ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Harris JTRS Project The A-Team Garrett Wampole Ben Litchfield Jason Offord Jason Gillman David Bryant.
1 As Class Convenes u Find your team u Pick up your team’s folder; Becoming an Expert u Remove any old work and Class Process Check for Becoming an Expert.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Effective Methods for Software and Systems Integration
Server Virtualization: Navy Network Operations Centers
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
From Research Prototype to Production
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
ASPERA-3 July 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_25/ Page 1 Monthly Status Report Report due 7/25/00 Schedule statused.
GLAST Large Area Telescope:
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 1 Monthly Status Report Report due 7/25/01 Schedule statused.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
EADS Defence and Security Systems Ltd Commercial in Confidence EADS FiReControl E Mids Regional Project Team – 8 th Feb 2010 Steve Hughes EADS Project.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 1 Monthly Status Report Report due 1/25/01 Schedule statused.
ASPERA-3 June 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 6_25/ Page 1 Monthly Status Report Report due 6/25/00 Schedule statused.
INFO 424 Team Project Practicum Week 2 - Launch report, Project tracking, Review report Glenn Booker Notes largely from Prof. Hislop.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
ASPERA-3 June 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 6_25/ Page 1 Monthly Status Report Report due 6/25/01 Schedule statused.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
ASPERA-3 May 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 5_25/ Page 1 Monthly Status Report Report due 5/25/01 Schedule statused as.
SchedulingProducingControllingSchedulingProducingControlling.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
U.S. Department of Agriculture eGovernment Program February 10, 2004 USDA Presidential Initiatives Working Group Meeting.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Monthly Status Review Wednesday, January 18, 2012 LPW/EUV Jim Westfall PM & Will Thompson SE Laboratory for Atmospheric and Space Physics University of.
The U.S.S.E Team #4 Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera Status Report #1 January 26 th, 2009 Description: A follower robot that will.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
#WEEK 3: RELIABILITY-TEST DOCUMENTATION AND OTHER ITEMS NEEDED FOR RELIABILITY TESTING 2 August 2006.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
Atlas Polar CDR meeting March 2 & 3, 2016 DAY 2. Review Latest CAD Sample screenshots from Feb 12 CAD.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
Gayle K. Martin November 14, 2016
SPF MAG Quarterly Report – Feb 2015
Software Configuration Management
MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
Renovation of the 45-year old PS magnets
Software and System Delivery
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
MIPA status report (Miniature Ion Precipitation Analyzer)
Lockheed Martin Canada’s SMB Mentoring Program
Integration and Test Organization Chart
Advanced Energy Vehicle
The U.S.S.E Status Report #3 February 16th, 2009
Feedback on the Draft Cycle 4 ESSP
Presentation transcript:

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused as of Feb. 16, 2001

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 2 Project Status Summary Technical Dec Jan Feb Detailed Description: (for items identified as yellow or red) Programmatic Dec Jan Feb Schedule Dec Jan Feb Resources Dec Jan Feb We received the ELS parts back from MSSL / Walton Plating and completed assembly of the flight unit. The unit was then vibrated and cycled in thermal vac. The unit just completed characterization testing and has only one remaining task, measurement of mass properties. We are nearing completion of the Acceptance Data Package and will be ready for the Pre-Ship Review scheduled for March 1. DD250s have been submitted to the NMO for both the IMA delivery and the upcoming ELS delivery. Latest project photos and videos are available on Aspera-3 web site.photosvideos

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 3 Problem and Concern Summary P=Problem C=Concern R=Resolved

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 4 Accomplishments of the Last Month -ELS We received the flight blackened parts from MSSL / Walton Plating. The parts looked very good. We inspected them and decided to use all of the parts from the latest batch. The parts were then vacuum baked out prior to assembly. The flight unit was assembled for flight and then vibrated to protoflight levels. Following vibration, a limited functional test was performed and the unit was then thermal vacuum cycled. Hot and cold starts were performed. The unit was left powered on after the cold start throughout the temperature transitions and plateaus. High voltage was set to the maximum level. Everything looked good. The unit was then removed from the thermal chamber and installed into the characterization chamber where the high voltage test was re-run followed by the full characterization test. We have completed the testing and are currently analyzing the data. The flight spare was reassembled and installed into the characterization chamber. High voltage testing was run prior to needing the GSE for the flight unit TVAC test. This week, the flight spare was reinstalled back into the characterization chamber (it was removed to perform characterization of the flight unit) for its final testing. This will be complete by Feb. 27.

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 5 Accomplishments of the Last Month - IMA The DD250 for delivery of the IMA hardware was resubmitted to NMO based on several discussions. We are awaiting return copies.

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 6 Accomplishments of the Last Month - Data Reduction Software Worked on APAF Software Requirements Specification (SRS) –Draft to be released by the end of February, 2001 –APAF Software Requirements Review to be Held at Next ASPERA-3 Team Meeting in Kiruna, Sweden (March 6-7, 2001) Continued Packet Definitions for ELS –Done all we can for now. We're waiting on the flight software personnel at FMI (Finnish Meteorological Institute) for feedback. Continued Providing Technical Assistance for EPO Web Information Continued Defining and Implementing IDFS Web Tools Held monthly ASPERA-3 Software Status Meeting (February 23, 2001)

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 7 Planned Activities for the Next Month - ELS Measure mass properties of the flight unit. Finalize characterization testing of the flight spare. Hold ELS Pre-ship Review Deliver ELS flight unit to IRF. Attend ASPERA-3 team meeting.

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 8 Planned Activities for the Next Month - IMA None.

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 9 Planned Activities for the Next Month - Data Reduction Software Tasks Attend ASPERA-3 Team Meeting March 6-7 in Kiruna, Sweden Conduct APAF Software Requirements Review (at ASPERA-3 Team Meeting) Continue Working on APAF Software Requirements Specification (SRS) Continue Packet Definitions for ELS as Needed Begin Packet Definitions for NPI Continue Providing Technical Assistance for EPO Web Information Continue Defining and Implementing IDFS Web Tools

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 10 Problem and Concern Status None at this time.

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 11 Schedule Summary ELS: Everything is on track for on-time delivery of the flight unit to IRF. The remaining activities are to measure the mass prosperities of the unit, hold the Pre-Ship Review and hand deliver the unit to IRF. Software: Some software activities have been delayed due to hardware activities. The overall delivery of the software to support mission operations however continues to be on schedule. The full-up schedule is available on the ASPERA-3 Web site.schedule

ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 12 ASPERA-3 PHASE B/C/D MASTER SCHEDULE