Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact

Slides:



Advertisements
Similar presentations
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
Advertisements

إدارة المشروعات Projects Management
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
CRYOGENICS AND POWERING
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Detector Cooling Project Thermosiphon Project Status Report
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
RP PROCEDURE FOR FLUID ANALYSIS Detector Cooling Project - 16 th June 2011 Heinz Vincke, Nadine Conan DGS/RP..... based on EDMS document # prepared.
EN/CV/DC Fluid analyses and Radiation Protection monitoring Presentation done by Elena Perez Rodriguez For further information contact
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
MICE hydrogen review Approval process. Process Working group Document pack PPD Director & ISIS Director Prerequisite testing Completed action list Approval.
د. باسم ممدوح الحلوانى Lecture 3 Scope Management.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Cooling System Solutions
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
60kW Thermosiphon control system
EN/CV/DC IT-3673 Presentation done by Elena Perez Rodriguez For further information contact For the purchase of cooling fluids.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Michele Battistin Elena Perez Rodriguez 10 November 2010
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
1 ESS Cryogenic regulation loops proposal  Thermal shield  Power Couplers double-wall  CM cool down  Stand by and nominal operation  CM warm up Bertrand.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
D. GiugniThermosiphon Review, Oct 1st 091 Risk assessment for the thermosiphon cooling test system D. Giugni Thermosiphon Review, Oct1 st 2009.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Operation of cryogenics for LHC detectors: what did we learn? European Cryogenics days U. Wagner, CERN.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
Crab Cavity Technical Coordination meeting:
Demineralised water cooling system
He Plant, LN2 Systems and Commissioing
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
SPS cryogenic proximity equipment and SM18 validation
Tracker cooling loop “check out” draft for discussion
Update on HW commissioning
M. Battistin CERN EN/CV/DC 9th July 2009
Bidder’s conference – 21st May 2013
ATLAS Thermosiphon Electrical Distribution and Run Modes
Low temperature chiller Market Survey
Traceability of Gas Pipeline Materials Research & Materials Manager
Documentation Chris Scanlon and Ritendra Bhattacharya
Presentation transcript:

Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact

Index Quality management ◦ EVM Project management ◦ Documentation Construction and commissioning procedure Test for concept validation procedure 1/10/2009Thermosiphon project2 EN/CV/DC

QUALITY MANAGEMENT EN/CV/DC 1/10/20093Thermosiphon project

EVM Project management This project will follow the Earned Value Management (EVM) technique EN/CV/DC Conceptual design report Definition Project breakdown structure Equipment coding convention PBS Work breakdown structure List of working units WBS & WU’s Resource responsibility matrix RRM Work units dictionary WUD Planning Project coordination schedule 1/10/20094Thermosiphon project

Documents in progress Sharing working documents ◦ Workspace ◦ Includes announcements and useful links Open read access In case of access problems contact EN/CV/DC 1/10/20095Thermosiphon project

Long term documentation Publishing definitive documents ◦ EDMS folder for the thermosiphon project CERN v.0 EN/CV/DC Main quality documents ◦ Naming convention EDMS ◦ Construction and testing procedure EDMS ◦ Test for concept validation procedure EDMS ◦ Risk analysis EDMS ◦ Reports, as subdocuments of the procedures ◦ Users manual and technical documentation 1/10/20096Thermosiphon project

CONSTRUCTION AND COMMISSIONING PROCEDURE EN/CV/DC 1/10/20097Thermosiphon project

Objective: guide for the purchase, construction and commission phases of the project Construction main points ◦ Materials inox ◦ Connections  Welds 100 % x-ray  Flanges ISO-CF  Connections VCR ◦ Leak-tightness standard Cryogenics standard ◦ Cleaning standard Construction and commissioning procedure EN/CV/DC 1/10/20098Thermosiphon project

Commissioning main points ◦ Pressure test According to SR-M and GSI-M2 ◦ Leak checking test  Operational specification 1% of mass/year  Pressure decay method  Overpressure method for local leaks detection ◦ Reports ◦ Mapping and electrical test ◦ Conditioning Construction and commissioning procedure EN/CV/DC 1/10/20099Thermosiphon project

TEST FOR CONCEPT VALIDATION PROCEDURE EN/CV/DC 1/10/200910Thermosiphon project

General concept Objective : describe the test to be done after the installation is operational. Gain knowledge of the Thermosiphon systems For both 191 and PX15 installations Is NOT a commissioning procedure is a guide to what should be studied in the thermosiphon 1/10/200911Thermosiphon project

Working conditions Status ◦ Warm stop ◦ Cold stop ◦ Stand-by ◦ Run Operations ◦ Filling ◦ Start-up from warm stop ◦ Start-up from cold stop ◦ Cool down ◦ Liquid recovery ◦ Degassing 1/10/200912Thermosiphon project

Mini thermosiphon The tests will be focused in nominal operation to gain a general working knowledge of the thermosiphon systems The control of the mini-thermosiphon is more difficult that the control of the thermosiphon in PX15 Tests to be done ◦ Test 01: Start-up from warm stop, procedure 1 ◦ Test 02: Start-up from cold stop ◦ Test 03: Liquid recovery ◦ Test 04: Start-up from warm stop, procedure 2 ◦ Test 05: Short run EN/CV/DC 1/10/200913Thermosiphon project

Thermosiphon: operation The tests will be divided in 3 groups ◦ Nominal operation ◦ Performance ◦ Failure modes Nominal operation test: like in the mini-thermosiphon ◦ Test 20: Start-up from warm stop, procedure 1 ◦ Test 21: Start-up from cold stop ◦ Test 22: Liquid recovery ◦ Test 23: Start-up from warm stop, procedure 2 EN/CV/DC 1/10/200914Thermosiphon project

Thermosiphon: performance and regulation Are based on the regulation loops and aim to describe the relationship between them and the performance of the station Performance and regulation tests ◦ Test 30: Heater regulation in the test section ◦ Test 31: Evaporator performance in the by-pass ◦ Test 32: By-pass regulation and flow control in the loop ◦ Test 33: Temperature control in the loop ◦ Test 34: Short run ◦ Test 35: Long run EN/CV/DC 1/10/200915Thermosiphon project

Thermosiphon: failures Objective: produce a controlled failure to understand the reaction of the safety system and modify it if necessary Failure modes ◦ Test 40: Effect of the leaks and degassing procedure ◦ Test 41: Power cut ◦ Test 42: Mixed water cut ◦ Test 43: Chiller break down ◦ Test 44: Instrumentation failure ◦ Test 45 and more EN/CV/DC Risk analysis 1/10/200916Thermosiphon project

Conclusions An important part of this project is quality management There is a mayor change between the usual refrigeration standard and the cryogenics/vacuum standard that will be used in this project Once the thermosiphon is built it will be used to test all the nominal conditions as well as failure conditions to assess its suitability for the ATLAS ID evaporative system. 1/10/2009Thermosiphon project17 EN/CV/DC

Thank you for your attention Any questions ?