA, UT Mission Authority Andaman & Nicobar Islands loZ f’k{kk vfHk;ku CIVIL WORKS.
Presentation on Annual Action Plan for IWMP
Building Division FY2011 Second Quarter Report. 2 nd Quarter Revenues October$93,154 November$53,049 December$50,033 Average Monthly Revenues$65,412 Total.
ActionSoft Tool for Scheme Implementation & Monitoring.
REPORT WRITING IN GRANTS MANAGEMENT PRESENTED BY: O.A. ABIMBOLA FORMER DEPUTY BURSAR (GRANTS) UNIVERSITY OF IBADAN 6 TH APRIL, 2016.
YearNosCost in cr NosCost in cr ROB’s of PWD in Progress Nos.CostExpenditure till Balance
SPMU Details Sl. No. Post under NHP Name Designation 1.
Budget Sib Sankar Banik, W.B.A&A.S Internal Audit Officer
WELCOME ANNUAL ACTION PLAN For IWMP
PRESENTATION TO PUBLIC HEARING ON CONDITIONAL GRANTS 22 MAY 2007
PAB Meeting on National Portal for Mid Day Meal Scheme
Housing & Urban Development Department Government of Odisha
SELECT COMMITTEE ON FINANCE PUBLIC HEARINGS ON CONDITIONAL GRANT
Presentation transcript:

RSRDC UNIT - KOTA

ORGANISATION CHART OF RSRDC - UNIT KOTA

Financial Work Load in Unit FINANCIAL WORK LOAD IN UNIT KOTA S. No. Name of Work Client Deptt. A& F Sanction Expendit ure till date Balance Work ARE – I Sh. Ashu kumar Garg 1 Construction of RTU Kota RTU, KOTA RTO, Kota RTO Const. B. wall Ummedganj. Kota Agr. Uni. Udaipur Police chowki Jagpura Police Deptt Transit Hostel range H. Q. Kota Police Deptt CFC at Kaithoon RUDA MOU Signed Academic block KUK, Kota Mou Under finalisation TOTAL

S. No. Name of Work Client Deptt. A& F Sanction Expendi ture till date Balance Work ARE II- Sh. Basant Kumar Gupta 1 Police Residential Qtrs. Kota Police Deptt ROB Morak LC No. 87 PWD Police Chowki at Indira Vihar Kota Police Deptt Police Chowki at Bajranj Nagar Kota Police Deptt Administrative block SIAM MOU Signed TOTAL TOTAL OF UNIT

RAJASTHAN TECHNICAL UNIVERSITY, KOTA Completion cost – lacs Foundation Stone laid by Hon’ble Chief Minister on Completed in June Important Works Completed during last 5 years

Important Works Completed during last 5 years KOTA UNIVERSITY, KOTA   Completion cost – lacs   Foundation Stone laid by Hon’ble Governer of Rajasthan on & Inaugurated by Hon’ble Education Minister on dated

Important Works Completed during last 5 years RFSL BUILDING,KOTA  Completion cost – lacs  Completed in year

POLICE HOUSING SCHEME No. of Quarters:76 Nos. (16 USQ+60 LSQ) Total Cost: Crores Location:Police line, Baran road, Kota Date of Start: Stipulated Date of Completion: Expenditure till Date: Likely Completion date: Bottlenecks if any:No. Note: Bar Chart of Important works may also be attached

Name of Work: ROB Morak L C No. 87 Total Cost:18.08 Crores Location:Near Morak Dabadeh R. Mandi Date of Start: Stipulated Date of Completion: Expenditure till Date: lacs Likely Completion date:Dec Bottlenecks if any:LA completed in Nov.2009 Revised drawing under approval from Railway

POLICE CHOWKI JAGPURA Total Cost:11.00 Lacs Location: Jagpura Date of Start: Stipulated Date of Completion: Expenditure till Date:3.35 Lacs Likely Completion date:Dec Bottlenecks if any:Delay in drawing finalisation.

BOUNDRY WALL OF UMMEDGANJ,KOTA Total Cost: Lacs Location: Ummedganj (Kaithoon road) Date of Start: Stipulated Date of Completion: Expenditure till Date: Lacs Likely Completion date:Jan.,2010 Bottlenecks if any:Delay due to seepage.

TRANSIT HOSTLE RANGE HEAD QTR KOTA Total Cost:30.00 Lacs Location: KOTA Date of Start: Stipulated Date of Completion: Expenditure till Date:1.02Lacs Likely Completion date:Feb.2010 Bottlenecks if any:No

Proposed New Works S. No. Name of Work Client Deptt. Mode Estimated Cost 1 Construction of academic block UOK,KOTA Actual plus 540 Lacs 2 Construction of CFC at KAITHOON RUDA,JAIP U Actual plus 100 Lacs 3 Construction of Administrative Building SIAM,KOTA Actual plus 100 Lacs

Thank you