Enterprise Design Process: Business Processes Johan Strümpfer.

Slides:



Advertisements
Similar presentations
Organizational Design, Diagnosis, and Development
Advertisements

© Colin Potts B1-1 Organizational approaches to requirements Colin Potts Georgia Tech.
Environmental Accounting. Discussion Environmental Accounting Overview –What is environmental accounting –Why do environmental accounting –What is an.
Business Process Reengineering & Innovation Chou-Hong Chen, Ph.D Professor of MIS School of Business Administration Gonzaga University Spokane, WA
Soft Systems Methodology
Introduction to Soft Systems Methodology
Soft Systems Methodology
Introduction to Soft Systems Methodology. The Vision SSM Models Use Cases Activity Models Dynamic Models Object Models Programs Databases Business Computing.
V i s i o n ACCOMPLISHED ™ Portfolio Management Breakthroughs Shelley Gaddie President Project Corps Pacific Northwest Portfolio Management Roundtable.
Business Process Reengineering & Innovation Jason Chen School of Business Administration Gonzaga University Spokane, WA 99223
2-1 The Organizational Context: Strategy, Structure, and Culture Chapter 2 © 2007 Pearson Education.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-1 The Organizational Context: Strategy, Structure, and Culture Chapter 2.
CISB444 - Strategic Information Systems Planning
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
E. Wainright Martin Carol V. Brown Daniel W. DeHayes Jeffrey A. Hoffer William C. Perkins MANAGINGINFORMATIONTECHNOLOGY FIFTH EDITION CHAPTER 9 (part a)
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
Copyright © 2004 by South-Western, a division of Thomson Learning, Inc. All rights reserved. Developed by Cool Pictures and MultiMedia Presentations Copyright.
LEVERAGING THE ENTERPRISE INFORMATION ENVIRONMENT Louise Edmonds Senior Manager Information Management ACT Health.
Fundamentals of Organization Structure
What is Business Analysis Planning & Monitoring?
Certificate IV in Project Management Project Management Environment Course Number Qualification Code BSB41507.
Year 12 Business Studies Operations REVIEW.
Monitoring Evaluation Impact Assessment Objectives Be able to n explain basic monitoring and evaluation theory in relation to accountability n Identify.
Organizations. What are Organizations? Organizations are “social entities that are goal-directed, are designed as deliberately structured and coordinated.
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
Transboundary Conservation Governance: Key Principles & Concepts Governance of Transboundary Conservation Areas WPC, Sydney, 17 November 2014 Matthew McKinney.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 3 Project Management for Strategic Goal Achievement.
Shifting resources: disinvestment and re-investment Craig Mitton, PhD Centre for Clinical Epidemiology and Evaluation, Vancouver Coastal Health Research.
The Denison Model.
Monitoring & Evaluation Presentation for Technical Assistance Unit, National Treasury 19 August 2004 Fia van Rensburg.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 4 Project Scope Management.
Enterprise Design Process: Function View Johan Strümpfer.
Version 10.0  The High Performance Organisation Ltd Creating A Process Based Management System 1 Welcome Creating a Process Based Management.
7-1 McGraw-Hill/Irwin Operations Strategy Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Business Process- Focused Strategies and.
© J P Strümpfer IKEA Purpose of Learning Interventions Johan Strümpfer.
Fundamentals of Organization Structure
Chapter 16 Managing costs and quality
Strategy Evaluation A vital tool for the savvy strategy maker Australasian Evaluation Society Conference September 2011.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 Click to edit Master title style What is Business Analysis Body of Knowledge?
How Information Technology can be connected to Organizational Transformation / How Information Technology can be connected to Organizational Transformation.
Fundamentals of Organization Structure
M253 Team Work in Distributed Environments Week (3) By Dr. Dina Tbaishat.
CHAPTER 11 ORGANIZATIONAL DESIGN AND WORK PROCESSES BOH4M1.
P3 Business Analysis. 2 Section D: Business Process Change D1. The role of process and process change initiatives D2. Improving the process of the organisation.
West, Ford & Ibrahim: Strategic Marketing
Topic 1: Strategic Marketing
Chapter 12 Introduction to Cost Management Systems
ISA 201 Intermediate Information Systems Acquisition
Human Resource Management
ICT PSP 2011, 5th call, Pilot Type B, Objective: 2.4 eLearning
three Chapter Eleven Organizing and Structuring Global Operations.
The Organizational Context: Strategy, Structure, and Culture
Chapter 1 – Basics of Operations Management
Asset Governance – Integrated Strategic Asset Management
KEY PRINCIPLES OF THINKING SYSTEMICALLY
Information Systems in Global Business Today
The Organizational Context
The Duck and the Lemonade Stand
Chapter 1: Introduction to Process Management
Human Resource Management
Pearce & Robinson, 10th ed..
Purchasing and Supply Chain Management
Stakeholder Management
CHAPTER 9 (part a) BASIC INFORMATION SYSTEMS CONCEPTS
Chapter 1 Strategic Management McGraw-Hill/Irwin
The Organizational Context: Strategy, Structure, and Culture
The Organizational Context: Strategy, Structure, and Culture
The Organizational Context: Strategy, Structure, and Culture
Environment and Development Policy Section
Presentation transcript:

Enterprise Design Process: Business Processes Johan Strümpfer

Enterprise Design Tool 1/ View 1

ENTERPRISE PARTS INTERACTING AROUND AN OVERARCHING BUSINESS PURPOSE NOT A CONGLOMERATE NOT NECESSARILY A GROUP WITH PARTS MORE OR LESS IN THE SAME BUSINESS NOT A FINANCIAL HOLDING A SYSTEM

ENTERPRISE DESIGN THE DELIBERATE ARRANGEMENT OF FACTORS INTO A SYSTEM THE INTEGRATION OF INTERACTIONS INTO A REGULATED WHOLE

SYSTEM A regulated set of relationships Interacting and interrelated parts Parts organised for a purpose a Whole with novel features

SYSTEM FACETS FUNCTION STRUCTURE PROCESS REGULATION

DEFINITION OF STRUCTURE Relationships that remain unchanged Duration of interest Stability and relative change

Process View

Process view: PURPOSE ä INTRODUCES CONCEPT OF ENTERPRISE AS SYSTEM AS LINKED PROCESSES ä BROADENS SCOPE OF POSSIBLE INTERVENTIONS ä STAGE 1 OF ENTERPRISE DESIGN

DEFINITION OF PROCESS ä Altering or changing of relationships ä Time frame of interest ä Flows and transformations of Matter, Energy & Information (MEI) ä Internal to systems boundary, Input & Output ä Structure: static; Process: Dynamic

PROCESS VIEW OF SYSTEM ä INPUT ä TRANSFORMATION ä OUTPUT I T O SYSTEM

CLASSIC ORGANISATIONAL STRUCTURE Lines of authority, responsibility, accountability

PROCESS ORGANISATIONAL VIEW “Manage the white spaces”

BASES OF DIFFERENTIATION AND INTEGRATION ä Classical ä Functional division ä The whole is integrated at the top ä Optimisation of the parts yields optimisation of the whole ä Process ä Process division ä The whole is integrated at the bottom ä Optimisation of the whole is different from optimisation of the parts

ä Systemic ä Differentiation & Specialisation ä Integration & Synthesis ä System development ä Integrate AND Differentiate ä All bases of division BASES OF DIFFERENTIATION AND INTEGRATION-2 and or

PROCESS REDESIGN ä Develop Process Objectives ä Identify Processes to be Redesigned ä Understand and Measure Existing Processes ä Identify IT levers ä Design and Build Prototype Process ä Davenport & Short (1990)

PROCESSES ä Logically related tasks to achieved defined business outcome ä Have customers, i.e. defined business outcomes ä Cross organisational [functional] boundaries ä Davenport & Short (1990)

RE-ENGINEERING ä Organise around outcomes, not tasks ä Let output consumers produce output ä Integrate information processing with real work producing the information ä Place decision making where work is performed and build control into process ä Treat geographically dispersed resources as centralised ä Link parallel activities instead of integrating results ä Capture information once and at source ä M Hammer, HBR,1990

CHARACTERISTICS OF BUSINESS RE-ENGINEERING ä Re-work the transformation, not the output. ä Singular (insular) view (process) of the organisational structure ä Substitution of one basis for organisation for another ä Heavy dependence on IT perspective ä Patchwork of (some good) concepts; lacks rigour ä Design orientation ä Transcends current boundaries ä Promotes questioning --- What framework? ä Stretches value chain thinking

DISCUSSION ä Relate your own experiences and understanding of business re- engineering

ä Biomatrix ä Teleon ä Doublet ä Telentropy ä Sub-teleon ä Sub-doublet ä Endo, Exo, Centro-teleon ä..... ä Gyuri Jaros & Anakrion Cloete...OF BIRDS AND BEES...

Woven mat of processes: ä Sets of connected activities aimed at purpose ä Interlinked and intersecting processes ä Production processes ä Support processes

PROCESS CHARACTERISTICS ä INPUT, TRANSFORMATION, OUTPUT ä HAS PURPOSE AND GOALS ä STRUCTURE ä REGULATED ACTIVITIES ä MEASURES OF PERFORMANCE ä TELENTROPY ä RIGIDITY, FLEXIBILITY & REDUNDANCY

TELENTROPY ä INVERSE OF LIKELIHOOD OF ACHIEVING ITS GOAL ä Low telentropy = good chance of achieving goal ä High telentropy = low chance of achieving goal ä TELENTROPY “=“ STRESS ä TELENTROPY TRANSFERABLE

EXERCISE ä List 2-3 major processes in your personal life ä List 3-5 major processes in your organisation ä USE PROCESS CHARACTERISTICS CHECKLIST TO DEFINE PROCESSES

PURPOSE OF DESIGN PROCESS ä DESIGN A DESIGN: Model of what ought to be ä CRITICAL REFLECTION: Template for questioning design and reality ä ALIGNMENT: Building up SHARED model of how business works ä PARTICIPATION: Framework for participative design

PROCESS VIEW DESIGN PRINCIPLES ä Outward - Inwards design, not reactive: Holistic ä Actively searches out multiple viewpoints ä Structures and supports a group learning process: Participative ä Uses a formal systems model as design template ä Uses a systems approach to structure design process ä Integrated with overall enterprise design process

DESIGN PROCESS ¶ STAKEHOLDER VIEW · OUTPUTS REQUIRED ¸ PROCESS DEFINITION ¹ PROCESS MODELLING º COMPARISON » ORDERING ACTIVITIES

PROCESS DESIGN PROCESS STAKEHOLDERS? EXPECTATIONS? OUTPUTS? PROCESS ID & DEFINITION TRANSFORMATION ACTIVITIES? MONITORING & CONTROL ? IT ROLE? COMPARISON CATEGORISE

SOURCES ä ACKOFF: Redesigning the Future & Creating the Corporate Future ä Gharajedaghi: Towards a Systems Theory of Organization & Unpublished material ä Mason & Mitroff: Various on Stakeholders ä Churchman: Design of Inquiring Systems, Systems Approach and Its Enemies ä Checkland et al: Soft Systems Methodology

STAKEHOLDER * ä Stakeholder’s view of the enterprise ä Stakeholder’s logic, rationale and value systems ä Stakeholder’s choice to be stakeholder

STAKEHOLDERS ä Who should be served? ä Who should (are) the stakeholders? ä Who should (are) the clients/beneficiaries?

EXPECTATIONS ä What should the purpose be, from the client’s (beneficiary’s) perspective? ä What should (are) the client’s measures of performance? ä What are the underlying worldview assumptions that makes this meaningful to the client?

WHAT ARE THE OUTPUT GOALS? ä What should be produced to satisfy the expectations of the particular client/stakeholder? ä What are the tangible and intangible deliverables? ä What are time related requirements to satisfy the expectations?

PROCESS DEFINITION Checklist ä What is the input, output and transformation? ä Who is the client/customer? ä Who are the actors in the transformation? ä Who are the owners of the transformation? ä Who are the decision makers of the process? ä Why is this transformation assumed to be meaningful? ä What is the purpose of this transformation? ä What are its measures of performance? ä What environmental factors impact directly on this transformation?

PROCESS ACTIVITY MODEL ä One process definition and model per output ä Set of logically linked activities required to perform the transformation ä Elements of model are verb phrases: Activities ä ONLY activities that can be related to definition may be included ä 5-12 activities per model

MONITORING AND CONTROL ACTIVITIES ä Expand model to include monitoring and control of process within process ä Efficacy, efficiency and effectiveness: ä Efficacy: Does the process achieve its goals (output, time)? Telentropy: Likelihood of achieving goals ä Efficiency: Resources used per production unit. ä Effectiveness: Do the goals satisfy the (longer term) purpose and expectations? ä What should be measured for efficacy monitoring? ä What should be measured for efficiency monitoring? ä What should be monitored for effectiveness? ä Required reporting (including telentropy) and control activities?

ROLE OF INFORMATION TECHNOLOGY AND SYSTEMS? ä What should be done differently because of enabling technologies? ä How should activities be done making use of IT/IS? ä Specialist input required ä Refer guidelines

IT/IS GUIDELINES FOR “INFORMATIONALISING”: ä Mass customisation ä Rapid, real time response ä Manufacture at point of delivery ä Shrinking Overhead, Inventory, Working Capital ä Direct customer access & service levels ä Interlinking organisations ä Logistics and globalisation ä Stan Davis & Bill Davidson: Vision 2020, Future Perfect

COMPARISON ä Activity models reflects designed ideal ä Reflect on requirements for rigidity vs. redundancy and flexibility ä Use models as basis for critical reflection on what is and should be implemented ä Cultural issues, value changes ä Human dimension (training, competencies) ä Political feasibility ä Impact dynamics ä Group debate and design of implementation: Interaction

ORDERING OF ACTIVITIES ACROSS ALL PROCESSES ä CATEGORIES OF ACTIVITIES: ä Monitoring and Auditing ä Co-ordinating activities ä Control activities ä Primary production activities. ä Support process activities ä Common, shared activities