24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.

Slides:



Advertisements
Similar presentations
G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
Advertisements

1 Government-Industry Data Exchange Program GIDEP as a Resource Presentation for the Code 300 Orientation June 15, 2012 Presented by: Michael J. Sampson,
NASA’s Goddard Space Flight Center LRO SRR Project Management.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
Mission Directorate Exploration Systems MSFC CD Chief S&MA Officer MSFC SMA DART Project Office (J. Snoddy) DART Contract (CPIF) 17 Mission Directorate.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
ISO 9000 Certification ISO 9001 and ISO
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
Level 1 - LRO Requirements ESMD-RLEP-0010
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Mission Success Starts With Safety 07/19/2001 (1) NASA EEE Parts Assurance Group (NEPAG) Quality Leadership Forum July 19, 2001 Michael J. Sampson NEPAG.
Dan Conlon Auditor Workshop “Output Matters” 14 July 2008.
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Mandatory Technical Standards Engineering Management Board Goddard Space Flight Center July 10, 2003 Updated October 7, 2003 HQ/Code AE R. Weinstein.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
Philip Luers NASA/GSFC Code 561 August 16-17, 2005
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
The Role of NCAS Assessments NASA Supply Chain Conference Goddard Space Flight Center November 14, 2007.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety The NASA Safety.
1 Lunar Reconnaissance Orbiter (LRO) Overview CRaTER PDR 6/27/2005 Craig Tooley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.
EFW DFB Systems Assurance
EFW DFB Systems Assurance
FIELDS Mission Assurance Manager University of California, Berkeley
THEMIS Mission Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
GLAST Large Area Telescope:
BRIAN KLATT MISSION ASSURANCE MANAGER
Systems Safety and Mission Assurance (SSMA) Overview Mission PDR
LRO SRR Planned for 8/16-18/2005.
Instrument PDR Summary of Objectives
PSS verification and validation
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005

24a - 2 NASA’s Goddard Space Flight Center Mission Assurance Requirement Summary GSFC Responsible GSFC PI Russia Responsible UoMD PI MIT Responsible Boston U PI GSFC Responsible Mission Assurance Requirements are consistent across project with independent oversight of each element LRO Level 1 Requirements ESMD-RLEP-0010 LRO Level 1 Requirements ESMD-RLEP-0010 RLEP Mission Assurance Requirements 430-RQMT RLEP Mission Assurance Requirements 430-RQMT Mission Assurance Guidelines 300-PG Mission Assurance Guidelines 300-PG LRO Spacecraft PAIP LRO Spacecraft PAIP LOLA Instrument PAIP LOLA Instrument PAIP LEND Instrument PAIP LEND Instrument PAIP LAMP Instrument PAIP LAMP Instrument PAIP CRaTER Instrument PAIP CRaTER Instrument PAIP Diviner Instrument PAIP Diviner Instrument PAIP Mini RF Tech Demo Mini RF Tech Demo DoD Responsible LROC Instrument PAIP MSSS Responsible Northwestern Univ PI SwRI Responsible NW PI JPL Responsible UCLA PI

24a - 3 NASA’s Goddard Space Flight Center Mission Assurance Organization LRO Experienced Personnel provide oversight and technical support across all elements of LRO Project EEE Parts Rich Williams EEE Parts Rich Williams Materials Pilar Joy Materials Pilar Joy Reliability NinoIngegne Lydia Lee Reliability NinoIngegne Lydia Lee Hardware QA Willie Jones Alton Lacks Hardware QA Willie Jones Alton Lacks Software QA Cindy Taylor Software QA Cindy Taylor Manufacturing Nick Virmani Manufacturing Nick Virmani Systems Assurance Manager Ron Kolecki Safety Manager Dave Bogart Systems Assurance Manager Ron Kolecki Safety Manager Dave Bogart Office of System Safety and Mission Assurance Director Office of System Safety and Mission Assurance Director LRO Project Manager Craig Tooley LRO Project Manager Craig Tooley

24a - 4 NASA’s Goddard Space Flight Center Requirements Applicable to all Mission Concepts QMS: ISO 9001:2000 Nonconformance Control (NCR or PFR) MRB/FRB Requirements Hardware, S/W or Design Reuse Configuration Mgt. Reqts. Flowdown Contractor Surveillance Safety Program per NPD System Safety Plan Hazard Analyses MSPSP Ground & Hazardous Ops. Orbital Debris Launch Site Support Mishap Reporting Probabilistic Risk Assessment FMEA / FTA Part Stress & WCA Trend Analysis Limited Life Risk List Documented Program (PAIP) Software Safety per NASA-STD Verification & Validation, IV&V Configuration Mgt. Formal Reviews Problem Reporting/ Corrective Action Surveillance Independent Design Reviews Verification Plans/ Specs (GEVS-SE) Test Matrix/ Verification Reports Component/ Subsystem Reviews Verification Reports RLEP MAR 430-RQMT PG (MAG) LRO Spacecraft/ Orbiter PAIP 431-PLAN LOLA PAIP LOLA-PLAN LEND PAIPLROC PAIP CRaTER PAIP DWG Diviner PAIP LAMP PAIP PAIP Quality System / Configuration Control System SafetyReliability/RiskSoftware Assurance Design Verification/ Technical Reviews

24a - 5 NASA’s Goddard Space Flight Center Requirements Applicable to all Mission Phases RLEP MAR 430-RQMT PG (MAG) NASA-STD-8739 Series PWB Design per IPC , D- 275 PWB Mfg. Per ICP A W/ GSFC Supplement PWB Coupons Training / Certification ESD – ANSI/ESD S20-20 Level 2 parts per EEE-INST-002 Parts Control Board Derating Radiation Effects– TID, ELDR, SEE Value Added Tests (PIND, etc.) Alerts Test Data & EIDP Photos Compliant Materials & MSFC-STD-3029 Outgassing Limits (TML/CVCM) Shelf Life Controls Materials & Process Lists for LRO MAE Review & Approval Fastener Integrity (541-PG ) Raw Material Certs. Contamination Verification Process Contamination Control Plan Outgassing T/V Bakeouts of all Hardware Hardware Handling & Cleanroom Standards. Respond to GIDEP and NASA Advisories (GPG ) LRO PAIP 431-PLAN Workmanship/Design/ ESD Requirements EEE PartsMaterials & ProcessesContamination Control GIDEP Alerts & Problem Advisories

24a - 6 NASA’s Goddard Space Flight Center RLEP/LRO MAR – PAIP Relationship The RLEP Mission Assurance Requirements (MAR) document was written to define the overall mission requirements for hardware, software and related critical ground support equipment. The Spacecraft/Orbiter and Instrument teams responded with their Performance Assurance Implementation Plans (PAIP) which outline how the individual institutions and their contractors would meet the requirements called out as CDRLs in the MAR. After the project has reviewed the initial PAIPs and commented back to the teams, revisions in the PAIPs may be required. Those requirements which the developers cannot meet will be documented on a waiver request.

24a - 7 NASA’s Goddard Space Flight Center Problem Failure Reporting Both the spacecraft/orbiter and instrument teams are required to document failures (at the first application of power at the start of end item acceptance testing or the first operation of a mechanism) or nonconformances with received product. The LRO project office must be notified of problem/failures within 24 hours of occurrence. A failure review board may be required to disposition the actions related to the issue. A closed loop nonconformance system is also required by the MAR. It shall include ensuring the corrective action is implemented to prevent recurrence. A Material Review Board is required to disposition other than preliminary reviews. The teams QA lead shall be a member of the MRB. The MRB chairperson shall notify the LRO project of all MRB actions and recommendations.

24a - 8 NASA’s Goddard Space Flight Center Surveillance and Audits The LRO Project has a surveillance plan (430-PLAN-0003) which defines how the project will monitor hardware and software development activities from all the contractors. Assurance reviews and audits provide an insight into how the contractors are functioning. Participation by SMA in boards such as CCB, PCB, MRB, FRB and others provides insight into various phases of the design and workmanship. The LRO SMA team will use two methods of product verification. –Direct examination: inspection of hardware and associated documentation –Indirect examination: similar hardware fabricated by the same personnel and equipment, lot acceptance samples and material examinations that may take place at GSFC.

24a - 9 NASA’s Goddard Space Flight Center Mission Assurance Summary Mission Assurance Requirements are well defined and comprehensive. These are traditional requirements for GSFC Missions and they are understood. Systems with experienced personnel are in place and operating. The Lunar Reconnaissance Orbiter Mission Assurance team is ready to support PDR