Monthly Management Report March 2013. By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.

Slides:



Advertisements
Similar presentations
Monthly Management Report February By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
Advertisements

1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
Clean room administrative committee Meeting TUMS Murthy Jan 29 , 2013
The Cryopit Fraser Duncan Cryopit Workshop 16 August 2011.
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
B.ARCH. SEMESTER-II AR 126 BUILDING TECHNOLOGY – P/H UNIVERSITY INSTITUTE OF ARCHITECTURE Scheme of Teaching L T P Total Scheme of Examination.
Objectives: Understand importance of utility and maintenance system in industry/plant.
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
The students: Mohammad Shabaro ( ) Mahmoud Mousa ( ) Yosri Asfour ( ) Supervisor: Dr. Iyad Assaf 1.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 1, 2014 Cleanroom administrative committee.
1 Kevin Cope Imperial College London Head of Building Operations Carbon Management Plans - achievements, maintenance and the future.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Prabhakara Rao Jan 6, 2015 Cleanroom Admin Committee Meeting.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Oct 28, 2014 Cleanroom Admin Committee Meeting.
NATIONAL NANOFABRICATION CENTRE CLEAN ROOM COMMITTEE MEETING TUMS Murthy 26 July 2011.
Presentation on the Salient Aspects of STATE DATA CENTRE.
GREEN INITIATIVES AT IIMB Brief outline and benefits.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Computer Operations Group Data Centre Facilities Hitendra Patel June 2015.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
DELIVERING ENERGY INNOVATIONS AT SCALE THE IMPORTANCE OF DATA FOR ENERGY EFFICIENCY BRETT GOODYEAR – HEAD OF OPERATIONS
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report Submitted By Facility Management Team
Monthly Management Report May Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
AGENDA FOR AGM Agenda for AGM on 19 th May A.M Introduction of New Committee Highlights- Development work in Phase-I Planned activities –Inputs.
© 2006 MIMOS Berhad. All rights reserved. MIMOS BERHAD TENDER BRIEFING ON THE APPOINTMENT OF CONSULTANT TO STUDY AND PROPOSE POWER QUALITY.
Monthly Management Report October Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Dec 2, 2013 Cleanroom administrative committee.
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 28 May 2014 Cleanroom administrative committee.
1 CTC 450 Review Water Processes. 2 Objectives Understand the basics with respect to operation of waterworks.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Monthly Management Report Submitted By Facility Management Team
NATIONAL NANOFABRICATION CENTRE CLEANROOM ADMINISTRATIVE COMMITTEE MEETING TUMS Murthy 27 Mar 2012.
COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD Monthly Review Meeting – August 2008.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 27, 2013 Clean room administrative committee.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Project Update August 2008 Richard Rife Deputy Project Manager.
Sewage Treatment Plant ELIL ABODE. STP Figure A3A1 A2 S1 S2 SF F1 F2 CF.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 26, 2014 Cleanroom Admin Committee Meeting.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
Connections are loose for draining pump Water in From street Water out to house This is the setup for public water Pressure and the pump system turned.
PSSAOWA Annual General Meeting PSSAOWA Slide 1.
Monthly Management Report Jul2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
Monthly Management Report September Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
 Market Survey  Design, supply, delivery and installation of a Clean Room Facility  at the entrance of the LAr detector tank,  used for the storage.
Monthly Management Report Jun2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
West Cambridge Data Centre Ian Tasker Information Services.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
50% LBNE Concept Design LAr Infrastructure. Mechanical.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Jan 8, 2013 Clean room administrative committee.
RAINMAKER and RAINMAKER Enviro
North Penn School District
Electronics and Controls
Advanced Evaporative Pre-Cooling
San Luis Potosi – New plant April 24th 2015
CTC 450 Review Water Processes.
Cooling technology Main components and equipments
Equipment Services.
PROVIDENT WELWORTH CITY APARTMENT OWNERS’ ASSOCIATION
Community Life at St. Giles
Full Service Plumbing Columbus, Ohio. plumbing The art and science of creating and maintaining sanitary conditions in a building used by humans. It is.
Presentation transcript:

Monthly Management Report March By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore

Facility Management NNFC EXECUTIVE - SUMMARY This report is a review on our performance during the last Month and is an attempt to analyses and evaluate our service delivery and make a progressive step forward with improvement plan. The following points are put forward for review 1.Scope and nature of services 2.Proposed manpower distribution. 3.Availability of manpower. 4.Low lights. 5.Highlights. 6.Initiatives planned for next month. 7.Power failure analysis 8.Monthly HSD consumption. 9.DG- Generated power KWH. 10.EB power consumption. 11.Average power consumption EB+DG. 12.Liquid nitrogen consumption. 13.Suggestions and requirements. 14.Help desk, Complaint register

1.Scope & Nature of Services Facility Management NNFC CeNSE-Facility Management Electrical HVAC Plumbing Help desk ETPBMS RO Plant Ultra pure water system

2.PROPOSED MANPOWER DISTRIBUTION Facility Management NNFC

3.Availability of Manpower Facility Management NNFC DESIG NATI ON Pla ne d Aug -11 Sep -11 Oc t- 11 No v- 11 De c- 11 Jan -12 Fe b- 12 Ma r- 12 Ap r- 12 Ma y- 12 Jun -12 Jul- 12 Au g- 12 Se p- 12 Oc t- 12 No v- 12 De c- 12 Jan -13 Fe b- 13 Ma r- 13 Facilit y Mana ger Techn ologis t Electri cian Chiller opera tors BMS opera tor Plumb ers Asst.T echnic ian Total

4.Lowlights. Facility Management NNFC DateLocationFailure detailsAction taken & Status LT Panel roomPower fluctuation between 6:30 Hrs to 9:00 Hrs Incoming power problem, solved by CCMD BMSMCB tripped, total BMS tripped.User tried to fix external equipment with out FM team knowledge. Due to improper connection its tripped CCTV system, BMS Due Spy guard problem 14 cameras were not functioning. Repair the spy guard and solved the issue by FM team LT panel roomLow incoming voltage.Due to EB incoming problem, solved by CCMD.

5.Highlights. Facility Management NNFC CDA PPM done. AHU -1&2 pre & Hepa filter changed. DG PPM done. CHR-3 condenser cleaned. Utility LT panel cleaned. Wet scrubber blower repairing works done. Characterization PAC unit PPM done. Utility AHU PPM done. Litho, Thin films Tools PCW water filter changed. Cense CCTV camera problem rectified by FM team. (14 cameras was not functioning due to power issue) CeNSE 250 KVA UPS AMC done ( ) Utility drain line connection done. Equipment development room PCW connection done. SF-33 3Phase UPS connection done. DI plant drainage done. LED tv CeNSE by FM team.

6.Initiatives Planned for next month Facility Management NNFC  Liquid nitrogen pipe line connection for defrosting.  Fire pump pressure switch connections.  RO plant reject water & Di RO reject joint connection.  CCTV upgrade.  DG area street lights.  STP connection to RO tank.

7.POWER FAILURE ANALYSIS Facility Management NNFC SLDateFromToTotal :30,12:259:45,12:35 25 Mins :309:30 3:00 Hrs :30,11:1510:15,12:30 2:00 Hrs :40,15:00,15 :20,18:50 14:50,15:15,15:30,18:55 40 Mins :2510:50 1:25 Hrs :307:40 10 Mins :45,17:1013:50,17:25 20 Mins :50,18:308:55,18:35 10 Mins :3015:40 1:10 Hrs :10,19:3013:15,19:35 10 Mins :008:10 10 Mins :007:30 30 Mins :15,16:2016:10,16:30 3:05 Hrs :3510:00 25 Mins :15,20:5010:45,21:00 40 Mins TOTAL HRS 14:20 Hrs

8.MONTHLY HSD CONSUMPTION Facility Management NNFC

9.DG Generated Power KWH Facility Management NNFC

10. EB Power Consumption Facility Management NNFC

11.AVERAGE POWER CONSUMPTION EB+DG Facility Management NNFC

12.LIQUID NITROGEN CONSUMPTION Facility Management NNFC

13.Suggestions and Requirements Facility Management NNFC Shelters to be provided for DGs, Gas cylinders & Fire pump house to avoid rain water and leaves come inside the DG cabin, utility building & Raw water tank in side. Shelter with closed fencing can make on the Fire tank & this area use as storage place. Uniform & Safety shoes to be provided for all maintenance staffs. Chemical & Gas cabinet exhaust to be provided.

14.Help desk, Complaints register Facility Management NNFC