Construction Management Association of America CSU’s C OLLABORATIVE D ESIGN- B UILD P ROCESS September 30, 2015.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

DESIGN BUILD NATIONAL PERSPECTIVE by Dwight Horne FHWA.
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Organization of Primary Entities
Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Lessons Learned: CM at Risk & Design Build
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Facilities Excellence Project Delivery Methods Board of Trustees April 12, 2005.
Subcontracting Construction Engineering 380. Subcontracts Owner doesn’t “recognize” subcontractors They are representatives of the contractor Prime usually.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Education Campus What a Difference a Year Makes! Takoma.
A Match made in Heaven? Connecting you with a builder.
Your Deliver Method... …Pick it Early
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Chapter 3 Project Initiation
CTC-470 Construction Administration Project Management Concepts.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Delivery of Multiple Small Projects—Now! Task Order Construction Agreements.
ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Planning & Delivery Systems Construction Engineering 380 Engineering Law.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Honoraria for Design Build Projects Methodology Assessment Matrix.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
CMR Contract Documents Jon Walden Manager of Contracts & Compliance Ohio School Facilities Commission Lisa Conomy Construction Counsel The Ohio State University.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
Construction Contracts and Project Delivery Methods
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
You passed the Bond or secured some funds What do we do now? 2014.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
UTILIZING CONSTRUCTION MANAGER AT RISK IN GREENSBORO, NORTH CAROLINA.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Project Budget Review _ Control Developed by: Daniel J. Renna 3/16/20161.
CAPITAL PROJECT DELIVERY METHODS APRIL 20, 2015 – SACUBO Annual Conference By Al Stoverink, AVC for Facilities Arkansas State University.
Construction Management At Risk Process
Rapid Deployment Project Management Business Perspective
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Copyright © The Conestoga Group PY 674 – Session 2 Review of week 1 material... Chapter 1: PM Overview – Main Text Book / H. Kerzner Ph. D. Focus.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
CM at Risk v. Design-Bid-Build
Types of contract selection based upon following:
Project Delivery Systems
Design-Build Process Utilizing Negotiated Selection
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
MULTISPORTS CENTRE PRESENTATION
C2 Follow the Capital Risks
Presentation transcript:

Construction Management Association of America CSU’s C OLLABORATIVE D ESIGN- B UILD P ROCESS September 30, 2015

Session Agenda Overview of CSU System Assumptions – Prerequisites Understanding of CMAR Understanding of DB Collaborative Design Build(CDB) Lessons Learned / Best Practices Question & Answers

The Capital Program Budget is $404,000,000 (Includes $230,000,000 in Infrastructure Projects)

The CSU Five Year Capital Outlay Book can be found at: cuments/ Five-Yr- CapImprovementPgmBk.pdf cuments/ Five-Yr- CapImprovementPgmBk.pdf

Basics of Construction Manager at Risk (CSU has been using the CMAR project delivery method for over 10 years) The Construction Manager at Risk process: Owner establishes program and soft criteria Select Architect based on qualifications (fees are set) Select CM based on qualifications and fees Separate design services contracts with CM and A/E for design (SD, DD, CD) and bidding. GMP from CM. Construction contract / Contractor 2% Contingency Direct cost is based on subcontractor bids

CM A R Positives Collaboration A/E, GC, Trades, Owner Brainstorming design solutions and construction problems Open ended / no one locked in during design Selection is mostly on qualifications Contractor and trades involved in design phase for their knowledge, plan checking, estimating, planning, scheduling

Negatives with CM A R GMP after design is complete Bids sometimes over budget – VE not good solution Potential insufficient use of DA and DB subs (they take more work to get in place) will result in lack of trade input during design Constructability comments not addressed Rush to bid before ready Difficult to fast-track before GMP is funded Architect and CM may not form a team Need strong Owner project manager for A/E & GC

CM A R: The Money Site Management Fee and OH&P are lump sum per proposal CM Contingency - 2% of direct construction costs Allowances - should not be more than 5% Fee proposals – 25% Trade bids and approved COs - subject to audit

Design Build Owner establishes hard Project Criteria and program RFQ / RFP Award a Design-Build Contract Complete design and construct

Design Build Team Selection RFQ – Qualifications Architect / Contractor teams RFP- Design Competition Quality and Cost Award Contract Stipends

D-B: The Money RFP Phase Cost Proposal = Cost/Unit Quality Quality Point Value No added contingency for DB Owner Contingency (Avg. 2%)/ Scope changes

D-B Positives Self selected Team Strong delivery team Transfer of Design Risk to DB More complete assumption of Constructability risks by DB Smaller Owner Contingencies Early GMP Ability to permit early phases D-B more in control of the successful completion

In Contrast

D-B Negatives Program and Rigid Criteria Design is a choice of 3 but not collaborative Competition – Expensive and time consuming –questionable value Stipend - not enough - limits participation

Collaborative Design-Build CMAR process modified Owner establishes project criteria (same as CMAR) A/E and CM team are selected on qualifications and fees to design and manage construction (team is new) Design contract for SD, DD and GMP (GMP is early) Design-Build process modified (Bifurcated Contract) DB contract for CD and construction Direct cost is based on subcontractor competitive bids (same as CMAR, different than DB)

CDB: Best of Both CMAR and DB CMAR Positives Early Collaboration AE, GC, Owner Brainstorming design solutions Open ended / no one locked in DB Positives Early GMP GC and AE are a team Ability to Fast track

Collaborative Design–Build Service & Product Same Selected with DB team Design contract, SD, DD GMP based on estimate DB contract CD and bidding Construction CMAR Service Program Architect CM Design Contract incl CD Bidding and GMP in Design Construction Contract Quick View - CMAR - CDB

Project Criteria- CDB Owner defines the project Program Design criteria - soft - Program AE will specify for bidding Project criteria Campus standards, system compatibility Budget Schedule Challenges - Risks

Schematic Design - CDB Service contract for SD and DD Program verification SD plans and specifications – 3 way collaboration DA and DB subs allowed – best value selection GMP Approval to award DB contract based on schematic design and GMP (Must go to BOT) Continue with DD while contract is approved and executed.

Design Assist and Design Build Subcontracts Design Assist and Design Build Trade Contractor Process Use of DA & DB trade contractors is project specific Maximize the use of DA & DB trade contractors Good use for MEP trades, curtain walls, foundation, fire protection, fire alarms, security, IT, BMS, and specialties Selection process similar to DB - Prequalification, Shortlist, RFP with performance criteria, proposal includes design approach (SD) and direct cost target, best value selection

Collaborative Design-Build Phase II Finish the design, CD, and permitting Prequalify subcontractors Bid trade packages Construction Closeout

Contrast FactorCMARCDB Criteria DocsLimitedNot as Important User inputDuring designDuring criteria/design Bifurcated Contract for Service & Product Design optionsUnlimited Price RiskYeslimited FlexibilityMore flexibleLess flexible LeadershipCSUCSU / DB

Contrast FactorCMARCDB A/E ContractCSUContractor Scope creepYesNo EnhancementsYes Const Admin (little less) Desired design **BetterVery Good Design detailsOAC teamOAC Team SuccessesYes

The Money -CDB Fees for design and construction management per proposal. Lump sum Reward for cost savings: fees not reduced Direct construction cost max is GMP Actual cost is subcontract bids Unused portion of GMP returns to the owner Contingency 5% of direct construction budget (part of 2 nd contract) Contractor retains 30% of unused contingency

Collaborative D-B Positives One Stop shopping Early design and budget control GMP comes in early Release packages ahead of design completion Shorter Construction duration Negatives (from CSU perspective) Less Design input after Schematics Fewer Checks and Balances Project Control for A/E team is more limited Some lack of quality control during construction

Construction The brace section in a service hallway did NOT show up in the clash detection software. Which makes sense, the brace is in an open hallway, it isn't clashing with any other piece of the building. It's just the intermittent presence of soft squishy humans that will run into it. I guess every time we have a slam dunk solution to a construction problem, construction is plenty complex enough to leave us more work to do.” Bob Schulz re: SDSU Student Union 1/4/13 Use of Contingency

CDB Results Highly qualified architects and contractors compete Selection is based mostly on quality -75%/fee-25% Early trade involvement allows better design and price stability Everyone participates in design and construction Complete transparency

Lessons Learned CDB is not a Panacea to solve all our problems An overly aggressive schedule may still cause problems- Manpower problems (CM and A/E), communication issues, etc. Plan Check Coordination can be challenging Coordination issues from package-to-package could lead to additional costs Phased Buy-out vs. use of Contingency LEED Requirements need to be understood by all parties

Lessons Learned CDB is very useful for certain purposes A strong Project Executive is essential Collaboration with all Stakeholders Schedule Acceleration thru multiple packages DA / DB Subcontracting MEP, FA/ FP, Equipment, Curtain Wall, Framing, etc. Co-location (The Big Room Concept) Allowances in certain circumstances Scope changes are more easily accommodated

Best Practices (so far…) Co-location Everyone in one trailer: CM / AE / CSU / Insp / PM Cultural shift Opens the door to better communication Schedule Milestone Incentives Allowance vs. Change Order 50% to workers / 50% go to company Get it down to the workers as fast as possible Owner participates in buyout package process

Updates to the CDB-RFP Pre-Proposal Meetings (prior to interviews) Proposer Driven 1 st Mtg: Scope of Work & Program questions 2 nd Mtg: CDB process Better understanding of project requirements Less time & resources wasted on misdirection Results in better proposals being received

Updates to the CDB-RFP New Table “B” for Categories of Design costs Similar to Table A Items to include in proposal Items for allowances, direct costs, & paid for by owner New Allowances Group II Equipment & Furniture managed by the CDB team (project by project basis) LEED Requirements General Requirements / Division 1 Costs May be self-performed or subcontracted 10% of savings goes to DB

Which to Choose? Collaborative Design Build is an evolution of CMAR and DB into a delivery method that has advantages over both methods. However, all three methods have their pros and cons. When selecting a delivery method let the success criteria of the project guide your selection.

Questions-Discussion ?