Presentation is loading. Please wait.

Presentation is loading. Please wait.

Druid Hills High School

Similar presentations


Presentation on theme: "Druid Hills High School"— Presentation transcript:

1 Druid Hills High School
2011 Exhibition of School Planning and Architecture Druid Hills High School Atlanta, Georgia Renovations High School Perkins+Will

2 Druid Hills High School

3 Druid Hills High School

4 Project Description Originally housed in a 1930's historic building, Druid Hills High School now occupies three disconnected structures on its confined site in a primarily residential neighborhood in Atlanta. Over the years the school grew to included a free-standing cafeteria building and what was previously an adjacent elementary school. Our addition links the cafeteria and the old elementary school building creating a new facade for the campus. In deference to the original historic building, the new addition pulls away from this existing building and sets it off with a glass corner and set-back entry way. With its window pattern that is a modern recall of the original building's fenestration, the brick facade of the addition curves away further emphasizing the historic structure. The addition includes eight new science labs, four classrooms, and administrative support space.

5 Existing 1930’s building with the addition in the background

6 New Addition

7 Image title Learning Environment: Continued Science Classrooms

8 Interior IMAGE New student community space between the addition and existing structure.

9 Building Entrance IMAGE New student entrance at addition

10 First Floor Plan

11 Second Floor Plan

12 First Floor Plan (Addition & Renovation)
Addition shown in green. Renovated areas shown in orange.

13 Second Floor Plan (Addition & Renovation)
Addition shown in green. Renovated areas shown in orange.

14 Exhibition of School Planning and Architecture 2010 Project Data
Submitting Firm : Perkins+Will Project Role Architect Project Contact Barbara Crum Title Principal Address 1315 Peachtree St. City, State or Province, Country Atlanta, GA 30309 Phone Joint Partner Firm: Not Applicable Project Role Project Contact Title Address City, State or Province, Country Phone Other Firm: Project Role Project Contact Title Address City, State or Province, Country Phone Construction Firm: Project Role Project Contact Title Address City, State or Province, Country Phone

15 Exhibition of School Planning and Architecture 2010 Project Details
Project Name  Druid Hills High School City Decatur State Georgia District Name  Dekalb County School System Supt/President  Barbara Colman, Interim CIP Operations Officer Occupancy Date  August 2010 Grades Housed  9-12 Capacity(Students)  1,200 Site Size (acres)   acres Gross Area (sq. ft.)  175,000 Per Occupant(pupil)  145 sq. ft gross/net please indicate Design and Build?  No If yes, Total Cost: Includes: If no, Site Development: Building Construction:  $15,500,000 Fixed Equipment: Other: Total:  $21,000,000


Download ppt "Druid Hills High School"

Similar presentations


Ads by Google