Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities 630.840.3640 Mu2e Working Group.

Slides:



Advertisements
Similar presentations
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Advertisements

Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Continual Improvement Ensuring the EMS is Effective! Internal Auditing, Corrective Actions & Management Review.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Muon Campus Controls Update Brian Drendel 8/6/13.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Mu2e WGM 7/27/2011 R. Ray Mu2e Project manager. Director’s Review We have settled on date for the Director’s CD-1 Review; Oct Focus of review will.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
EXAMPLE – Quality Control Plan For Consultants
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Mu2e Experiment and Issues Rick Coleman, Fermilab RESMM’12, February 2012.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Project Overview Ron Ray Mu2e Project Manager Fermilab Sept. 26, 2008 Preliminary Director’s Review of mu2e Fermilab.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Director’s Review of August 2-3, 2007 CLASSE ERL Conventional Facilities Donald Bilderback Cornell High Energy Synchrotron Source, School of.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Fermilab 1 SNUMI Civil Issues September 18, 2006Dixon Bogert SNUMI Civil Design & Site Considerations; Issues and FESS work Dixon Bogert SNUMI Meeting,
David Saenz EIR Review Oct 9-11, Conventional Facilities (CF) WBS 1.9 ETC and Methodology David Saenz CF Systems Manager.
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
How the NCSX Project Does Business
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Camera PDR/CD1 Planning 19 September 2008
CLIC Civil Engineering Update
News and brief overview of Beamline plans for the next few months
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
The Bunker Project Overview Zvonko Lazic
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
CF Scope, Management & Organization
JLEIC Accelerator R&D Meeting
Presentation transcript:

Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group May 19,

Overview Overview of Work to Date. ◦ Project Definition Reports Current Building Concept Requirements Costs Issues Summary Mu2e Working Group May 19, 20102

Project Definition Reports for September 2008 and May 2009 located in Doc DB #357. Sites that extracted beam at AP 60 were studied. Site near AP 20 at same location as the original P-Bar source tune up beam. Mu2e Working Group May 19, ANTIPROTON SOURCE 8 GeV Booster AP 60 AP 20 Alt. 2 Site GIESSE ROAD Alt. 1 Site Study Site

Alt. One Siting Beam Extracted at AP-60 routed west. Deep Beamline to transverse Indian Creek ◦ Potential Wetland Issues ◦ Disturb woods adjacent to creek Mu2e Working Group May 19, 20104

Alt. One Site Plan Services Routed from Main Injector/Mini BooNe Greenfield site Beamline interrupted by Indian Creek Mu2e Working Group May 19, 20105

Alt. One Detector Hall Plan Mu2e Working Group May 19, 20106

Alt One Summary Detector situated under crane, massive amount of shielding blocks used for 21 Feet of Cosmic Shielding Construction estimated at 18 months Loaded Construction cost estimated at $41 Mil 30% Contingency Risks included: ◦ Wetlands / Flood Plain ◦ Programmatic Requirements ◦ Subsurface Characteristics Mu2e Working Group May 19, 20107

Alt. Two Siting Beam Extracted at AP-20. Mu2e Working Group May 19, 20108

Alt. Two Site Plan Services Routed from CUB/ Antiproton Previously disturbed site Mu2e Working Group May 19, 20109

Alt. Two Detector Hall Plan Mu2e Working Group May 19, Detector Level Plan

Alt. One Detector Hall Plan Mu2e Working Group May 19, Grade Level Plan

Alt Two Summary Detector situated under two crane runways, 12 Feet of Cosmic Shielding Construction estimated at 18 months Loaded Construction cost estimated at $26 Mil 34% Contingency Risks included: ◦ Programmatic Requirements ◦ Subsurface Characteristics Mu2e Working Group May 19,

Current Site Plan Mu2e Working Group May 21,

Site Plan Mu2e Working Group May 19,

Detector Level Plan Mu2e Working Group May 21, ASSEMBLY AREA DUMP TARGET CELL WORK AREA / PRODUCTION SOLENOID TRANSPORT ASSEMBLY AREA 2 PRODUCTION DETECTOR BEAMLINE ELECTRONICS TRANSPORT

Grade Level Plan Mu2e Working Group May 19, TRUCK BAY ASSEMBLY AREA BELOW UPPER STAGING AREA ASSEMBLE AREA 2 BELOW ELECTRICAL, / MECHANICAL / CONTROLS CRYO SUPPORT

PS Mu2e Working Group May 19,

DS Mu2e Working Group May 19,

Longitudinal Section Mu2e Working Group May 19,

Beamline Purpose: To house beamline equipment that transports beam from AntiProton Source to Production Solenoid. 8’ wide x 8 ‘ high enclosure.(256 meters long) Constructed on cast-in-place concrete base slab using cut and cover excavation methods. 21’ Shielding (not confirmed) Personnel egress via stairs at each end; equipment access via shielded hatch Location for Power Supplies not yet determined; may require a Service Building. Mu2e Working Group May 21,

Requirements / Specifications Requirements / Specifications are acquired from the Project Team via: ◦ Weekly Tech Board Meetings ◦ Weekly Conventional Coordination Meetings ◦ Bi-weekly Beamline Meetings There is still a lot of work to develop a credible CDR. We will need to have either firm specifications or agreed upon placeholders by mid August to complete the scope drawings, system designs, cost estimate and schedule. This seems probable from the discussions so far. Requirements document in progress. Mu2e Working Group May 19,

Environmental / Life Safety Environmental / Life Safety The Conventional Construction aspects of the project is expected to conform to an existing CX. A RFP for environmental investigation and delineation of the wetlands along Indian Creek has been issued. If for some other reason (like beam energy) an EA is required then the Conventional Facilities will need to address all environmental impacts. Initial review with Life Safety Consultant, Schirmer Engineering. Need to firm up elevations before formal review. ODH mitigation discussed, will be developed with cryo and solenoid design. Primary Beam Shielding Mu2e Working Group May 19,

Other L2 Management Docs Mu2e Working Group May 19, Preliminary Risk Registry WBS Integral Project Team

Costs Costs appear to be moving in upwards direction from the May 2009 PDR. Mu2e Working Group May 19,

Cost Breakdown Mu2e Working Group May 19,

Issues Buildings “Architectural Significance” Road Patterns Beam Shutdown Construction Mu2e Working Group May 19, “if we produced a dowdy site with shabby buildings, then the technical people we wanted to work with us would not come and the statesmen, who might judge us in part by appearances, would not, in the long run, give us the funds we would need for our physics.” “Starting Fermilab”, Robert Rathbun Wilson, 1992

Summary A concept for the design of the Detector Hall has been developed. The type of construction is typical at Fermilab. Low to medium risks are anticipated. No known significant environmental risks. Project Team providing requirements and feedback on overall design; system specific criteria development needed. Mu2e Working Group May 19,

Thank you for your attention. Questions? Mu2e Working Group May 19,