ATLAS and CERN/ST 2nd April 2003 Marzio Nessi. 02/04/2003 Today ATLAS project Detector Components Construction Detector Integration and Installation ATLAS.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
1 st International Conference "Discoveries of Higgs and Supersymmetry to Pioneer Particle Physics in the 21st Century" Concluding Remarks (LHC Status)
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Design Office meeting Design office meeting.
RF Cavity / Coupling Coil Module
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Michael Barnett July 2002 Large International Collaborations The ATLAS Experiment under construction at the Large Hadron Collider at the CERN lab in Geneva,
Construction and Installation of the CLIC Experimental Area
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Recirculation Concept - Cyclotron Radio frequency alternating voltage Hollow metal drift tubes time t =0 time t =½ RF period D-shaped.
1 GLD Surface Assembly Y. Sugimoto KEK
CD meeting R.Yamada1 Thoughts on 4CD (4 th Concept Detector) Solenoid System based on Alex Mikhailchenko’s Basic Design Ryuji Yamada October 20,
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Technical Support Activities in PH-ADO-PO
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
Managing the LHC Experimental Area Point 5, CMS: Martin Gastal (PH/CME) Point 1, ATLAS: François Butin (TS/LEA) Point 2, Alice: Sebastien Evrard (TS/LEA)
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
ATLAS micromegas activities (MAMMA)
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Short summary of ATLAS week. Really a lot has happened since the last ATLAS Plenary in Paris! Giant steps in the detector hardware construction, assembly,
ATLAS Plenary, Feb. 18th, 05Commissioning1 Report on the commissioning activities G. Mornacchi, P. Perrodo and Sub-Systems Collaborators.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Common Projects Status
CSP 25th November 2010 Technical agreement number 3: overview
LHC Experimental Vacuum Systems Status October ‘07
Update of experimental hall in Japanese mountain site
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Technical Support Activities in PH-ADO-PO
Installation plans from mid 2005
L H C A T L A S International Collaboration on the LHC Project
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

ATLAS and CERN/ST 2nd April 2003 Marzio Nessi

02/04/2003 Today ATLAS project Detector Components Construction Detector Integration and Installation ATLAS Detector Deliverables Common Projects Large Systems Surface Assembly Underground Assembly Started in 1996 Well over 50% of all major components constructed Some sub-detectors (like calorimeters) almost finished Mid 2004 most of the components will be available Construction schedule with 4 months installation float Started in 2002 Calorimeters preassembly on surface well advanced Toroids integration at CERN advanced but critical Area infrastructure on surface well advanced Underground installation (USA15) started

02/04/2003 ATLAS Project Schedule Detector Components ConstructionLarge Systems Integration on Surface Underground Assembly USA15UX15 commissioning

02/04/2003 Large Systems Preassembly Today at CERN (bldg 180, 185, 175, 191,…) we are assembling on the surface: LAr Calorimeters (1 Barrel + 2 Endcaps) Tile Calorimeters (1 Barrel + 2 Ext. Barrels) Barrel Toroid individual Coils (8) Barrel Toroid Endcaps (2) Mechanical integration Cryogenics integration Electrical integration Functional tests During 2003 at CERN (bldg BB5, SR1, 157,…) we will start the assembling and integration work for:  Muon Spectrometer (Barrel and Endcaps)  Inner Detectors (3) Work mostly done with Collaboration Manpower (eng, phys and tecs) + CERN services (ST/HM, EST/SU, LHC/ECR,…)

02/04/2003 First half EM Barrel Calorimeter Cylinder insertion : Bldg 180 LAr EM half barrel in front of the cryostat LAr EM half barrel after insertion into the cryostat

02/04/2003 LAr hadronic end-cap calorimeters : Bldg. 180 The LAr hadronic end-cap series production is completed, all 134 modules (including 6 spares) have been stacked 3 out of the 4 wheels are now pre-assembled and ready for insertion into the cryostat Insertion into the cryostat awaits the assembly of the first EM wheel (which has to enter first) Assembly of the first HEC wheel (horizontal) Assembled wheel in insertion stand (vertical)

02/04/2003 Tile Calorimeter pre-assembly: Bldg. 185 Regular survey measurements are taken to compare actual and expected deformations during assembly of the cylinders Pre-assembly of the first Extended Barrel, expected to be complete by end of April 2004

02/04/2003 Central Solenoid: Bldg. 180 Solenoid field: 2T with a stored energy of 38 MJ The solenoid is fully tested, and ready at CERN for integration into the common cryostat with the LAr barrel EM calorimeter by the end of 2003 Cryogenics chimney tested in summer 2002

02/04/2003 Barrel Toroid Integration 1: Bldg 180 Cold mass #3 to be impregnated next coil (#4) in preparation  2 cold masses ready  cold mass #3,4 in preparation  On schedule

02/04/2003 Barrel Toroid Integration 2 : Bldg 180 Cooling pipes inst.,Tie- rods, instrumentation : ongoing coil 1&2 Cryostats preparation : just started Cryostat welding : scheduled Heat shields, insulation installation : waiting for material Cooling and B-tests : first time: July 03-Sep03 Major problems of quality of cooling pipe welding just solved 3 months delay in the delivery of first Heat Shields -> remains very critical, today just in time for installation

02/04/2003 Encap Toroids : HMA (NL) cold mass fabrication : Pancake windings 8 of 16 done First coil impregnated Web structures manufacturing 60% done The first of the two cold masses is expected to be delivered to CERN in October 2003, ahead of schedule

02/04/2003 Endcap Toroids integration: Bldg 191 Heat shields Installation of the super-insulation The two vacuum vessels have been completed, delivered to CERN, and vacuum tested They are being prepared to receive the cold masses

02/04/2003 Production Concerns Technical problems  See WWW top-worries list: Barrel toroid integration and coil tests (Heat shields,..) DMILL chips technology (6 types still in production) TRT on detector electronics boards (Webs, barrel PCBs) Production start-up of forward SCT modules TRT gas system TRT wheel assembly (schedule and resources) RPC chambers production Beam pipe activation Cables need timely procurement

02/04/2003 Schedule Concerns (components production) Production Schedule difficulties (with respect to ready for installation milestones = 4 months installation float) Following system are using part of the 4-month float - ID Barrel: 1.5 months (SCT 1.5 m, TRT 1m) - ID Endcap C: 2.0 months (SCT) - ID Endcap A:4.0 months (SCT&TRT) - LAr Barrel:2.0 months - LAr Endcap C:1.5 months - LAr Endcap A:1.0 month - Barrel Toroid:4.0 months (last 2 coils) Corrective actions to restore some of the installation time contingency will be investigated during summer 2003, when the entire production chain is fully understood!

02/04/2003 ATLAS

02/04/2003 Installation Constraints Starting mid April 2003, ST/CE will deliver an empty cavern for the ATLAS Detector: UX15. For cost reasons in 1995 it was decided to have 2 access shafts instead of a very large one: PX14 (diameter 18m) and PX16 (diameter 12.6m). ATLAS will be lowered piece-by-piece and assembled 92 m underground during 3.5 years. The maximal weight allowed by the single surface crane is 280 tons. Underground we will have two 65- ton cranes. For cost reasons the surface building SX1 has been kept minimal, with just sufficient space to receive and lower down material. All necessary components will have to be delivered to POINT 1 in a “just-in-time” fashion. Space will always be a critical issue.

02/04/2003 Installation in Phases 6 phases:- Infrastructure - Barrel Toroid + Barrel Calorimeters - Barrel Muon Chambers + Endcap Calorimeters - Inner Detectors + Muon Big Wheels - Endcap Toroids + Muon Small Wheels - Vacuum pipe, shieldings, closing For each phase:  Clear mandate and goals  Work organized in Work Packages (WP)  Functional tests as early as possible Schedule strategy : vacuum pipe and detector closed by …..… Dec 2006 Apr 03 Aug 06 Installation in 6 phases Global commissioning PIT delivery

02/04/2003 Installation Schedule v Aug ‘06

02/04/2003 Installation Considerations  Complex installation sequence and assembly of many sub-components underground  logistical, safety, conflicts … issues.  The Air-Core Toroid concept implies a major interference of components, access and services in a very large volume and inside the detector. Our strategy:  Correct configuration control: we created in 2001 a central office; with it many problems have been solved while a few items remain to be worked out.  A work coordination organization at POINT 1: ATLAS EXPERIMENTAL AREA MANAGEMENT (EAM)  A complete planning of all tasks, with high granularity: This is done through a central TCn office. Today we have ~ 2000 individual tasks.

02/04/2003 POINT 1 SX1 PX14PX16 PX15 UX15 USA15

02/04/2003 Installation Organization ATLAS TCn (in consultation with ST, EST and EP leadership) takes responsible for the proper coordination of the installation and commissioning of the detector and its services underground. The installation work is organized in Work Packages (WP’s). The technical responsibility for each WP is with the experts for the system which is being installed (for the detector and for the infrastructure). The resources associated to a given WP are defined case-by-case and are a mixture between subcontractors work, technical sector experts, central TCn resources and specific Institute resources. The exact sharing has been agreed upon with the various groups. The interplay between WPs and basic services is managed by a dedicated organization which takes care of the overall work organization at POINT 1: Experimental AREA Management (EAM) Active since October ’02….working well

02/04/2003 EAM Organization at Point 1 WP i Contractors manpower ST/EST experts WP i+1 ATLAS common resources Institute resources EAM logistics survey team safety planning & control cranes and riggers WP i+3 WP i+2 WP i+n

02/04/2003 ATLAS EAM Installation Organization  Work site installation consists in organizing a succession and cohabitation of more than 1900 Tasks, spread over 3.5 years  The organization on site of WP’s is coordinated by EAM (Experimental Area Management), a team of 11 persons ( from ST/EST/ EP) since Oct 2002  Weekly EAM meeting with EAM team and work conductors (minutes on nutes/eam_minutes_index.html) nutes/eam_minutes_index.html  About 50 WP’s have already been processed, a WP becomes active 2 months before it starts.  The status of active WP’s can be monitored on EDMS doc on

02/04/2003 USA15 instrumentation Metallic structures well advanced Service pipes installed Installation of cable trays waiting for installation Electronic racks ordered

02/04/2003 UX15 Cavern final delivery April ’03 first step TAS shielding + washers …. then infrastructure November ’03 start with detector installation

02/04/2003 UX15 Infrastructure installation

02/04/2003 Infrastructure Installation Very critical, starting now…detector installation needs most of the infrastructure in place Most of the work is done within CERN contracts, under the supervision of ST, EST and LHC/ECR In these weeks we are reviewing with our technical sector colleagues the installation methods and the readiness in order to avoid surprises It will be very difficult to absorb delays, the only possible solution will be extra shifts and more parallel work

02/04/2003 Infrastructure Installation ST/CE - TAS shielding washers installation ST/HM- all transports (normal and special), all crane manipulations. - all cranes/lifts installation EST/IC - most metallic structures ST/CV- HVAC systems - primary cooling systems and piping - detector cooling units - compress air system - detector piping work? EST/SU- all survey work LHC/ECR- magnets and LAr cryogenics (with EP/TA3)

02/04/2003 ST/CV HVAC work in UX15

02/04/2003 Infrastructure Installation ST/MA- safety detection systems - access structures - detector sniffer system EST/ISS- equipment database LHC/VAC - beam vacuum system EP/TA1- gas distribution systems EP/TA3 - magnets control system ST/EL - electric power distribution (incl UPSs) - detector cabling ? All this work is (will be) covered by internal agreements between ATLAS and the various groups/divisions

02/04/2003 Detector Cabling One of the biggest challenges in front of us Little or no expertise left at CERN for detector cabling ~ 2200 km of copper and fibers cables We are interested in the ST/EL methods We will be limited by resources (few CHF/m available) Surface bundling as one possible strategy Complex routing inside the detector We are currently finalizing the cable trays layout and the racks layout (inside and outside the detector) We have developed interactive tools for routing optimization

02/04/2003 Detector Cable Trays

02/04/2003 AVI test

02/04/2003 Installation sequence (Barrel Toroid + Barrel Calorimeter) August ‘04

02/04/2003 Installation sequence December ‘04 Side C : End Cap calorimeter installation Side A : Barrel muon chambers installation

02/04/2003 Installation sequence September ‘05 Side C : Barrel Inner Detector installation Side A : Forward muon chambers installation (Big Wheels)

02/04/2003 Installation sequence (End Cap Toroid C) December ‘05

02/04/2003 Installation sequence (Pixel detector + Be pipe) April ‘06

02/04/2003 Installation sequence (Small Wheel C) May ‘06

02/04/2003 Installation sequence (Forward Shielding C) July ‘06

02/04/2003 Summary ATLAS detector construction is well advanced and tuned to the installation schedule As much as possible all components will be assembled and tested on the surface. This work is well visible at CERN today Underground installation is starting. It is complex & time critical The management structures for it are in place and working CERN/ST is strongly committed to the infrastructure installation. Next 8 months will be very demanding. ATLAS has many intersection points with CERN/ST. Few more projects could still be finalized (piping, cabling,..)