GLAST LAT ProjectMarch 24, 2003 3B Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 3B: EM Mini-Tower Robert Johnson.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Advertisements

GLAST LAT ProjectPeer Review, March 24-25, D 1 Gamma-ray Large Area Space Telescope 7D: Tray test plans GLAST Large Area Telescope: GLAST Large Area.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
The Gamma-ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE The GLAST LAT Silicon Strip Tracker-Converter.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 R.P. Johnson, UCSC 1 Silicon-Strip Tracker Converter Robert P. Johnson Santa.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMay 20, 2003 LAT Engineering Meeting Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Revisions to Tray Design.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT ProjectDOE/NASA Delta Baseline/Preliminary Design Review, July 30, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS.
1 GEOMETRY FOR TRACKER Eduardo do Couto e Silva - 2/11/00 (drawings are NOT to scale) 1 - List of Figures 2 - Top view of tray with 5 x 5 detectors 3 -
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Performance Predictions.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Electronics Design and.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
The Gamma-ray Large Area Space Telescope: The GLAST LAT Silicon Strip Tracker-Converter Robert P. Johnson, U.C. Santa Cruz and the Santa Cruz Institute.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
SPIE 4784A-35 GLAST LAT Silicon Tracker Robert P. JohnsonSPIE 47 th Annual Meeting1 GLAST Large Area Telescope Silicon-Strip Tracker Robert P. Johnson.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Introduction Robert Johnson.
GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept GLAST-LAT International Collaboration Meeting Roma,
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mini-Tower test results
GLAST LAT tracker signal simulation and trigger timing study
Investigation on tray MID 063 Back
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson Santa Cruz Institute for Particle Physics University of California at Santa Cruz Tracker Subsystem Manager Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Mini-Tower Objectives Develop and test tray assembly procedures with real electronics and detectors. Test the readout electronics in a realistic environment. Test the detector system with minimum-ionizing particles (cosmic rays). Exercise the TEM based readout with multiple layers and multiple cables. Platform for development of Tracker subsystem test procedures and software that will be needed for flight-module production. Platform for I&T preparations. Note: this device is not intended to be used for environmental testing, mechanical or thermal.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Mini-Tower Configuration The essence: –3 instrumented x,y silicon-strip detector planes –Each x,y plane is preceded by a thin tungsten foil (3% rad. len.) The details: –4 light composite panels supporting SSD ladders –1 bottom tray with no SSD but with the mechanical interface to the grid This is an older prototype tray refitted by COI with preliminary versions of the titanium reinforcement –8 short versions of the readout cables –8 MCMs (2 for each pair of readout cables) The 2 lowest MCMs have no SSDs connected but are required in order to complete the data transmission circuit –Inexpensive aluminum walls

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Extra Functional Tray Another tray, instrumented on both sides with SSD and electronics, plus thin converter foils, is being assembled in Italy. This is in addition to the Mini-Tower. This tray will undergo complete environmental testing to qualification levels, including –Random vibration: GEVS (LAT-TD-01004) –Thermal vacuum:  30  C to +50  C (LAT-TD-01037) This will complement the environmental testing of the mechanical- thermal tower module, which will not include functional detectors and electronics.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Mini-Tower Al “grid” fixture

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Mini-Tower Bottom Tray Refurbished extra bottom tray from the prototype mechanical tower Titanium and carbon-fiber reinforcement added by COI (intermediate design between the prototype tower and the final Hytec design). Vibration fixture frame Bottom face of the bottom tray Titanium corner reinforcement and flexure blade Stainless Steel

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Mini-Tower Electronics 13 functional MCMs were assembled at Teledyne. 6 are in the mini-tower, and 2 more will be on the tray destined for environmental testing. 2 of them are shown below, in protective cases, connected to 2 Mini-Tower readout cables (via connector savers). The cables are connected to a TEM module.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Mini-Tower Tray One of the functional EM trays, inside its service box.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Leakage currents Leakage current remains within specifications for all tested trays (no damage during assembly). The leakage current measured on full trays is in most cases lower than the sum of the single-ladder currents (but ladders were tested at 22º average temperature, while trays were tested at 17.5 º).

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Grounding Considerations Handles for assembly/storage fixtures MCM ground point (1 of 3), required scraping off conformal coat Initially the aluminum honeycomb core was floating, resulting in a huge increase of noise when trying to ground the box containing the tray. Good ground electrical contact (handles-honeycomb and MCM-honeycomb) was accomplished through long screws that touch the honeycomb (as was always in the specification). This solved all grounding-related noise problems.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Noise Trigger Rate The noise trigger rate is monitored for each FE chip as a function of discriminator threshold. Residual triggers at high threshold are due to cosmic rays. OR of 64 Channels

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Masking Noisy Channels: TS001 Threshold 115 V with 7 noisy strips masked With the 7 noisy strips (<0.5%) masked, the behavior of the counting rate as a function of threshold is quite uniform over the whole tray.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Pitch Adapter Issues Threshold Scan at 115 V with 6 noisy strips masked. Problems with the pitch adapters used by Teledyne for the functional EM MCMs resulted in sections of some MCMs in which most strips could not be wire bonded to the SSDs. This leaves holes in the coverage, as illustrated below. This problem with the pitch adapter design has been resolved (Presentation 6E). Region of bad pitch-adapter alignment.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Ruthenium  Source Profile Some noisy strips masked. TG001 Front

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Cosmic Ray Triggers Number of fired strips per event. Number of clusters per event. TS001 Front