Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.

Slides:



Advertisements
Similar presentations
Substation L1/ MCC L1 Update March 21 st, Current Location.
Advertisements

05/07/12 – 5/13/12 Phase 1 Demolition at West Entry Complete; Drilled Piers and footers Started.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Hargrave Street Pumpstation – Site Preparation July 2014.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Air Handler Terminology
Texasheart.org Main Substation (MSS1) 13,800 volts Analogies: Chest Pain = Corona Minor Stroke = Tracking Cardiac Arrest = Arcing (may not be able to resuscitate.
Air Handler Terminology
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
PIP Update 3 September 26 th, L1 Future Plans  Installation is halted until further notice (plan for 2014 shutdown or when needed)  Substation.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
MNM Fatal Electrical Accident Electrical Accident August 6, 2008 (New Mexico) August 6, 2008 (New Mexico) Potash Operation Potash Operation Shift.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Muon Campus MC-1 Building GPP Update Russ Alber FESS Engineering November 28, 2012.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
Summer 2015 Update Tom Kulczewski Director of Buildings & Grounds September 17, 2015.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
1 Project Management Prof.Dr. Murat Aşkar. Project Management2 l What is a project? What is a project? l Project Phases Project Phases l Project Management.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.
FESS/Ops Shutdown Summary Week Ending 3Aug12. CUB Shut-Down Activities Shut Down Plant on July 21 hrs. Electrical – High Voltage Air Switch/Fuse.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
PS CHILLED WATER PROJECT SHUT-DOWN WHY? THE AGE OF THE PIPING - installed in years ago - technical life of piping normally years.
1 Taming the Data Center SDR 1.3 Butch Adkins Infrastructure & Operations.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
HVAC Replacement Case Study
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Energy How to use Safety Diagnosis Bilingual
CUB Outage Schedule April 21, 2006.
NuMI - Shutdown – Week 9 Horn 2 Repair – Successfully Tested the Repaired RAW Leak Drained and Refilled Horn 1 and 2 RAW Systems Changed Horn 2 DI Bottle.
CEDAR Detector Ventilation System Review
Pinole-Hercules Water Pollution Control Plant Upgrade Project
البيئة السياسية للإدارة الدولية
The following slides show just how this transformation took place.
Mount Vernon Community School
Three Bridges Estates HOA Meeting
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Matthew Gardner, 8/20/14

 Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air handlers and sections of pipes that conflict with new ductwork. ◦ Pipe insulation contains asbestos, abatement will take place August 29 th.  Relocate a VESDA conduit.  Bid package was delayed by procurement. Sent out on August 18 th. Bid due date is August 29 th.  Ductwork installation should begin in the 2 nd or 3 rd week of September. Expected to take ~4 weeks.  The Rooftop units have a lead time of 6-8 weeks. ◦ This may not arrive before the shutdown ends.

 Concrete pad waiting on chiller overhaul. ◦ Expected to happen next week. 1-2 days.  Electrical Work will begin next week. ◦ Expected to take ~2 weeks.  Pipe Fitting ◦ All of the prep work that could be done before cutting into existing system is complete.  Was waiting on chiller overhaul before continuing. ◦ Rising costs prompted switch from T&M to fixed price.  Package has been sent out for review and will go out to bid this week or next. ◦ Remaining work is expected to take 3 weeks.

 Transformer was moved to Linac Lower Gallery on July 19 th.  Transfer temporary power to L2 on September 6 th.  2 weeks to remove old substation and install new one. ◦ EE Support, Electricians, and Riggers  Switch power to new substation on September 20 th.