One day National workshop on Convergence of MGNREGS with other scheme

Slides:



Advertisements
Similar presentations
Indira Awaas Yojana Tamil Nadu Housing is an essential component for a living standard. IAY is a blessing in disguise for the rural poor to have a quality.
Advertisements

NATIONAL WORKSHOP ON MIS FOR NREGA NATIONAL WORKSHOP ON MIS FOR NREGA Dr MCR HRD Institute, Hyderabad MINISTRY OF RURAL DEVELOPMENT GOVERNMENT OF INDIA.
SessionIII:Monitoring and MIS
NREGA and PO.
NREGA MIS Workshop Dr MCR HRD Institute, Hyderabad MORD, New Delhi.
1 2 3 By S Ministhy, DM Barabanki NBA & MNREGA in Barabanki ”NBA &MNREG A in Barabanki” Objectives – Increase female participation, end open defecation,
+ Convergence in NREGA Maharashtra. + Areas of convergence Taking up of works on watershed approach Convergence with technical resource personnel empanelled.
National Rural Employment Guarantee Act NREGA
K. Ravi Kumar Dy. Commissioner Godda, Jharkhand. No. of Total Households : 2,52,756 Registered HHs under MGNREGA : 1,79,015 SC -: 11,243 ST -: 38,713.
CAMPAIGN FOR DRI LOANS TO IAY BENEFICIARIES GUJARAT.
Real-time Transaction based e-Governance project Mahatma Gandhi NREGA.
NIRMAL BHARAT ABHIYAN madhya pradesh
Pratham Softwares presents SOFTWARE FUND MANAGEMENT MONITORING SCHEME Today’s Software for tomorrow YOJNA.
NATIONAL RURAL EMPLOYMENT GURANTEE ACT
Part A NBA + MGNREGA Part B MGNREGA + Other Schemes.
Convergence of MGNREGS "A STEP AHEAD". Wage Employment to Sustainable Livelihood VISION.
Mahatma Gandhi National Rural Employment Guarantee Scheme Rajasthan An approach for creation of durable assets and enhancement of livelihood through Convergence.
Challenges in IAY implementation – issues and solutions.
Online Monitoring National Rural Employment Guarantee Act (NREGA)
Project on Convergence MGNREGS – NRLM and CFT Strategies
Pratham Softcon Pvt Ltd.
SCALING UP RURAL SANITATION PROGRAMME IN INDIA WITH QUALITY AND CONVERGENCE NATIONAL SEMINAR ON DECENTRALIZED GOVERNANCE IN WATER AND SANITATION 28 TH.
ELECTRONIC FUND MANAGEMENT SYSTEM (e-FMS)
PRESENTATION ON THE CONVERGANCE OF NBA WITH MGNREGA IN DAVANAGERE DISTRICT OF KARNATAKA DAVANAGERE 12 TH SEPTEMBER, 2013.
National Conference of Project Directors of DRDAs 2011 Mahatma Gandhi NREGA Group II.
INSTITUTIONAL PAYMENT UNDER MGNREGS. Every person working under the Scheme shall be entitled to wages at the minimum wage rate fixed by the State Government.
Presentation on SOCIAL AUDIT ( )
Social Audit Unit under MGNREGA Tripura
MG NREGS BARMER, RAJASTHAN.
Government of Rajasthan INITIATIVE ON Governance Reforms, Transparency & AccountabilityGovernance Reforms, Transparency & Accountability.
WELCOME. IAY/RAY 1.Housing is a fundamental human need. 2.Basic requirement for human survival as well as for a decent life. 3.Provides shelter from the.
Empowering women and increasing women participation through “All Women Scheme” in Gurap G. P. under Dhaniakhali Block in Hooghly District SUCCESS STORY-
HUL286 Class presentation Group 3.  The basic objective of the Act is to enhance livelihood security in rural areas by Providing at least 100 days of.
Group Presentation MGNREGA. Issues in MGNREGA Delay in payment Issues in Work completion Issues in MIS Entry.
REVIEW MEETING ON RURAL DEVELOPMENT SCHEMES UNDER THE CHAIRMANSHIP OF HON’BLE MINISTER, RD Date: , Venue:- Pragna Bhawan, Agartala Venue:- Pragna.
Implementation process of Mahatma Gandhi NREGS. At GP level Schemes deals with MGNREGS, TFC, KL Grant, GP Fund. MGNREGS Maintaining of Case Record in.
National Rural Employment Guarantee Act (NREGA) notified on 7th September, 2005 Aims at Enhancing livelihood security of households in rural areas of.
 An independent society known as ‘Mahatma Gandhi National Employment Guarantee Scheme- Social Audit Society’ has been registered on under.
Labour Budget  Concept  Components  Administrative system  Procedural steps 1.
National Training Raipur 28-31st July
Summary of Positive outcomes and Challenges of IPPE-1 28 th July 2015 Raipur.
INSPECTION OF SCHEMES. PROCESS OF EARLIER INSPECTIONS INSPECTION TEAM VISITS GRAM PANCHAYATS. ASKS FOR SCHEMATIC DOCUMENTS. FILLS THE INSPECTION FORMAT.
An overview of features and current debates 21/01/2013 The Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA) 2005.
Group No. IV Total Sanitation Campaign – A way forward.
1 Performance review of the D/o RD & PR for RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT.
1.
Madhya Pradesh Chief Minister Rural Housing Mission.
Indira Awaas Yojana Ministry of Rural Development, Government of India.
1 PRC Meeting Date : RD & PR Department, Govt. of Rajasthan, Jaipur Mahatma Gandhi NREGA.
1 NATIONAL RURAL EMPLOYMENT GUARANTEE ACT EMPLOYMENT GUARANTEE AND THE RIGHT TO WORK.
Convergence of MGNREGS & NRLM Experience from Kerala Presentation at the National Workshop on Convergence of MGNREGA with Other Programmes New Delhi; 17.
WEL COME PREPARATION OF CASE RECORDS. MODEL CASE RECORDS A Model Case Record should contain  Order sheet duly numbered  Copy of Approved Annual Action.
Mission Antyodaya (IPPE-II)
Key Achievements of IPPE - I Participatory Planning completed in about 93,500 GPs About 250,000 block planning team members trained from among youth from.
APREGS Shelf of Works. Work Identification DISTRICT EGS PLAN Work Identification Gram Sabhas ZP meeting GP EGS Plan PO Consolidates EGS Plans from all.
NARASINGHPUR PANCHAYAT SAMITI, CUTTACK WELCOMES YOU ALL 26/04/2010.
Mahatma Gandhi NREGA Government of Jharkhand Measures for Reduction of Delays in Wage Payment under MGNREGA.
INDERJEET SINGH DISTRICT COLLECTOR & DPC CHITTORGARH,RAJASTHAN 19 th May, 2016 PRESENTATION FOR AWARD FOR EXCELLENCE IN MAHATMA GANDHI NREGA ADMINISTRATION.
Swachh Bharat Mission (Gramin)
Format for Presentation on Innovative Practices for States TWO DAYS CONFERENCE OF CEOs OF SLNA STATE :GUJARAT TO REVIEW IMPLEMENTATION OF WDC-PMKSY (ERSTWHILE.
GROUP REPORT ON NIRMAL BHARAT ABHIYAN GROUP-IV. Key Issues Convergence with MGNREGA Motivation of beneficiaries/IEC activities Technical issues in Construction.
Department of Rural Development Government of Andhra Pradesh
District Profile Coastal district comprising three blocks Varied topography ranging from coastal, plain and hilly regions Educational hub Economic activities.
Mahatma Gandhi National Rural Employment Guarantee Act-2005 (MGNREGA)
National Rural Drinking Water Programme
NREGA: THE BEGINING The National Rural Employment Gurantee Act(NREGA) notified on september’2007. Burdwan district come under notififation of NREGAfrom.
Mahatma Gandhi National Rural Employment Guarantee Act-2005 (MGNREGA)
MUSTER ROLL VERIFICATION
Mid Day Meal Scheme PAB-MDM Meeting – Rajasthan
employment and empowerment
Presentation transcript:

One day National workshop on Convergence of MGNREGS with other scheme 4/25/2017 9:38 AM MGNREGS One day National workshop on Convergence of MGNREGS with other scheme Dt. 17 Sept., 2013 © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION. 1

Model Estimate for IHHL The estimated cost of IHHL is about Rs. 14500/- comprising unskilled labour component–3000/-, Skilled labour component 2500/- and material component 5500/-, which can be meet out as under: Through NBA incentive – 4600/- Through MGNREGA – 4500/- Beneficiary Share – 5400/-

Provision through MGNREGA Under MGNREGA Unskilled labour (up to 20 person days) and skilled labour (up to 4 person days under material component) on construction of Individual Household Latrine is permitted subject to total expr. up to Rs 4500/-. .

Provision through NBA Under NBA an allowable incentive money of Rs. 4600/-, is being paid to beneficiary in two installments i.e. I installment of Rs. 3000/- as an advance for purchasing of material and remaining II installment of Rs. 1600/- after completion of IHHL and its valuation.

Steps taken by State for simplification of convergence for IHHL Issuing TS as per model estimate :- TS are being issued on the basis of model estimate to save time for issuing Financial Sanction.

2. Simplified Performa for UC/CC and valuation A simplified Performa for valuation and issue of UC/CC has been developed for reducing lengthy paper work early payment.

3. Incentive to Field Functionaries :- Incentive amount is being paid to Field Functionaries as a motivator after declaration of GP as ODF - Gram Rozgar Sahayak - Rs. 50/- Per IHHL Technical Assistant - Rs. 25/- Per IHHL Block Coordinator - Rs. 2000/- for GP of 300 families. - Rs. 3000/- for GP > 300 families.

4. Provision of mate for better implementation Govt has decide to engage a mate on a cluster of 20-25 households for construction of IHHL. The so deployed mate will obtain form no. 6, will receive MR’s from block and will deposit filled MR’s back to PS after completion of cluster works. The mate will be responsible for taking attendance of wage seekers, for valuation of toilet constructed and to issue UC/ CC. The mate will be allowed maximum 20 days presence from either from administrative head of MGNREGA or from MGNREGA material component of Rs. 4500/- The mate will be provided an incentive of Rs. 50/- per IHHL from NBA.

5. Sanctions of IHHL alongwith IAY/CMBPL :- In Rajasthan, about 10 lacs Rural houses of BPL families are being constructed in IAY/CMBPL Aawas yojana and efforts are being made to sanction toilets in each house through convergence of NBA and MGNREGS.

6. Feeding of sanctions and MR’s in MIS:- Keeping in view huge pendency in feeding of sanctions and muster rolls in MIS, the feeding is permitted through out sourcing. an incentive money is being granted to the MIS manager/Data entry operators.

Progress of IHHL works under MGNREGA through convergence with NBA Total works sanctioned under NBA – 9.31 Lacs (including 4.30 lacs of CM BPL & IAY). Convergence with NREGA – 6.20 Lacs (including 2.85 lacs of CM BPL & IAY). 93000 MR's (15%) have been issued against 6.20 lacs toilets. 1.47 lacs (16%) Toilets have been completed against 9.31 lacs toilets.

Achievement In the year 2011-12, 321 GP's had been declared as Nirmal Gram Panchyat (NGP) by Ministry of Driking Water and Sanitation (MoDWS). In the year 2012-13, about 300 GP'S were made ODF, GoI is conducting survey to declared these GPS as NGP‘s. Likely ODF GPs - Bikaner (55GP) Churu ( 55 GP), Jhunjhunu (34 GP), Nagaur (30 GP) Jodhpur (28 GP), Hanumangarh (21 GP) Jaisalmer (21 GP), Ganganagar (14 GP) and Karauli (14 GP). In Churu district, Taranager block has become the first ODF block of the State and verification process is going for declaring other block Sardarshar as ODF block.

Problems The feeding of sanctions and muster rolls in MIS is very time consuming, so reflected entered progress in MIS is not up to the mark. A large no. of muster rolls are depositing back due to non deployment of wage seekers.

Suggestions 15 to 20 persondays may be added in the job card of beneficiary after completion of toilet. Material cost (as a part of permissible assistance of Rs 4500/ from EGS) may be transferred into the account of beneficiary towards cost of Skilled labour and material. Or There should be relaxation in depositing the muster rolls of IHHL works and it should be allowed for depositing after completion so as to save time and energy for frequent issuing of the same.