Strategic Cycle Routes in Portsmouth Jon Spencer CTC Right-to-Ride Representative Portsmouth 14 th April 2010.

Slides:



Advertisements
Similar presentations
Limerick City Green Routes Corridor Selection Study Presentation to Limerick City Council 14 th February 2008.
Advertisements

Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
CityCo, Piccadilly Hoteliers Forum
Author, other info SCF Phase II [1] Seafront Cycle Route: Phase II.
1 Camden Cycling Campaign, February 2014 Clerkenwell Boulevard Bloomsbury Way -Theobalds Road - Clerkenwell Road - Old Street roundabout for Camden officers.
Sustainable Communities Infrastructure Development Guidelines The Influence of the Walkable Coastal Communities Project.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Planning for cycling in Horsham December Why plan for cycling? It is a relatively cheap way of providing mobility It makes efficient use of space.
An Engineering Perspective Designing Cities in Europe for Bicycles.
London's superhighways and the 'Go Dutch' Campaign Gerhard Weiss Cycling Development Officer London Cycling Campaign Over 11,500 paid up members About.
Nonmotorized Regional System Plan 1 3 rd Technical Task Force meeting Regional Nonmotorized Transportation System Plan Thursday April 3 rd 2014 Steer Davies.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Phil Noble Senior Professional Officer Strategic Planning (Transport) 20 August 2012 Active Travel Action Plan Briefing.
Study Area What is this consultation about? This consultation has been prepared to seek your views and provide you with information about proposed transport.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
Strategic Cycle Routes in Portsmouth Jon Spencer CTC Right-to-Ride Representative Portsmouth 19 th November 2009.
Investigating Traffic in Glasgow
Cycle Skills Network Audit Mark Strong Managing Consultant Transport Initiatives LLP 145 Islingword Road Brighton BN2 9SH
Cycling Safely Nottinghamshire County Council. Safer Cycling It’s not a toy… Your bike is not a toy! When you ride your bike you are a ‘road user’. This.
GNTP Business Forum Paul Southby Chair – Invest in Nottingham Partner, Geldards LLP Transport for inward investors, developers, place-makers & businesses.
| Road Safety at the heart of cycling promotion: Examples from Europe Paul Curtis Polis THE PEP Workshop: Green and Health-Friendly Sustainable Mobility.
National Cycle Policy Framework review Orla Corrigan Sustainable Transport division Cycle policy, Bike Week, NCPF review.
Nottingham’s Cycling Action Plan to 2015 Keith Morgan Transport Strategy Nottingham City Council.
Seminar 23rd November 2001 Other Policies: Demand Management & Highway Investment Professor Marcial Echenique.
CENTRAL ACCESS SCHEME FOR THE CITY OF KILKENNY Traffic Considerations The feed back resulting from public consultation did cause us to revisit the traffic.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Cycling Scotland Revamping Cycle Guidelines Photo by Patrick Lingwood Cycling Scotland Revamping Cycle Design Guidelines with New Innovations.
Land Use Study for the Community of Winchester July 9, 2012.
WEBINAR Provisions for cyclists: Expanding the cycling horizon 6 June 2012 Debbie Reed, Brighton & Hove City Council.
Regional Centre Transport Vision 2013 Presentation to Salford City Council Members - 19 August 2008.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
GNTP Business Forum – The Big Idea – Gary Smerdon-White 18 th September 2012.
LTP3 Development Sean Parks Nottinghamshire County Council.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Scrutiny of Hertfordshire County Council’s Cycling Strategy Cycling Infrastructure Design Hertfordshire Highways October 2009.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Cardiff Cycling Campaign To County Council Scrutiny C’ttee 9 September 2003 Max Wallis (chair CCC)
HCC Scrutiny Committee Cycling Policy and Delivery October 2009 Presentation on behalf of CTC North Herts.
Roads & Traffic Department College Green Public Transport Priority measure.
Putting Luas Cross City in context - Public Transport and Sustainable Measures in Dublin Dublin City Council 21 st March 2013 Gerry Murphy.
London City Airport Airport Surface Access Strategy (DRAFT) - summary of development & next steps December
Non-Motorised User (NMU) Audits Overview presentation Hertfordshire Highways Cycling Scrutiny Panel 14 th & 16 th October 2009.
PARKING STRATEGY POLICY DEVELOPMENT Transportation & Asset Management Environment & Regeneration Scrutiny Committee 28 February 2007.
Transportation in Newcastle City Centre Outline: Policy background Approach to Development Planning Performance Indicators Moving Ahead.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Scrutiny Presentation Local Transport Plan and Active Travel Strategy 24 th October 2013 Andy Summers and David Burt.
Strategy for Tallinn’s Mobility Environment : SUTP from future to today Andres Harjo Head of Transport Department of Tallinn Priit Võhandu Arbitark.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
Figures at End March 2015: Paid up members Current members: 362 Expired 2012: 15 Expired 2013: 23 Expired 2014: 37 Total on list:437 New in 2013 / 14:
Cork City  Corks transport management has developed dramatically over recent decades  It suffers from severe traffic congestion because of the number.
Measure 60 Cycle Transport Improvements Katerina Oktabcova Usti nad Labem Municipality.
CONGESTION MANAGEMENT What It Means For BLACKPOOL.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
Cycling Scotland Presentation
Southwark Cycling proposals TRRA Discussion Meeting SCST Pavilion 18 April 2015.
A FINE BALANCE! THE NEW SAFETY CODE OF PRACTICE (EVENTUALLY) Tom Lambert General Manager Streetworks Balfour Beatty Performance Director NJUG.
SOUTH TYNESIDE INTEGRATED TRANSPORT STRATEGY Presentation to Riverside Community Area Forum, 7 th February 2008 Transport Futures.
Presenter’s name Presenter’s title. Contents The current situation Reducing collisions in London [INSERT ORGANISATION NAME]’s policy How we’re helping.
TRAFFIC PROBLEMS IN GLASGOW Lesson starter:  You have a piece of poster paper in front of you.  You must draw a line down the middle of it.
Planning Healthy Neighbourhoods Presenter: Stephanie Knox.
A64 (T) Hopgrove Roundabout Improvements. Background The roundabouts at Hopgrove are located to the north east of the City of York and form a junction.
Town and Parish Forum Meeting (general) 20 th April pm – 9.00pm, Castlewood.
SOUTH TYNESIDE INTEGRATED TRANSPORT STRATEGY Presentation to East Shields Community Area Forum, 21 st February 2008 Transport Futures.
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure  Dealing with Traffic Growth &  Considering the needs of all Road Users.
Sources of Road Danger and a Vision Zero approach
City Connect 2 LEEDS CITY CENTRE IMPROVEMENT JOHN WHITE – PROJECT LEAD
City of Wilmington Bike Plan Update
HE Designated Funds Cycling Safety and integration (CSI)
Cambourne to Cambridge Better Bus Journeys: On Road Option
What follows after approval of Active Transportation
Presentation transcript:

Strategic Cycle Routes in Portsmouth Jon Spencer CTC Right-to-Ride Representative Portsmouth 14 th April 2010

Goals of the Report To present an objective assessment of the major North-South routes into & out of Portsmouth To provide a baseline for the city council's proposed cycle network To highlight the importance of good quality arterial routes To highlight areas for improvement The report can be downloaded from:

PCC Strategy Cycling will be promoted as a healthy and low stress alternative to the car and as a transport mode which is fully integrated with the local public transport system. Strategic cycle routes and enhancements for cyclists at junctions will provide the backbone to the city cycle network enabling cyclists to safely and quickly cycle to all parts of the city.

DfT & CTC Design Hierarchies 1.Pedestrians and disabled people 2.Cyclists 3.Public transport users 4.Motorcyclists and taxis 5.Commercial and business vehicles 6.Car borne shoppers 7.Car borne commuters and visitors 1.Traffic reduction 2.Speed reduction 3.Tackle problem sites 4.Redistribute the carriageway 5.Provide segregated facilities Last Resort – convert footways to cycleways Hierarchy of UsersHierarchy of Solutions

Routes There are three major cyclist's routes in to and out of Portsmouth. Eastern Road Milton to Farlington, largely OCR. Copnor Road Milton to Cosham, largely on road. Pilgrim's Way The Hard to Cosham, largely on quiet streets & OCR All of the routes may be varied somewhat

Eastern Road – Route ACL North on Velder Ave (Nothing Southbound) Toucan Crossing at Kirpal Road OCR North to Havant Road Recross at Fitzherbert Road

Eastern Road – Assessment CriterionRatingNotes AccessibilityPoorCould easily be improved with better signing ConnectivityPoorCould be improved with better signing and modification of junctions. SafetyFairSegregated facility but at times dangerously close to fast traffic. UtilityFairThe large number of cyclist give way points significantly lengthens journey times. Surfaces could be improved.

Copnor Road – Route On Road Route except: ACL at Copnor Bridge Bus lane on London Road OCR Portsbridge Roundabout to Cosham

Copnor Road – Assessment CriterionRatingNotes AccessibilityPoorCould be improved with signing and designation of appropriate routes to major destinations. ConnectivityFairCould be improved with better signing and better exploitation of existing facilities such as the A27 bridge at Peronne Road. SafetyPoorOnly suited to experienced & confident cyclists. Hazards from heavy traffic on narrow sections and excessive parking. Poor UtilityFairThis is a speedy route in and out of the city. However, the off-road section at Hilsea is badly designed, confusing and awkward to use.

Pilgrim's Way – Route ACL/on road to Edinburgh Rd OCR to Flathouse Quay On Road Flathouse Quay OCR to Buckland ACL/On road to Rudmore OCR & quiet roads to Stamshaw OCR Stamshaw park On road to Mountbatten Thence OCR

Pilgrim's Way – Assessment CriterionRatingNotes AccessibilityPoorThe route is fairly easy to find from the end points but confusing and difficult to follow. ConnectivityGoodThis route connects most of the important locations in the city, however there is room for improvement in signing. SafetyPoorThere are some sections of this route, notably at Portsmouth Greyhound Stadium, Rudmore Roundabout and Hope Street/Market Way that are positively hazardous. UtilityPoorThe route is tortuous and time consuming. Surfaces are poor and little thought has been given to cyclists needs in design.

Conclusions Arterial cycle routes in and out of the city are the essential starting point for a cycle network Current strategic routes do not support PCC aims to create a cycle network There is no consistency of design Each route falls short of DfT standards Cyclists are ignored or given lowest priority at junctions Road surfaces are good; OCR surfaces less so Signing is very poor. None of the routes offers a compelling alternative for car commuters

Next Steps PCF is wants to help PCC develop: Consistent design principles for city cycling A long term plan to bring each route into line with these principles  Noting that a big bang approach is not feasible  Including maintenance strategy & schedule for OCR The development of a well-used cycle network permeating the city from the strategic routes Plans ‘on the shelf’ to exploit future developments – e.g. Tipner Interchange, The Hard, …

Quick Wins In the meantime, what can be done quickly? Review signing introduce consistent signs along each route Take full advantage of existing & underutilised pieces of infrastructure (e.g. Peronne Road Bridge) Prepare a prioritised plan of required improvements by area to be ready to take advantage of opportunities for implementation as part of other developments or highway works.