Quincy High School Quincy, Massachusetts Design Concept Award High School Symmes, Maini & McKee Associates 2010 Exhibition of School Planning and Architecture.

Slides:



Advertisements
Similar presentations
Project Name Location Category of Entry Award Type Firm Name 2011 CEFPI North East Region Exhibition of School Planning and Architecture.
Advertisements

Monroe Elementary Everett, Washington Project of Distinction Award- New Construction Elementary School Dykeman, Inc. 2012Exhibition of School Planning.
TARVER ELEMENTARY SCHOOL Temple, Texas Elementary School New Construction Project SHW Group 2008 Exhibition of School Planning and Architecture.
Southwest High School Albuquerque, New Mexico High School Design Concept / Projects Under Construction Award Perkins+Will 2008 Exhibition of School Planning.
Austin, Texas 2013 CEFPI Southern Region Conference.
Druid Hills High School
2011 Exhibition of School Planning and Architecture
Mountainside Middle School Mead, Washington New Construction Middle/Junior High School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
The University of Sacramento Design of New Campus Sacramento, California Design Concept Award Projects in the Design Phase Holabird & Root 2009 Exhibition.
Silver Crest Elementary School HERRIMAN, UTAH Project of Distinction – New Construction Elementary School VCBO Architecture 2010 Exhibition of School Planning.
East Fairhaven Elementary School Fairhaven, MA Elementary School Project of Distinction Submission HMFH Architects, Inc Exhibition of School Planning.
Clark County School District Virtual High School and Vegas PBS Las Vegas, Nevada Project of Distinction New Construction JMA Architecture Studios 2010.
College of Southern Nevada Instructional Center – City of Las Vegas Fire Station Las Vegas, Nevada Project of Distinction New Construction JMA Architecture.
San Antonio College Nursing and Allied Health Complex Location: San Antonio, Texas Category of Entry: New Construction Award Type: Institutions of Higher.
Rogers High School Spokane, Washington The Lee Brockway Award for Renovations High School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
La Quinta High School Career Technical Education La Quinta, CA Projects in the Design Phase Design Concept Award Ruhnau Ruhnau Clarke 2010 Exhibition of.
Peachtree Charter Middle School Dunwoody, Georgia Project of Distinction – New Construction Middle/Junior High School Cooper Carry, Inc Exhibition.
Northeast Indiana Regional Public Safety Academy Fort Wayne, Indiana New Construction Project of Distinction SchenkelShultz Architecture 2008 Exhibition.
Bulverde Green Elementary School San Antonio, Texas Elementary School Design Concept Pfluger Associates Architects 2008 Exhibition of School Planning and.
Wellesley High School Wellesley, Massachusetts Design Concept Award High School Symmes, Maini & McKee Associates 2010 Exhibition of School Planning and.
MONTGOMERY HIGH SCHOOL MODERNIZATION & NEW CONSTRUCTION
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture.
Westwood Elementary School San Diego, California Elementary School Lighthouse Renovation NTD Architecture 2008 Exhibition of School Planning and Architecture.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
East Ridge Middle School Clermont, Florida New Construction Project Project of Distinction SchenkelShultz Architecture 2008 Exhibition of School Planning.
Hillside Elementary School New Richmond, Wisconsin Elementary School Project of Distinction – New construction ATS&R Planners/Architects/Engineers 2009.
Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning.
École secondaire catholique Jean-Robert-Gauthier - Phase II Ottawa, Ontario, Canada New Construction Project of Distinction Edward J. Cuhaci and Associates.
Osseo Adult Education Center Brooklyn Center, Minnesota Other: Adult Education Project of Distinction – New construction ATS&R Planners/Architects/Engineers.
GARFIELD HIGH SCHOOL historic renovation/addition Seattle, Washington High School Renovation/Addition BLRB Architects 2009 Exhibition of School Planning.
Lansing Community College University Center Lansing, Michigan New Construction Project Project of Distinction SHW Group 2008 Exhibition of School Planning.
Little Cedars Elementary School Snohomish, Washington Elementary School Project of Distinction – New Construction NAC|Architecture 2008 Exhibition of School.
Westside Elementary School
Eastern Guilford High School Guilford County, NC New Construction Project of Distinction SFL+A Architects 2009 Exhibition of School Planning and Architecture.
Grant Community High School District 124 Fox Lake, Illinois High School Additions OWP/P | Cannon Design 2010 Exhibition of School Planning and Architecture.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Swiftwater Elementary Center Swiftwater, Pennsylvania Project of Distinction Elementary School Gilbert Architects Inc Exhibition of School Planning.
Marco Antonio Firebaugh High School Lynwood, California High School Project of Distinction - New Construction Projects LPA, Inc Exhibition of School.
West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.
Lawrence High School Lawrence, Massachusetts High School New Construction Project of Distinction Flansburgh Architects 2008 Exhibition of School Planning.
Groton-Dunstable Regional High School Groton, Massachusetts High School Project of Distinction Submission HMFH Architects, Inc Exhibition of School.
Los Angeles County High School for the Arts Los Angeles, CA Design Concept Award HMC Architects 2008 Exhibition of School Planning and Architecture.
Roosevelt and Jackson Elementary Schools
Malibu High School/Middle School Modernization and Reconstruction Malibu, CA Design Concept Award HMC Architects 2008 Exhibition of School Planning and.
2009 Exhibition of School Planning and Architecture
Fabyan Elementary School
DePauw University Judson and Joyce Green Center for the Performing Arts Greencastle, Indiana New Construction Project of Distinction Institutions of Higher.
Samuel Brighouse Elementary School
2009 CEFPI Exhibition of School Planning and Architecture Mountain Green Elementary School Mountain Green, Utah Project of Distinction Elementary School.
Columbus Signature Academy New Tech Campus – Phase 1 Columbus, Indiana Lee J. Brockway Award Renovations High School CSO Architects 2009 Exhibition of.
Catherine Kolnaski Elementary School
Eastgate Elementary School Bellevue, Washington Elementary School Design Concept Awards – Projects in the Design Phase NAC|Architecture 2008 Exhibition.
Bothell High School Phase I - III Bothell, WA Project of Distinction – New Construction DYKEMAN Architects 2010 Exhibition of School Planning and Architecture.
Bow Lake Elementary School SeaTac, Washington Elementary School New Construction BLRB Architects, p.s Exhibition of School Planning and Architecture.
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2011 Exhibition of School Planning and Architecture.
don r. roberts elementary school
Blue Springs High School Blue Springs, MO Project in the Design Phase Design Concept Award Hollis + Miller Architects 2009 Exhibition of School Planning.
CHURCH HILL MIDDLE SCHOOL New Braunfels, Texas Middle School Lighthouse Award SHW Group 2008 Exhibition of School Planning and Architecture.
Glacier High School Kalispell, Montana High School Project of Distinction (New) CTA Architects Engineers 2008 Exhibition of School Planning and Architecture.
Project Name City, State School Type Construction Type Submitting Firm [YEAR] Monarch Award Please Note: PPT style may be altered to allow for creativity.
Jackson Community College Information & Technology Center Jackson, Michigan New Construction Project Project of Distinction SHW Group 2008 Exhibition of.
Issaquah High School Issaquah, Washington High School Design Concept Award Mahlum Architects 2008 Exhibition of School Planning and Architecture.
2017 Exhibition of School Planning and Architecture
2008 Exhibition of School Planning and Architecture
Silver Lake Regional High School
Glacier View Junior High
Location Category of Entry Award Type
2016 Exhibition of School Planning and Architecture
2019 Exhibition of School Planning and Architecture
2011 Exhibition of School Planning and Architecture
Presentation transcript:

Quincy High School Quincy, Massachusetts Design Concept Award High School Symmes, Maini & McKee Associates 2010 Exhibition of School Planning and Architecture

Quincy High School

Entry Court Community Environment: Planned for a total of 1,500 students at 330,000 square feet, and constructed in four major phases, Quincy’s new school is organized around four “academies of excellence:” Science and Technology, Humanities, Arts Academy, and a Ninth-Grade Academy to support the transition of students from the City’s six middle schools. The facility’s prime centralized location in downtown Quincy bolsters the school’s role as an important civic and community resource for arts and athletics. The two main public assembly spaces, the gymnasium and theater, are grouped together at the new main entrance of the school for easily accessible community use. The school will open in Fall 2010.

Entry Community Environment: The plan organization forms a courtyard off the busy Coddington Street corridor, creates a refuge for students, and provides quiet green space for the cafeteria, media center, and the culinary arts restaurant run by students, serving food to the public.

Program Adjacencies Learning Environment: Due to the School’s unique academies of excellence structure, there are clear organizational groupings for each academy. Community access is provided to all major public spaces, and the courtyard serves as an organizing element for building users. New Facade Historic Facade Courtyard: Privacy Open Air Refuge in the City Theater Gym S.T.E.M. Academy 1938 Building Rotunda Entrance Main Entrance Freshman Academy Fine Arts Academy Commons Restaurant

Science Wing Learning Environment: Students can now access a spectrum of collegiate- focused academic classes and hands- on, state-of-the-art project-based lab and shops. Science, technology, engineering, and mathematics (STEM) programs erase the barriers between the vocational and standard high school, creating dynamic connections: physics and mathematics; engineering and electrical and plumbing; nursing and biology and chemistry laboratories.

Existing Site Plan Physical Environment - A significant challenge to the team was to integrate academic programs on a tight urban site that was fully occupied throughout construction. A major protected wetland is directly adjacent to the building, and is within a coastal flood zone requiring careful mitigation. The new building dramatically wraps around the existing 1933 historic high school, with crisp, sympathetic architectural styling and detailing.

Rotunda Section Physical Environment - Cost effectiveness and community resources: SMMA achieved square footage reductions through program integration and planned future growth. A high-quality and durable materials were used throughout. A energy- efficient strategies were employed to exceed minimum code requirements. Sustainable features of the design: Materials are high-quality and durable. Energy-efficient strategies exceed minimum code requirements. Sustainable “garden” and greenhouse connect to the science academy with hands-on programming. Maintaining the downtown location close to existing mass transit means no school busing. Daylighting and natural ventilation strategies were applied throughout, along with highly-efficient lighting systems with full nighttime shutoff. The original 1938 High School was retained while demolishing less efficient additions.

Entry Planning Process: SMMA worked closely with the City’s School Administration and Mayor’s office to insure the highest quality academic and physical plan. The change from a departmentally-organized model – where teachers work in silos of single disciplines – to an academy structure of combined excellence in support of the broader interest of contemporary students was a significant project objective.

Main Entry Planning Process: SMMA worked with all staff to engender support for the complex changes engendered in the plan, particularly the inclusion of the Ninth Grade Academy, and the complete synthesis of vocational programs and standard academic programs.

First Floor Plan

Second Floor Plan

Third Floor Plan

Fourth Floor Plan

Exhibition of School Planning and Architecture 2010 Project Data Submitting Firm :Symmes, Maini & McKee Associates Project RoleArchitect/Engineering Firm Project ContactAlex C. Pitkin, AIA, LEED AP TitlePrincipal, Senior Vice President Address1000 Massachusetts Ave. City, State or Province, CountryCambridge, Massachusetts Phone Joint Partner Firm: Project RoleNot Applicable Project Contact Title Address City, State or Province, Country Phone Other Firm: Project Role Project Contact Title Address City, State or Province, Country Phone Construction Firm:Gilbane Building Company Project RoleConstruction Firm Project ContactWilliam F. Kearney TitleSenior Project Executive Address155 Federal Street City, State or Province, CountryBoston, Massachusetts Phone

Exhibition of School Planning and Architecture 2010 Project Details Project Name Quincy High School City Quincy State Massachusetts District Name Quincy Supt/President Dr. Richard DeCristofaro, Superintendent Occupancy Date Fall 2010 Grades Housed 9-12 Capacity(Students) 1,500 Site Size (acres) 18 acres Gross Area (sq. ft.) 325,000 sf Per Occupant(pupil) 217 gross/net please indicate gross Design and Build? No If yes, Total Cost: Includes: If no, Site Development: $4,320,000 Building Construction: $110,540,000 Fixed Equipment: $5,365,620 Other: $6,274,380 Total: $126,500,000