Norwegian Meteorological Institute met.no ECOOP Task T2.5: River Data Progress in Year 1 Bruce Hackett, met.no Presented at ECOOP 1st Annual Meeting, Athens,

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Workplan Adherence.
Advertisements

WORLD METEOROLOGICAL ORGANIZATION Weather - Climate - Water
Hans Dahlin, EuroGOOS, st Marine Board Forum, Oostende Marine Data Challenges: From Observations to Information Operational Oceanography by.
ECOOP Data Management System (T2.2/WP2) Declan Dunne 13 th February 2008, Athens.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO WP2 Strengthening regional and trans-regional activities Henning Wehde.
National facility concerned with looking after and distributing marine data Part of NOC National Marine Facilities Serve science, education and industry,
Marine Core Service MY OCEAN WP18.3 – Assessment and Users Requirements for “Marine Safety” Task : Assessment and requirements for “Marine Safety”
ICEMON Presentation at IICWG-IV by Helge Tangen. Norwegian Meteorological Institute met.no Contents of presentation The ICEMON Consortium Objectives and.
The new ECOOP suggestion from Norway (Met.no, NERSC, IMR) Why new? Because: Too little focus on clear objectives and specific products Products and services.
Evaluations and recommendations for a user support toolkit Christine Cahoon George Munroe.
Physical Oceanography Unit IOI-Malta Operational Centre University of Malta
ECOOP Consensus Meeting, Erdemli, March 2005 ECOOP WP13: Demonstration & Evaluation of ECOOP Monitoring Forecasting and Information System  Goals:  Demonstration.
1 Consultation & Testing Martin Tuchyna Cross-TWG and DT DS meeting May 2011 Somma Lombardo.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
Athens Feb 2008 EuroMISS and EuroDess Viewing and Validation Services Keith Haines.
Flow monitoring (Netflow) Status report 12/10/2006 Alessadro Inzerilli - GARR.
MERSEA Remote – Sensing Ocean Portal Brest Nov 2005 WP2.6 - DIP2 Project Status < Observing Systems < Remote Sensing.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
PAN-European Exploitation of the Results of the Libraries Programme - EXPLOIT German Libraries Institute Berlin EXPLOIT 1 Music.
GMES Marine Service MY OCEAN WP 17 Service Level Management & User Feedback – GMES MyOcean First User Workshop Bertil Håkansson, SMHI.
Towards Sustainability Partnership for a European Centre for Ocean Monitoring and Forecasting (ECOMF) 16 April 2013, MyOcean Annual Review, Cork, Ireland.
SIMORC Workshop, 28th March 2007, London By Patrick Gorringe EuroGOOS/SEPRISE Operation of regional ocean monitoring systems in Europe.
MARIFISH (Era-Net) Programme – Sequencing of Activity Work Packages Jul-10 Implement communications strategy Jan-07Jul-09Jan-10Jul-07Jan-08Jul-08Jan-09.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
MESH UK Workshop 19 October 2006 Introduction Dr Paul Gilliland Marine Policy Adviser and MESH Partner Lead Natural England.
Page 1© Crown copyright 2004 Quality Management of a European Wind Profiler Network (CWINDE) Tim Oakley TECO-05 Bucharest, 4 th -7 th May.
What is BODC? National facility concerned with looking after and distributing marine data Serve science, education and industry, as well as the wider public.
ECOOP annual meeting February 2008 Athens Ole K. Leth Danish Meteorological Institute (DMI) Contribution to WP 4 (13 February 2008) – Modelling and.
ECOOP Annual meeting | | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine.
WP5: DATA MANAGEMENT AND DISTRIBUTION Overview and Status: months Caterina Fanara 1, Loic Petit De La.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
Regional Node Northern Africa - Middle East - Europe (SDSWAS NA-ME-E) Summary of Activities since last RSG meeting, November 2008, Tunis Michael Schulz.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
1ECOOP Plenary Meeting Athens 2008 EUROMISS EUROpean Marine Information System of Systems S Pouliquen, Thomas Loubrieu ECOOP plenary meeting.
WP5 Task T5.4 WP5-T5.4 : Regional Iberia-Biscay-Irlande (IBI) integrated system ECOOP Annual Meeting.
ECOOP Annual meeting, Feb 13-14, 2008 ECOOP WP 1 overview Jacob L. Høyer Centre for Ocean and Ice Danish Meteorological Institute WP Partners: Alicia Lavin.
Henning Wehde I IMR I 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW Wp 2 Strengthening regional and trans-regional.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
Marine Core Service Marine Core Service presentation 15 May 2008 The GMES Marine Core Service n Outline –What is GMES Marine Core Service, its design and.
WA-06-05:  Title: Initiate the creation of a coordination mechanism within GEO for global in-situ water observations, including ocean observations, and.
1-2-3 February 2006 –Page 1 Mersea Integrated System How to improve Access/Downloading services ? How far do we go in terms of standardization ?
European COstal-shelf sea Operational observing and Forecasting system ECOOP 1. Annual Meeting Athens February 2008 Erik Buch Coordinator.
Henning Wehde I IMR I 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ WP 2 Strengthening regional.
Information Society Technologies in the 6th Framework Programme Information Society Technologies in the 6th Framework Programme IST Call 6 January 2006.
ECOOP annual meeting Feb 13-14, Objectives & Description. Objectives: Collect meta data and historical data for temperature and salinity measurements.
Network evaluation and data delivery – WP2.1 Giuseppe M.R. Manzella - ENEA Marco Gambetta – INGV Aldo Drago – UoM Declan Dunne - UCC Annual Meeting – Athens.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Kick off meeting, 2008, Cavtat Guidance on the use of models for the European air quality directive An activity of WG1 FAIRMODE Bruce Denby 1*, Steinar.
Technologies & methodologiesfor operational systems ENEA, CNR, DMI, Ifremer Annual Meeting – Athens 2008.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
ICT learning centres in all libraries Connecting 4,300 public libraries to the information superhighway by 2002 Over 30,000 public access terminals NOF.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Operations Portal Development Update on Requirements Cyril L'Orphelin IN2P3/CNRS.
IOOS National Glider DAC: Demonstration and Update April, 7th 2016 | Becky Baltes and Luke Campbell.
Outcomes from EMODnet/MSFD coordination meetings A. Giorgetti, M. Lipizer, M. Vinci EMODnet Chemistry, 3 rd year meeting, June 8-9, 2016 Helsinki, Finland.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1 SI O S Svalbard Integrated Arctic.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
INTAROS – Integrated Arctic Observation System
Work-Package 5: MAMA-NET Hellenic Centre for Marine Research – HCMR (former NCMR and IMBC) Objective to establish the basis of a prototype system for exchange.
Monitor & review Implementation of EGOS- IP in RAII
Flanders Marine Institute (VLIZ)
Distributed Marine Data System:
CREWS West Africa Regional Work Plan
Intermountain West Data Warehouse
Marine Strategy Framework Directive Competence Centre
Design central EMODnet portal Objectives and Technical description Initial draft prepared by the Flanders Marine Institute.
Update on progress since last WG meeting (13-14 June 2002)
MENTOR Blue Career Centre of Eastern Mediterranean and Black Sea
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Presentation transcript:

Norwegian Meteorological Institute met.no ECOOP Task T2.5: River Data Progress in Year 1 Bruce Hackett, met.no Presented at ECOOP 1st Annual Meeting, Athens, Greece, February 2008

Meteorologisk Institutt met.no ECOOP T2.5 Title: Establish a pan-EU data base for river run-off Overall Objective: Establish a framework for integrating and harmonising observations of river runoff to the European coastal seas and providing them to coastal and shelf seas monitoring and forecasting services. Specific Objectives: –To gain an overview of available data and to select an initial set of data for use in ECOOP. –Define and test procedures for acquiring river runoff data from providers and making them available through the ECOOP data management systems. –Provide river runoff data in each region to users through the ECOOP Data Management System

Meteorologisk Institutt met.no ECOOP T2.5 Summary of aims and work What: 1.Get an overview of what's available, what's possible to access in the (near) future and how. 2.Set up procedures for data provision via the EDMS. 3.Implement an initial feed of NRT river data to demonstrate value during TOP. How: –Work through the ROOS’es to access data providers. –Cooperate with the EDMS developers on provision to users – ROOS’es as main channel. –Get feedback on usefulness and upgrade.

Meteorologisk Institutt met.no ECOOP T2.5 Partners PartnerRoleContact SMHIBOOSLennart Funkquist RIKZ*NOOSKees Borst AZTI-TecnaliaIBI-ROOSYolanda Sagarminaga MHIBlack Sea GOOSEvgeny Lemeshko BSHWP2 liaisonSusanne Tamm met.noLeadBruce Hackett

Meteorologisk Institutt met.no ECOOP T2.5 Subtasks and their Deliverables S Assessment of existing river run-off data –D : ECOOP River Data Catalogues (five regional) as digital spreadsheets (Mo 12) S Interfacing to ECOOP Data Management System –D : ECOOP River Station Lists (five regional) as digital spreadsheets (Mo 12) –D : Report on interfacing river runoff data to the ECOOP Data Management System (Mo 18) S Implementation of initial data sets in ECOOP Data Management System –D : Report on description and assessment of the ECOOP river runoff data provision. (Mo 36)

Meteorologisk Institutt met.no ECOOP T2.5 Status Year 1 River Data Catalogs (5 regional) as spreadsheet files –XLS templates delivered by met.no with initial info from GRDC –Progress in all 5 regions, but only IBI and BOOS are up to V1 readiness. –V0.6 of D delivered – will be updated. River Station Lists (5 regional) as spreadsheet files –Delayed due to dependency on River Data Catalogs (of which the Lists are a subset). –Draft version (V0.3) of D files have been delivered – will be updated. Interfacing to EDMS –candidate data format found at GRDC Interactive Task web page with information, plans and results.

Meteorologisk Institutt met.no ECOOP River Data Catalogs in GE = unchanged (GRDC archive info) or uncertain = updated only archive data info = updated only NRT data info = updated NRT and archive data info Why? Visualize the observing network and coverage. Help to identify relevant stations. Make the information more easily accessible to others. How? met.no builds kml directly from xls Published on T2.5 wiki

Meteorologisk Institutt met.no IBI-ROOS River Data Catalog v 1.01

Meteorologisk Institutt met.no BOOS River Data Catalog V1.01

Meteorologisk Institutt met.no NOOS River Data Catalog V0.52

Meteorologisk Institutt met.no MED-GOOS River Data Catalog V0.31

Meteorologisk Institutt met.no Black Sea GOOS River Data Catalog V0.51

Meteorologisk Institutt met.no Next steps Complete V1 of all River Data Catalogs (NOOS, MED, Black Sea) D Deliver draft (V0.5) of River Station Lists D Verification round in the ROOS memberships Decide on exchange format for river data in consultation with EDMS Select initial NRT data sets for implementation; resolve data access issues Define and implement procedures for providing data via the EDMS.

Meteorologisk Institutt met.no End

Meteorologisk Institutt met.no ECOOP T2.5 Partners and resources (mm)