Status of the AD ADUC 13/6/2012T. Eriksson CERN BE/OP.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

ELENA and AD Status ELENA project status and plans Status of the AD target consolidation (M. Calviani) Consolidation project for AD. What is done in 2011.
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
AD status in 2012, foreseen consolidations at AD ADUC 20/11/2012T. Eriksson CERN BE/OP.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Status and Prospects for the AD and ELENA
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
AD start-up 2014 A rough and brief summary MSWG 16/01/2015T.Eriksson BE/OP1.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
ATC/ABOC 2007T. Eriksson CERN AB/OP AD Machine and Experimental Areas – Operation and major problems in 2006, outlook for 2007.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Antiproton Decelerator (AD) Consolidation ADUC 13/1/2015T. Eriksson CERN BE/OP1.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
AP2 & Debuncher Acceptance Keith Gollwitzer Dept. of Energy Review February 25, 2004.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
T.Eriksson P.Belochitskii G.Tranquille CERN, BE department, 1211 Geneva 9 September 2011T. Eriksson CERN BE/OP.
Low Energy Antiproton Facility at CERN Christian Carli on behalf of the AD and ELENA team …. with special thanks to P.Beloshitskii, T.Eriksson and S. Maury.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Slide 1 Overview Introduction Stochastic Cooling History of the Antiproton machines at CERN The AD and ELENA Conclusion.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
ELENA installation progress F. Butin / ELENA collaboration.
Report Technical Director Storage-Ring-Installation Completed
Vacuum System P. Chiggiato TE-VSC
Oleksiy Dolinskyy December 1st, 2014
Status of HESR 18th March Gießen Dieter Prasuhn.
ELENA installation and commissioning status
A.Lachaize CNRS/IN2P3 IPN Orsay
Installations up to Start of Commissioning
AD consolidation activities in LS2
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
ELENA Beam Transfer Workpackage
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
ELENA Extra Low ENergy Antiproton Ring
(Beam) Commissioning Plan
ELENA beam commissioning
Electron Cooling in ELENA - observations and plans
Presentation transcript:

Status of the AD ADUC 13/6/2012T. Eriksson CERN BE/OP

AD startup 2012 Closure/search of ring and target area 16/3 Cancel OP8 and OP9 procedures Power up all necessary converters for: DSO-tests 2 weeks of HW-tests/cold checkout (20/3 – 30/3): –Many interventions were made during the shutdown: Vacuum leak repairs in s48 (ring) and FTA-line Ejection septum leak: left as is with water circuit closed and pumped Water leak repair on main Quad s47 E-cooler cathode replacement => bakeout of sector Injection line pulsed elements converter renovation & 4 new units (new design) New converter for DE.DHZ7042 dipole Modification of ring orbit corrector converters GEM detector installation completed – all ejection lines now have GEM:s installed Many tests, manipulations and repairs in target area in view of consolidation New cabling for improved ring converter diagnostics (NAOS) Visitor itinerary through AD ring –=> It was a busy period ! ADUC 13/6/2012T. Eriksson CERN BE/OP

AD startup 2012 Startup with beam 31/3 – 26/4 –Debug injection, beam cooling, deceleration etc. –Optimize beam emittances, deceleration and beam parameters at ejection energy. –Verify ring parameters (tunes, orbits, chromaticity etc.) –Set-up and optimize ejection lines –Studies (depending on time available): Injection line (dogleg): MTV:s can now be used thanks to improved CCD-cameras Minimize transverse tails at 100 Mev/c GEM tests at 100 and 500 MeV/c Optics studies in 7000-line (ELENA matching issue) ASAUSA line optics improvement – RFQD matching New pulsed converters stability (ELENA/AD/PS complex synchronization) (AD cycle programming: verification of some features in view of ELENA) (Orbit pickup sensitivity; dependence on beam intensity) (Tests for future tune measurement system) (Tests of new stochastic cooling parameter control) (Dispersive optics at 100MeV/c vs. cooling performance) (Minimize losses at 3.5 GeV/c) Physics started as planned 27/4 (=> Not all experiments ready at this time) 31 weeks of physics in 2012 planned ADUC 13/6/2012T. Eriksson CERN BE/OP

AD cycle/performance ADUC 13/6/2012 -Good efficiencies established relatively fast - Some (initial) problems with unstable trajectories at 100MeV/c T. Eriksson CERN BE/OP

Beam parameters at 100 MeV/c - Longitudinal emittances: ejected bunch length was 100 ns at startup, growing to 170ns later. - Previous years we started at 160ns which increased to 250ns during the summer -8/6/2012 transverse profiles: little or no sign of tails or halos. 80% of the beam is within 0.5 – 0.8 pi.mm.mrad ADUC 13/6/2012T. Eriksson CERN BE/OP

Ejection line optics Studies on ejection line optics mismatch (md): –Kick response measurements show incoherencies –Improved TV-cameras for MTV 7001/7045: can now be used for pbars –New GEM-detectors better suited for optics validation –BHZ8000 (not used today): shielding against remanent fields installed –Important for ASACUSA RFQD matching + ELENA transfer line design –Common part is validated up to DE0.GEM42 after shielding of BHZ8000 and including DE0.BHZ fringe fields in calculations –Will continue….. ADUC 13/6/2012T. Eriksson CERN BE/OP

ASACUSA beamline ADUC 13/6/2012T. Eriksson CERN BE/OP -Some studies done to recover good trapping efficiency (1.5E6) -Some discrepancies downstream of DE0.GEM42 -With larger than normal beam, vertical divergence is observed between the ASACUSA watchdogs -Slight improvement with DE1.BHZ10 fringe field included in MAD. Not yet operational since other discrepancies should be found first. -Trapping rate very sensitive to beam emittances -0.8E6 trapped presently -Needs more studies

AEGIS beamline -Improvement after including dipole gaps in MAD. -Tuning vs. trapping rate -3D model also tested but no real improvement ADUC 13/6/2012T. Eriksson CERN BE/OP

ALPHA beamline -Focal point moved -Dipole gaps now included in MAD -3D modelling to be done ADUC 13/6/2012T. Eriksson CERN BE/OP

ATRAP1 beamline -ATRAP1 zone verified -Beam profiles ok on last monitor but very large upstream -Losses due to scraping? -New optics upstream of GEM42 yet to be included ADUC 13/6/2012T. Eriksson CERN BE/OP

AD consolidation ADUC 13/6/2012 –A limited program was approved in 2009 in view of continued AD operation until 2016 –Only main items with high RS and long leadtime to be done –Breakdowns will be treated with emergency measures –With ELENA, “2016 closedown” now looks more like “>2030” ItemGroupRS RS after  Manpo wer MMM10M11M12 MYkSfr AD MagnetsTE-MSC156<2.4 (*) AD power convertersTE-EPC103<4.3 (*) AD controlsBE-CON.A 0000 AD vacuum ion pumpsTE-VSC AD vacuum ion pump power supplies&controlsTE-VSC AD Stochastic cooling p/u&kicker movementBE-RF92150 AD Stochastic cooling electronicsBE-RF AD C02 systemBE-RF AD target area ventilation & interlocksEN-STI AD target water cooling + ctrlsEN-STI AD kicker oil systemTE-ABT AD kicker power supply/controls upgradeTE-ABT AD ejection line power convertersTE-EPC AD C10 systemBE-RF AD power converter sparesTE-EPC sum T. Eriksson CERN BE/OP

Magnets, ring and transfer lines Completed: –Ring main B partially re-shimmed (after coil movement measurements) –Ring (B+Q) water hoses/filters renewal –DR.QFC54: spare coil located Ongoing: –Ring BHN spare coils: order placed, delivery 2013 (to complete spare parts inventory) N.B: missing spare coils for the other main magnets were located after the consolidation plan was finalized. => budget requirements reduced –Orbit correctors 2904/2917: New design, order placed, delivery 03/2012 To be added in view of prolonged AD lifespan: –Overhaul of ring main bending and quad magnets: removal/disassembly of one unit for assessment?, re-shimming?, build complete spare unit? –7020/7030 quads: new magnets, redesign? (no spares available) ADUC 13/6/2012T. Eriksson CERN BE/OP

Power converters Completed: –DR.Q-TRIM1 upgrade, in operation –DR.Q-TRIM3 upgrade to be commissioned 03/2012 –E-cooler correction dipoles renewal, in operation –Dogleg pulsed converters: renewal of capacitors –Dogleg pulsed converters: 4 new converters operational as of 2012 Ongoing: –DR.Q-TRIM2,4 and 5 upgrade in LS1 –Main B/Q + BTI247 magnetic component spares: delivery in 2012 To be added in view of prolonged AD lifespan: –Study soon to be published by TE/EPC (tech + budget requests) Other: –Ejection line consolidation abandoned due to new e-static ELENA lines –Stochastic cooling main converters will be rebuilt by BE/RF ADUC 13/6/2012T. Eriksson CERN BE/OP

Beam cooling, stochastic Completed: Ongoing: –Electronics for system parameter control: replacement of obsolete equipment/controls interface with PLC-based system. To be commissioned 03/2012 –u-wave amplifier power supplies: replace existing large units with 48 individual supplies + renewed PLC-based controls. Call for tender & purchase in 2012 N.B. support will change from TE/EPC to BE/RF –Pickup/kicker movement: Update of obsolete system with modern digital servo motor controller. To be done during LS1 To be added in view of prolonged AD lifespan: –Renewal of u-wave amplifiers: needs evaluation, cost ~ 2 MCHF –p/u & kicker vacuum tanks: returned from GSI in 2012 => To be used for tests of new p/u & kicker movement system components. Can we also use these as spares ? ADUC 13/6/2012T. Eriksson CERN BE/OP

Beam cooling, electron Completed: –HV-supply: Renewal of Faraday cage, HT transformer, converters, interlock system, safety, electronics/controls interface: operational since 2010 Ongoing: To be added in view of prolonged AD lifespan: –Build a completely new modern cooler ~ 2.5 MCHF –Existing cooler: Is >30 years old We have no spare magnets; very long down time if failure, significant cost for new spares Performance issues (?) e- bpm:s not operational Contains unused equipment ADUC 13/6/2012T. Eriksson CERN BE/OP

RF Completed: –C10: renewal of bias power supply and final tube filament heater, procurement of spares for filament transformer Ongoing: –C10: renewal of 1kW drivers. 2 units are delivered to CERN. 1 unit is operational and under evaluation/improvements due to initial problems –C02 tuning system and HT-supply renewal: to be started (lack of manpower). Equipment needs to be displaced for ELENA – has to be done in LS1 To be added in view of prolonged AD lifespan: –C10 final stage tubes: tests of existing spare units during LS1. Do we have enough good spares ? If not, new systems need to be constructed. Cost unknown, but > 1 MCHF –C10 electronics/controls renewal –C10 low-level upgrade (?) –Beam control: migration to standard DSP-based system. ADUC 13/6/2012T. Eriksson CERN BE/OP

Beam transfer Completed: –Kicker Oil system consolidation (?) –Magnetic Horn: Electronics/controls interface/interlock system renewed (PLC-based) - operational Trigger generation system consolidated – operational Spare units for capacitor charger re-activated (but still 25 years old) Ongoing: To be added in view of prolonged AD lifespan: –Kicker Vacuum tanks: Structural improvements (vacuum leaks) – to be defined –Kicker Electronics/controls renewal: included in the ELENA planning since the platform needs to be displaced –Magnetic Horn: replace Mercury ignitrons with solid state switches, renew capacitor chargers, build new test stand (B174 dismantled) ADUC 13/6/2012T. Eriksson CERN BE/OP

Vacuum Completed: –NEG pump improvement in electron cooler: operational –Pressure gauge power supplies/controls: New system installed in 2012 Ongoing: –Ion pump power supplies/controls: planning to be revised To be added in view of prolonged AD lifespan: –As proposed by TE/VSC: Cryo system renovation bakeout system upgrade general controls upgrade Ion pump HV feedthrough improvement (heating system) ADUC 13/6/2012T. Eriksson CERN BE/OP

Instrumentation Completed: –Renewal of control room signal analyzers –Replacement of all ejection line MWPC:s by GEM-detectors. –Upgrade of MTV:s to CCD-cameras. Works well with low-intensity beams. Ongoing: To be added in view of prolonged AD lifespan: –Schottky analysis (longitudinal): integrate ageing DSP equipment into new LL beam control system –Orbit system: renewal => study new solutions e.g. individual ADC:s –BBQ-tune measurement => study new solutions –BCT (TFA6006 and 5302) renewal: mechanical redesign –BCT (all) electronics/software update –DCCT (TRA4207) electronics –Other; SQUID studies etc. ADUC 13/6/2012T. Eriksson CERN BE/OP

Target area Completed: Ongoing: –Knowledge transfer –Study aimed at identifying consolidation needs. Many interventions and manipulations were done this shutdown. To be added in view of prolonged AD lifespan: –Many many items ! ADUC 13/6/2012T. Eriksson CERN BE/OP

Other Experimental area (see F.Butin’s talk) Infrastructure Controls ADUC 13/6/2012T. Eriksson CERN BE/OP