1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP-166005, Program “Leonardo da Vinci”

Slides:



Advertisements
Similar presentations
Albania Good practices and Gaps 13 December 2013.
Advertisements

IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Visaginas, 2008 INPP Decommissioning Strategy, Programme, Licensing.
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
MODULE “PROJECT MANAGEMENT AND CONTROL” PHYSICAL PROTECTION AND SAFEGUARDS SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Contractor Management and ISO 14001:2004
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Regulatory Body MODIFIED Day 8 – Lecture 3.
MODULE “STRATEGY DEVELOPMENT”
1 ESTABLISHMENT OF REQUIREMENTS Module ”International requirements” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
IAEA International Atomic Energy Agency SAFETY REQUIREMENTS FOR PREDISPOSAL MANAGEMENT OF RADIOACTIVE WASTE Luc Baekelandt Safety.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
1 NEED IN INTEGRAL APPROACH  Strategy and Politics in Decommissioning  Institutional and Legal aspects  Regulatory aspects  Economic aspects  Socio-Economic.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
1 ESTABLISHMENT OF REQUIREMENTS Module: “DEVELOPMENT OF ORGANISATIONAL STRATEGY AND REGULATORY STRATEGY” Project BG/04/B/F/PP , Program “Leonardo.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
MODULE “PROJECT MANAGEMENT AND CONTROL” QUALITY ASSURANCE SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 ESTABLISHMENT OF REQUIREMENTS Module “National legislation and licensing” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
56th Regular Session of the IAEA General Conference
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
MODULE “PROJECT MANAGEMENT AND CONTROL” STAFFING AND TRAINING
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
International Atomic Energy Agency School for Drafting Regulations on Radiation Safety RER/9/096 Vienna, 3 May, 2010 Adriana Nicic, Regulatory Activities.
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 Rules and responsibilities of the licensee Jiří Veselý, SONS, Czech republic.
RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety TCEU School of Drafting Regulations November.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
IAEA International Atomic Energy Agency 32. Closure of R2D2 Project Summary of the National Progress Reports Vladan Ljubenov Mika Shimba-Yamada Division.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
International Atomic Energy Agency FUNDAMENTAL SAFETY PRINCIPLES AND ROLES OF ORGANIZATIONS IN THE DEVELOPMENT OF DISPOSAL FACILITIES Daniela E. Alvarez,
Radiation Safety Regulations Part VIII: Management requirements and other requirements.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
International Atomic Energy Agency V. Nys Definition and practical application of demonstration of operational and long-term safety for predisposal RWM.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
1.9. Safety assessment “School for Drafting Regulations on Radiation Safety, IAEA - Module 1 Regulatory framework for safety, authorization and inspection.
Nuclear decommissioning: Turning waste into Wealth
BASIC PROFESSIONAL TRAINING COURSE Module XVIII Decommissioning
BASIC PROFESSIONAL TRAINING COURSE Module XVIII Decommissioning
IAEA Safety Guidance on Licensing and Oversight Activities
Communication and Consultation with Interested Parties by the RB
Research and Test Reactor Decommissioning Inspections
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”

2 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Contents 1.1Main stages 1.2Key issues specific to decommissioning 1.3Main areas and activities 1.4Differences between decommissioning and operation

3 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Training objectives Upon completion of training trainees should be able to: –Explain the main tasks of decommissioning. –Determine the main decommissioning areas and activities.

4 Project BG/04/B/F/PP , Program "Leonardo da Vinci" 1.1Main stages The term decommissioning refers to administrative and technical actions taken to allow removal of some or all of the regulatory controls from а nuclear facility (except for а repository, which is, by definition, subject to closure and not decommissioning). (IАЕА, “Decommissioning of nuclear power plants and research reactors”, Safety Standard Series WS-G-2.1, Vienna, 1999) Decommissioning

5 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Decommissioning process All main activities in the decommissioning process are of significant direct or indirect importance to safety. They are connected to: the immediate impacts on personnel safety; shock on effects on safety during implementation of next step operations, including those that a re envisaged to take place after a considerable period of time elapses; impact on inhabitants and the environment; impact on future generations.

6 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Decommissioning strategies Immediate dismantling Deferred dismantling (safe storage, safe enclosure) Entombment

7 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Construction 2 years The main targets of « Passage » An example of decommissioning strategy – « Passage »Project, Grenoble, France Science and Support 35 years Dismantling 4 years Cleaning 6 years Authorisation Clearance

8 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Main stages of decommissioning Decontamination & Dismantling Phase Surveillance & Maintenance Phase Preparation Phase Decontamination & Dismantling Phase Preparatory Phase Final Phase

9 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Preparatory phase specification of the decommissioning plan defueling and removal of the radioactive materials generated during operation; evaluation of the quantity of which are to be generated at the dismantling; preparation for and obtaining of licenses/permits; actualization of the technical documentation of the nuclear facility; including changes to the QА system; development of training programs and training the instructors for maintaining qualification (requalification) of the personnel

10 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Surveillance and maintenance phase control over the normal operation and the condition of the systems; environment monitoring; classification the equipment; partial removal of the equipment; treatment and conditioning of the RАW; actualisation of the decommissioning plan; preparation for D&D stage activities; development and implementation of training.

11 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Dismantling and decommissioning phase licensing of activities, related to dismantling; installation of decontamination and dismantling equipment; decontamination and dismantling; qualification of equipment and materials; treatment, conditioning, transportation and storage of RAW; on-site and environmental monitoring; site release (transition to the final phase – surveillance and release from regulatory control.)

12 Project BG/04/B/F/PP , Program "Leonardo da Vinci" KNPP units 1,2 decommissioning: Main concept Post operation and preparation period Safe enclosure (35 years) Deferred dismantling (PHАRЕ Project BUL L001, Bеlgаtom– ЕWN, 2000)

13 Project BG/04/B/F/PP , Program "Leonardo da Vinci" 1.2Key issues specific to decommissioning Responsibilities Regulatory framework Safety Planning Considerations for radiation protection and environmental protection Wastes

14 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Key issues: Responsibilities States shall include provisions in their national legal framework for: decommissioning, including the preparation of decommissioning strategies and plans; establishment of а regulatory body for controlling decommissioning activities; establishment of funding mechanisms for decommissioning; development of а system for the management of the material resulting from decommissioning.

15 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Key issues: Responsibilities The operator shall be responsible for all aspects of safety and environmental protection during the decommissioning activities, i.e.: adequate level of safety; perform softy and environmental impact assessments; prepare and implement appropriate safety procedure; apply good engineering practice; ensure that staff are properly trained, qualified and competent; establish а quality management programme, and keep and submit records and reports as required by the regulatory body.

16 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Key issues: Regulatory framework The regulatory body shall establish safety and environmental criteria for the decommissioning, including: conditions on the end points of decommissioning; limits and conditions for the removal of controls for facilities containing radionuclides and criteria for the clearance of material during and following decommissioning; criteria for determining when а nuclear facility, or part of а facility is permanently shutdown; require baseline survey of the site, including radiological conditions, prior to construction to obtain information that can be used for comparison purposes with the end state after decommissioning

17 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Key issues: Safety Ensure the protection of workers, the public and the environment by means of: thorough safety assessment of the hazards, fuel, stored on as part of а defense in depth system; maintenance of integrity of the spent -site in а fuel pool; taking into account in the safety assessment the total contamination and activation of the instillation after removal the RАM; considering the new additional hazards created by specific decommissioning activities (decontamination, dismantling and demolition, removal of equipment and systems …); defining and implementing the protective measures for industrial safety, fire protection and emergency planning.

18 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Key issues Planning –The adequate and timely planning of decommissioning activities to a very large extent reduces the risk and radiological consequences, concerning decommissioning activities. Considerations for radiation protection and environmental protection –It is necessary that the national radiological protection requirements should be in compliance with the International basic standards on safety. Wastes –RAW generation should be as less as possible (application of adequate techniques for decontamination and dismantling, recycling and re-use of materials). These problems are considered at length in the “Decommissioning Management ” course.

19 Project BG/04/B/F/PP , Program "Leonardo da Vinci" 1.3Main areas and activities The main activities with an impact on safety during decommissioning include: Initial characterization of the nuclear instillation Defueling Containment maintenance and modification Decontamination Dismantling RАW management (treatment, conditioning, storage) and transport Final radiological characterization Organization and administrative control

20 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Main areas and activities Initial characterization of the nuclear instillation Defueling  Radiological characterization of all premises  Final clean-up of pool channels and plug storage

21 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Main areas and activities Containment maintenance and modification Decontamination Dismantling

22 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Main areas and activities (cont.) RАW management (treatment, conditioning, storage) and transport Final radiological survey

23 Project BG/04/B/F/PP , Program "Leonardo da Vinci" 1.4Differences between decommissioning and operation OperationsDecommissioning Reliance on permanent structures for the operating life of the facility Introduction of temporary structures to assist dismantling Safety management systems based on an operating nuclear facility Safety management systems based on decommissioning tasks Production oriented management objectives (except perhaps in research facilities) Project completion oriented management objectives Routine training and refresher training Retraining of staff for new activities and skills or use of specialized contractors

24 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Differences between decommissioning and operation (cont.) OperationsDecommissioning Permanent employment with routine objectives Visible end of employment — refocus of the staff's work objectives Established and developed operating regulations Change of regulatory focus Predominant nuclear and radiological risk Reduction of nuclear risk, changed nature of radiological risk, significantly increased industrial risk Focus on functioning of systems Focus on management of material and radioactivity inventory (e.g. for waste minimization) Repetitive activitiesOne-off activities Working environment well known Working environment unknowns possible

25 Project BG/04/B/F/PP , Program "Leonardo da Vinci" Differences between decommissioning and operation (cont.) OperationsDecommissioning Routine lines of communicationNew lines of communication Low radiation/contamination levels relatively unimportant Low radiation/contamination levels important for material clearance Access to high radiation/contamination areas unlikely or for а short time Access to high radiation/contamination areas for extended periods Routine amounts of material shipped off-site Larger amounts of materials shipped off-site Relatively stable isotopic composition Isotopic composition changing with time

26 Project BG/04/B/F/PP , Program "Leonardo da Vinci" References 1.IАЕА, Decommissioning of nuclear power plants and research reactors, Safety Standard Series WS-G-2.1, Vienna, IАЕА, Decommissioning of Nuclear Facilities, DRАFT SАFЕTY RЕQUIRЕMЕNTS, DS333, Nov Transition from Operation to Decommissioning, IАЕА TRS No420