Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.

Slides:



Advertisements
Similar presentations
Refrigeration Systems
Advertisements

LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
Unit 206: Domestic hot water systems
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Detector Cooling Project Thermosiphon Project Status Report
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
V. Bobillier1 Cable installation status.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
LHCb Install Meeting - 12 / 05 / 2004 Paolo Guglielmini - TS / CV LHCb Cooling of the sub – detectors INNER TRACKER TRACKER TRIGGER RICH 1 RICH 2 Status.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
S A Griffiths CM42 June 2015 Electrical & Control.
Demineralised water cooling system
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
CBETA Technical Review
IT-4189 Supply and installation of a cryogenic distribution system
The LHCb Installation Story
Heating, Ventilating, and Air Conditioning
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
LHCb & EYETS
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Insertable B Layer Cooling System
EN-CV: P8 systems and Detector Cooling
Heating, Ventilating, and Air-Conditioning
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations

Detector Cooling activities for the LHCb experiment Project Leader: Paolo Guglielmini Inner Tracker cooling unit IT-3314 Tracker Trigger cooling unit RICH 1 & 2 cooling unit Outer Tracker cooling unit Primary cooling system modifications Backup chiller for IT, TT and VELO stations SPD/PS detectors air cooling Others Muon on-detector air cooling Gas compressors cooling Cooling systems from mixed water network IT-3307 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

IT-3314:Inner Tracker Tracker Trigger DESCRIPTIONBoth cooling systems at fluorocarbon C 6 F 14 in liquid state are based on a water condensed chiller connected to CERN mixed water network. They shall remove respectively some 2 kW and 1.65 kW heat power at -15°C from IT and TT detectors. BUDGET CODET SCHEDULEContract signatureApril 2005 Installation at Contractor’s premisesJuly 2005 Installation of pipelines and manifolds in the UX85October 2005 Installation of the unit in the UX85End 2005 Performance tests in the UX85February 2006 CommissioningMarch 2006 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

DESCRIPTIONThe cooling system running fluorocarbon C 6 F 14 in liquid state is based on a heat exchanger connected to CERN chilled water network and shall remove some 4 kW heat power at 10°C from both detectors. BUDGET CODE T (70%) and (30%) SCHEDULEContract signature April 2005 Installation at Contractor’s premisesJuly 2005 Installation of pipelines and manifolds in the UX85October 2005 Installation of the unit in the UX85End 2005 Performance tests in the UX85February 2006 CommissioningMarch 2006 IT-3314:RICH 1 & 2 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

1 2 1.Location of the cooling stations Metallic platform on the protected area of the RB84 side. 2.Transfer lines path along the cavern Grouped supply/return pipelines around the shielding wall, across the vault, down to detector zone. IT-3314 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

IT TT distribution manifolds Inner cooling circuits fed by ten independent lines with different flows. 4.IT distribution manifolds Inner cooling circuits fed by twelve independent lines with equal flow. No distribution manifolds provided for RICHes lines. Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

IT3307:Outer Tracker DESCRIPTIONThe cooling system running demineralised water is based on a heat exchanger connected to CERN mixed water network and shall remove some 23 kW heat power at 19°C from the detector. BUDGET CODET SCHEDULEContract signature April 2005 Installation of pipelines and manifolds in the UX85June – July 2005 Installation at Contractor’s premisesSeptember 2005 Installation of the unit in the UX85End 2005 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

IT3307:Primary cooling system modifications DESCRIPTIONThe already existing pipelines for chilled and mixed water (on RB86 side), compressed air (on both sides) and demineralised water (on RB84 side) shall be prolonged. The counting houses cooling lines shall be installed and equipped. Metallic supports for the transfer lines of detector cooling units shall be constructed on the RB84 side of the UX85. BUDGET CODE32560 SCHEDULEContract signature April 2005 Installation of the pipelines for primary networks in the UX85, including installation and electrical tests on related equipmentsJune – July 2005 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

IT-3307 RB84 RB RB84 1.Compressed air (in white) Demineralised water (in light blue) 2.Chilled water (in light blue) Mixed water (in green) RB84 2 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

IT Connections to: 1.barracks D1 and D2 2. barracks D3/A and D3/B 3. detector cooling systems Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

Others (1/5):Backup chiller for IT, TT and VELO cooling stations DESCRIPTIONAn air chilled fridge unit (32 kW cooling capacity) shall be provided as a backup for the IT, TT and VELO cooling systems, in order to supply mixed water at 13°C in case of breakdown or maintenance of the standard network. The chiller will be located on top of the barracks and equipped with automatic valves. BUDGET CODE32560 SCHEDULE Installation and commissioning of unit and related pipeworks July 2005 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

Others (2/5):SPD/PS detectors air cooling DESCRIPTIONThe electronic acquisition cards for the SPD and PS, dissipating a total heat power of about 4.4 kW shall be cooled down with a dried and filtered air flow at 6 bar pressure. All components of the cooling system shall be positioned into a zone of the protected area still to be defined according to technical and integration matters. SCHEDULE Cooling system tested and commissioned February 2006 PS SPD Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

Others (3/5):Muon on-detector air cooling DESCRIPTIONThe on-detector electronic, fitted with the Muon chambers in stations M1-M5 shall be cooled by means of a forced air circulation. The air will be taken form the bulk by a fan, and exhausted to the bulk, the cooling capacity being assured by the cavern ventilation system. The heat dissipated by on-detector electronic is 3.5 kW for station M1, 3 kW for stations M2 and M3 and 2 kW for stations M4 and M5. SCHEDULE Cooling system tested and commissioned February 2006 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

Others (4/5):Gas compressor cooling DESCRIPTIONTwo gas compressors located in building 2870/R-004 release during normal functioning a heat power of about 8 kW each. An independent cooling unit shall be connected to both compressors in order to dissipate such heat power. SCHEDULE Cooling system tested and commissioned February 2006 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

Balcony racks LVPS on bunker Gas racks IT/TT service boxes Muon racks Calorimeter racks VELO vacuum pump Total heat dissipated [kW] (RB86) 4 (RB84) 4 (IT) 4.5 (TT) Others (5/5):Cooling systems from mixed water network DESCRIPTIONDifferent heat sources in the UX85 shall be cooled down with systems running mixed water coming from CERN network. SCHEDULE Cooling systems (pipeworks and supply/return equipped manifolds) installed, tested and commissioned February 2006 Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

Others (5/5):Cooling systems from mixed water network Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005

IT3307 – Installation matters JUNE – JULY cooling pipes integration in the detector area (RB84 side): to be finished and approved for the 6 th of May 2. work sequence: primary system RB86 side barracks lines supports RB84 side OT transfer lines 3. storage area for Contractor’s material to be reserved (SG8 2870?) 4. cable trays around the new pipelines for chilled water, mixed water and compressed air to be dismounted (RB86) 5. metallic platform on left side of the vault area to be dismounted, all RB84 side to be prepared for installation 6. new metallic structure behind counting houses: to be finished in three weeks 7. positioning of the OT unit on the platform (autumn): dimensional constraints, to be studied how to lift it up