1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.

Slides:



Advertisements
Similar presentations
Status Report Presentation. Is this initiative ahead of schedule (why – explain)? Is this initiative on schedule (why – explain)? Is this initiative.
Advertisements

Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
January 6. January 7 January 8 January 9 January 10.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
GlueX Collaboration Meeting, Newport News, October 25-27, 2007 GlueX Simulations Status Report Richard Jones GlueX Collaboration Meeting, Newport News,
DESY PRC May 10, Status of OLYMPUS -Project DESY PRC MAY 5, 2009 OLYMPUS-Proposal conditionally approved by PRC October 2008: 1.) details of the.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Software Overview David Lawrence, JLab Oct. 26, 2007 David Lawrence, JLab Oct. 26, 2007.
ESPLOST Update Savannah-Chatham County Public Schools May 2, 2007.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Fleming College Quality and Risk Management Review Summary February 2, 2006.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
MICE CMPB Alain Blondel 1 Highlights on MICE.
SunSatFriThursWedTuesMon January
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
The GlueX Detector in Hall-D at Jefferson Lab February 16, 2010 David Lawrence, Jefferson Lab (for Curtis A. Meyer, Carnegie Mellon University) July 7,
MOU’s and Contracting Elliott Wolin JLab Hall D Collaboration Meeting 21-Mar-2002.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  WBS’s  WBS 1  Funding profile  Schedule  Critical.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 1 Cost and Schedule Overview Marc Kaducak LARP Review June 10, 2013.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
GlueX Collaboration Meeting
CLAS12 First Experiment Workshop Report
Preparations for a Lehman Review
LCLS Ultrafast Science Instruments
CMS Goal of the experiment
General Update Jian-ping Chen, JLab SoLID Collaboration Meeting
X-Ray Endstations Update
General Update Jian-ping Chen, JLab SoLID Collaboration Meeting
Presentation transcript:

1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer

2 Collaboration Meeting JLAB January 2008 JLab / Hall-D News Lets see what happened/happens at JLab Will Brooks left JLab to Chile looking for a new APM Richard Milner declined to be JLab Director 3 Scientists are hired Alex Somov starts 1 st of Feb Beni Zihlmann and Jim Stewart start 1 st of April Budget: 9 M$ short compared to 2008 target funding no laying off of people 6 GeV running very short: potential shutdown June’08 – January’09 physics division budget very short potential impact on: magnet refurbishment SiPMT R&D any other activities not covered in 12GeV R&D and PED plan

3 Collaboration Meeting JLAB January 2008 Survived CD-2 IPR, EIR and EVMS review Get ready for CD-3 Lehman review July 2008 “survive” following reviews FDC mini review 31 st of January Calorimeter / PID review ~18 th of February Drift Chamber Review end of March System Review mid of May what level of design complete do we need 100% for equipment with major FY09 procurements BCal, CDC, FDC, BCal, CDC, FDC, 90% for equipment with major FY10 procurements 90% for equipment with major FY10 procurements Solenoid, FCal Solenoid, FCal 80% for equipment with major FY11 procurements 80% for equipment with major FY11 procurements Electronics, Trigger, Tagger Electronics, Trigger, Tagger 70% for equipment with major FY12 procurements 70% for equipment with major FY12 procurements UPV, ToF, DAQ, Hodoscopes, Beamline UPV, ToF, DAQ, Hodoscopes, Beamline in parallel to still significant R&D efforts Develop pre-briefing material for CD-3 IPR The Way to CD-3 The Way to CD-3 Elton

4 Collaboration Meeting JLAB January 2008 The Way to CD-3 regular Wednesday phone meeting and subgroup meetings communication is becoming better and my life to monitor progress for EVMS has become easier specifications for major procurements > 500k$ or critical path items progress still very slow need to develop detailed schedules for QA and construction of individual detector parts following high level P3e schedule need to work on MOUs one with Lanzhou till now; to invite PostDoc and PhD-student to JLab Manpower still a serious issue 6 th -8 th March workshop first step to an improvement running behind on R&D and PED lets concentrate on base equipment try to stay realistic what can be achieved by one person

5 Collaboration Meeting JLAB January 2008 The Way to CD-3 challenging

6 Collaboration Meeting JLAB January 2008 need a CR for UPV R&D and PED till end of February Statement of Works for companies clear specifications D/software/wiki/index.php/GlueX_tagger_specification staged deliverables linked to payments define communication and response times on both sides D/software/wiki/index.php/Statement_of_Work_for_the_100%25 _engineering_drawings D/software/wiki/index.php/Statement_of_Work_for_the_100%25 _engineering_drawings just business contracts even they are our friends for university groups have to be written that JLab gives work to university  DOE state and separate manpower and equipment costs try to keep schedule  impact on EVMS