Report from GIFS-TIGGE working group Richard Swinbank, and Young-Youn Park, with thanks to the GIFS-TIGGE working group, THORPEX IPO and other colleagues.

Slides:



Advertisements
Similar presentations
RSMC La Réunion activities regarding SWFDP Southern Africa Matthieu Plu (Météo-France, La Réunion), Philippe Arbogast (Météo-France, Toulouse), Nicole.
Advertisements

GEO Work Plan Symposium – 6 May 2011 Plenary Session.
© GEO Secretariat THORPEX-TIGGE Overall Concept What? –TIGGE: THORPEX will develop, demonstrate and evaluate a multi- model, multi-analysis and multi national.
Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
Sub-seasonal to seasonal prediction David Anderson.
The THORPEX Interactive Grand Global Ensemble (TIGGE) Richard Swinbank, Zoltan Toth and Philippe Bougeault, with thanks to the GIFS-TIGGE working group.
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
Slides for GIFS-TIGGE WG meeting Richard Swinbank.
Slide 1 TECO on the WIS, Seoul, 6-8 November 2006 Slide 1 TECO on the WIS: Stakeholder Session THORPEX and TIGGE Walter Zwieflhofer ECMWF.
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
Heavy Precipitation at the Alpine South Side and Saharan Dust over Central Europe: A Predictability Study using TIGGE Lars Wiegand, Arwen Twitchett, Conny.
On-going WMO Demonstration Projects related to EXPO2010 Multi Hazard Early Warning System Multi Hazard Early Warning System Leading by SMB/CMALeading by.
GEO Work Plan Symposium 2014 WE-01 Jim Caughey THORPEX IPO.
EGU 2011 TIGGE, TIGGE LAM and the GIFS T. Paccagnella (1), D. Richardson (2), D. Schuster(3), R. Swinbank (4), Z. Toth (3), S.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
1 Joint Working Group Forecast Verification Research  Beth Ebert (BOM, Australia) co-chair  Laurie Wilson (CMC, Canada) co-chair Barb Brown (NCAR, USA)
Slide 1 GIFS-TIGGE 31 August - 2 September 2011 TIGGE at ECMWF David Richardson, Head, Meteorological Operations Section Slide.
Munehiko Yamaguchi 1 21 August 2014 (Thu.) Multi-model ensemble forecasts of tropical cyclones using TIGGE World Weather Open Science Conference Montreal,
Current status of development of TIGGE products and support to SWFDP KYOUDA Masayuki 1, YAMAGUCHI Munehiko 2, and MATSUEDA Mio 3 1: Japan Meteorological.
1 Buizza et al: TIGGE (SRNWP WS, Bologna, 7-8 April 2005) TIGGE (The THORPEX Interactive Grand Global Ensemble) Roberto Buizza 1, Philippe Bougeault 1,
How can LAMEPS * help you to make a better forecast for extreme weather Henrik Feddersen, DMI * LAMEPS =Limited-Area Model Ensemble Prediction.
Slide 1 TIGGE phase1: Experience with exchanging large amount of NWP data in near real-time Baudouin Raoult Data and Services Section ECMWF.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
Celeste Saulo and Juan Ruiz CIMA (CONICET/UBA) – DCAO (FCEN –UBA)
Research Results from TIGGE and a Vision for a New Paradigm for Global Prediction David Parsons Chief, World Weather Research Division (WWRD)
Page 1© Crown copyright 2006 Matt Huddleston With thanks to: Frederic Vitart (ECMWF), Ruth McDonald & Met Office Seasonal forecasting team 14 th March.
© Crown copyright Met Office Probabilistic turbulence forecasts from ensemble models and verification Philip Gill and Piers Buchanan NCAR Aviation Turbulence.
Linkage between the research community and operational center - case examples - First meeting of the WWRP PDEF working group Karlsruhe, Germany May,
TIGGE and operational EPS 経田 正幸 KYOUDA Masayuki Numerical Prediction Division, Japan Meteorological Agency 9 th THORPEX GIFS-TIGGE Working Group meeting.
The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,
The THORPEX Interactive Global Ensemble (TIGGE) and development of a future Global Interactive Forecast System (GIFS) GIFS-TIGGE WG report for WWRP JSC4.
Report from GIFS-TIGGE working group Richard Swinbank, and Zoltan Toth, with thanks to the GIFS-TIGGE working group, THORPEX IPO and other colleagues Presentation.
Application of Numerical Weather Prediction Prognoses to Operational Weather Forecasting in Hong Kong Pre-CAS Technical Conference on "Environmental Prediction.
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
EurEPS The Realization of an Operational LAM-EPS in Europe A SRNWP Project under EUMETNET Proposed to the EUMETNET Council at its 30 th meeting by Norwegian.
GEO - Weather Ocean Water Proposed Weather SBA and cross-linking work packages.
On the Relative Benefits of Multi-Center Grand Ensemble for Tropical Cyclone Track Prediction in the Western North Pacific 2 Nov 2012 (Fri) The Fourth.
GIFS-FDP Introduction to Framework Plan and links with SWFDP Richard Swinbank & Zoltan Toth.
Slide 1 GO-ESSP Paris. June 2007 Slide 1 (TIGGE and) the EU Funded BRIDGE project Baudouin Raoult Head of Data and Services Section ECMWF.
DAOS WG 5 th Meeting University of Wisconsin, Madison Sept Items 2.1 and 2.2 Jim Caughey THORPEX IPO.
Slide 1 Thorpex ICSC12 and WWRP SSC7 18 Nov The Sub-seasonal to Seasonal (S2S) Prediction Project 1 “Bridging the gap between weather and climate”
Exploring Multi-Model Ensemble Performance in Extratropical Cyclones over Eastern North America and the Western Atlantic Ocean Nathan Korfe and Brian A.
Verification of ensemble precipitation forecasts using the TIGGE dataset Laurence J. Wilson Environment Canada Anna Ghelli ECMWF GIFS-TIGGE Meeting, Feb.
TIGGE Archive Access at NCAR Steven Worley Doug Schuster Dave Stepaniak Hannah Wilcox.
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
A study on the spread/error relationship of the COSMO-LEPS ensemble Purpose of the work  The spread-error spatial relationship is good, especially after.
THORPEX THORPEX (THeObserving system Research and Predictability Experiment) was established in 2003 by the Fourteenth World Meteorological Congress. THORPEX.
NCEP CMC ECMWF MEAN ANA BRIAN A COLLE MINGHUA ZHENG │ EDMUND K. CHANG Applying Fuzzy Clustering Analysis to Assess Uncertainty and Ensemble System Performance.
Munehiko Yamaguchi 12, Takuya Komori 1, Takemasa Miyoshi 13, Masashi Nagata 1 and Tetsuo Nakazawa 4 ( ) 1.Numerical Prediction.
Figures from “The ECMWF Ensemble Prediction System”
TIGGE-LAM archive development in the frame of GEOWOW Richard Mladek, Manuel Fuentes (ECMWF)
Uncertainty cones deduced from an ensemble prediction system
S2S sub-project on verification (and products)
Use of TIGGE Data: Cyclone NARGIS
Severe Weather Forecasting Demonstration Project (SWFDP) Bay of Bengal
Jennifer Boehnert Emily Riddle Tom Hopson
Verification of multi-model ensemble forecasts using the TIGGE dataset
Studies on Tropical Cyclone Forecasting using TIGGE
Links with GEO.
Motivation Investigation of predictability using ensemble forecasts
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Science Objectives contained in three categories
Report from GIFS-TIGGE working group
Ensemble tropical cyclone and windstorm forecast applications
SWFDP Key Issues for GIFS-TIGGE
GEOWOW update Richard Swinbank GIFS-TIGGE meeting March 2014
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team
Verification of Tropical Cyclone Forecasts
MOGREPS developments and TIGGE
Met Office contribution to GIFS-TIGGE / SWFDP collaboration
Presentation transcript:

Report from GIFS-TIGGE working group Richard Swinbank, and Young-Youn Park, with thanks to the GIFS-TIGGE working group, THORPEX IPO and other colleagues Presentation for WWRP/JSC5, April 2012

TIGGE and GIFS  Working Group  TIGGE  TIGGE archive status  TIGGE research  GIFS developments  Examples of products based on TIGGE data  Building links with SWFDP

GIFS-TIGGE working group  Co-chairs:  Richard Swinbank (Met Office, UK)  Young-Youn Park (KMA, Korea) Italics indicate changes in past year  Other members:  Mike Naughton (BOM, Australia)  Osvaldo Moraes (CPTEC, Brazil)  Laurie Wilson (EC, Canada)  Gong Jiandong (CMA, China)  David Richardson (ECMWF, Europe)  Philippe Arbogast (Météo- France, France)  Tiziana Paccagnella (ARPA-SIM, Italy)  Masayuki Kyouda (JMA, Japan)  Doug Schuster (NCAR, USA)  Yuejian Zhu (NOAA/NCEP, USA)

TIGGE project  Since 2006, TIGGE has been collecting ensemble predictions from 10 of the leading global forecast centres.  TIGGE data are made available after a 48-hour delay, to support research on probabilistic forecasting methods, predictability and dynamical processes.  50+ TIGGE articles published in scientific literature.

TIGGE Archive Usage NB. Now includes statistics from CMA

TIGGE Research Following the successful establishment of the TIGGE dataset, the main focus of the GIFS-TIGGE working group has shifted towards research on ensemble forecasting. Particular topics of interest include:  a posteriori calibration of ensemble forecasts (bias correction, downscaling, etc.);  combination of ensembles produced by multiple models;  research on and development of probabilistic forecast products. TIGGE data is also invaluable as a resource for a wide range of research projects, for example: comparing different Ensemble prediction systems; research on dynamical processes and predictability. Currently, over 50 articles related to TIGGE have been published in the scientific literature.

Verification result of TC strike probability -1- Strike prob. is computed at every 1 deg. over the responsibility area of RSMC Tokyo - Typhoon Center (0 ∘ -60 ∘ N, 100 ∘ E-180 ∘ ) based on the same definition as Van der Grijn (2002). Then the reliability of the probabilistic forecasts is verified. Reliability Diagram -Verification for ECMWF EPS- In an ideal system, the red line is equal to a line with a slope of 1 (black dot line). The number of samples (grid points) predicting the event is shown by dashed blue boxes, and the number of samples that the event actually happened is shown by dashed green boxes, corresponding to y axis on the right. Thanks to Munehiko Yamaguchi, MRI/JMA

Verification result of TC strike probability -2- All SMEs are over-confident (forecasted probability is larger than observed frequency), especially in the high-probability range.

Best SME (ECMWF) MCGE-3 (ECMWF+JMA+UKMO) MCGE-6 (CMA+CMC+ECMWF+JMA+NCEP+UKMO) MCGE-9 (All 9 SMEs) Benefit of Multi-model Grand Ensemble MCGEs reduce the missing area! The area is reduced by about 1/10 compared with the best SME. Thus the MCGEs would be more beneficial than the SMEs for those who need to avert missing TCs and/or assume the worst-case scenario.

Verification of ensemble spread Verification at 3 day predictions x axis: ensemble spread y axis: position error of ensemble mean track prediction Verification at 3 day predictions x axis: ensemble spread y axis: position error of ensemble mean track prediction

Verification of confidence information Position errors (km) of 1 to 5 day ensemble mean TC track predictions with small (blue), medium (orange) and large (red) ensemble spread. Each color has five filled bars, corresponding to the position errors of 1 to 5 day predictions from left to right. If a SME is successful in extracting the TC track confidence information, the average position error of small-spread cases is smaller than that of medium- spread cases, and in turn smaller than the average position error of large- spread cases. The frequency of each category is set to 40%, 40% and 20%, respectively (Yamaguchi et al. 2009).

Differences in Uncertainty – Standard devation of 500 hPa gph Sample case: Fcst during ET of Hurricane Ike, initialized 10 Sep 2008, 12 UTC Time gpm Surface position of Ike in membersAnalysis position of Ike at ET time longitude Characteristics of TIGGE in forecasting ET events - explore the benefit of multi-model approach longitude Courtesy Julia Keller TIGGE (8 EPSs)

TIGGE TIGGE - ECMWFECMWF gpm longitude Fcst during ET of Hurricane Ike, EOFs at 15 Sep 2008, 12 UTC (+120h) Ensemble mean (color) and EOF pattern (contours) of 500 hPa geopotential height Ike best track Regions Of Variability: EOFs latitude Julia Keller

Different contribution to EOF distribution Distinct partitioning in clusters (development scenarios) Clustering result for sample case Ike: 6 different clusters (colours) Australia and Brazil contribute to one or two scenarios Japan and ECMWF contribute to five of the six scenarios Contributions of EPS to Clusters Main conclusions TIGGE contains broader variations and thus offers more possible development scenarios during ET than ECMWF ECMWF is necessary to obtain full scope of variations

4 th August Moscow Wildfires brought heavy smog 1,600 drowning deaths! Moscow New maximum record of 39 ℃ ! The heatwave killed at least 15,000 people, and brought wildfires, smog-induced health injury, and huge economic loss. Mio Matsueda (2011, GRL) Predictability of the 2010 Russian blocking

Ensemble-based occurrence probability of blocking (JJA 2010) Blocking in early August, especially western part of blocking, showed a lower predictability than the other blockings. This indicates a difficulty in simulating maintenance and decay of blocking.

Towards a Global Interactive Forecast System (GIFS)  Our objective is to realise the benefits of THORPEX research by developing and evaluating probabilistic products.  Focus on risks of high-impact weather events – unlikely but potentially catastrophic.  First step: exchange of real-time tropical cyclone predictions using “Cyclone XML” format.  Followed by development of products based on gridded forecasts of heavy precipitation & strong wind. Piers Buchanan, Met Office

Flash floods/snow in South Africa (June 2011) + 8-day forecast Mio Matsueda

Steps to progress use of GIFS products in SWFDP  Progress so far  TC products based on CXML data; prototype products based on gridded TIGGE forecast data  Provided documentation of prototype products  GIFS-TIGGE WG co-chair attended recent SWFDP SG meeting  Seek feedback from RSMCs coordinating SWFDP regional subprojects  Future  Develop real-time products for SWFDP based on preferred prototypes, e.g., Multi-model versions of TC products; near real-time versions of highest priority rainfall products.  Supply products to SWFDP regional websites  Provide training via SWFDP

GIFS-TIGGE 31 August - 2 September 2011  GEOWOW (GEOSS interoperability for Weather, Ocean and Water) is a 3-year EU-funded FP7 project starting September  The Weather component includes:  improving access to TIGGE data at ECMWF.  developing and demonstrating forecast products.  Weather participants: ECMWF, Met Office, Météo-France, KIT  Involve other TIGGE partners in planning development & demonstration of products in conjunction with SWFDP.

TIGGE Research needs & priorities  So far, focus has been on downstream application of ensembles, rather than on improving EPSs. But other important areas for EPSs include  Initial conditions – link with ensemble data assimilation (DAOS)  Representing model error – stochastic physics (PDP, WGNE)  Verification of ensemble forecasts (JWGFVR)  Seamless forecasting – links with sub-seasonal forecasting (new project)  Convective-scale ensembles (TIGGE-LAM, MWFR)  These areas, particularly first two, are important for improving EPS skill and products.  TIGGE is an invaluable resource for comparing both EPS techniques and systematic model errors, worthy of continuation into the future.

TIGGE development Calibration, combination, products EPS improvement Time Evolution of TIGGE & GIFS  We propose that the GIFS-TIGGE should also be a forum to focus on R&D directed at improving our EPS systems, to help us develop a “virtuous circle”.  We will have a section of future WG meetings for discussing ensemble initial conditions, stochastic physics & other aspects of improving our EPSs.  We will also maintain an interest in ensemble verification and links with convective-scale EPS and the new sub-seasonal to seasonal group.

Summary  Since October 2006, the TIGGE archive has been accumulating regular ensemble forecasts from leading global NWP centres.  The TIGGE data set has been used for a wide range of scientific research studies (some examples shown).  Various products have been developed to use the tropical cyclone forecast data exchanged using CXML, and, more recently, prototype gridded products from the TIGGE data set.  The SWFDP regional centres will assess the prototype GIFS products for possible inclusion as real-time products on the SWFDP websites, and we will collaborate with them on implementation & evaluation. TIGGE website: