1 ANASAC Meeting – May 20, 2015 Mark Lacy ALMA archive status and plans.

Slides:



Advertisements
Similar presentations
GALVESTON COUNTY, TX P-CARD TRAINING GALVESTON COUNTY.
Advertisements

SIS – NBS Online Specimen Tracking System Training
Online Collaboration Applications ADE100- Computer Literacy Lecture 28.
Software to Manage EEP Vegetation Plot Data A design proposal Michael Lee January 31, 2011.
NOAO/Gemini Data workshop – Tucson,  Hosted by CADC in Victoria, Canada.  Released September 2004  Gemini North data from May 2000  Gemini.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
Leicester Database & Archive Service J. D. Law-Green, J. P. Osborne, R. S. Warwick X-Ray & Observational Astronomy Group, University of Leicester What.
Leicester Database & Archive Service J. D. Law-Green, S. W. Poulton, J. Osborne, R. S. Warwick Dept. of Physics & Astronomy, University of Leicester LEDAS.
Library & Information Services Using the Library Catalogue Part 2: My Account Reserving Items Reading lists Rachael Hartiss 2008.
Navigation on Journal of Dairy Science ® An Overview June 2011.
CHRTAS – Training Coordinators
Page 1 of 53 The Work In Progress functionality of Transfers enables you to retrieve a transfer request, view/change the request status depending on your.
Collections Management Museums EMu 4.0 EMu (And where to from there!) Alex Fell Operations Manager KE Software (UK)
LBTO IssueTrak User’s Manual Norm Cushing version 1.3 August 8th, 2007.
1 ANASAC Meeting – May 20, 2015 Al Wootten Science Overview & Publications.
Online Autonomous Citation Management for CiteSeer CSE598B Course Project By Huajing Li.
User Interface Elements of User Interface Group View.
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
© 2007 Cummins Inc. All Rights Reserved. C UMMINS Q UALITY M ANAGEMENT S YSTEM Reports & Charts Training.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
1 ANASAC Meeting – May 20, 2015 ALMA Pipeline Brian Glendenning (for Jeff Kern)
Dec 2, 2014 MAST Data Discovery Portal Tom Donaldson Tony Rogers.
PPS/OPTRS Departmental Roles Structure System Presented by Payroll Services.
Hunter Valley Amateur Beekeepers Forum User Guide Guide shows sample screenshots with most relevant actions. Website is at
Welcome to the official tour of TrainingEvals.com SM !
Part 4 – Preview/Index, History, combining search sets, Accessing full text articles and restricting results to the HINARI subset of journals. Instructions.
Part 1 – PubMed Interface, Display options, Saving, Printing, and ing results. Instructions This part of the course is a PowerPoint demonstration.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array CASA Progress.
Data Management BIRN supports data intensive activities including: – Imaging, Microscopy, Genomics, Time Series, Analytics and more… BIRN utilities scale:
Facility Reporting v. 1.0 Managing Clinical Staffing Reports on the Illinois Outcomes Website May 20, 2009.
Historic Digimap service Ancient Roam Screen share Historic Download Questions Historic Digimap.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Using the NSA Presentation to NOAO Users Committee October 5, 2005.
1 Preparations for Implementing RDA in Ex Libris’ Products ALA Annual Conference | Anaheim, CA | 24 June 2012 Mike Dicus, Product Manager Ex Libris (USA),
Page 1 Non-Payroll Cost Transfer Enhancements Last update January 24, 2008 What are the some of the new enhancements of the Non-Payroll Cost Transfer?
IPortal Bringing your company and your business partners together through customized WEB-based portal software. SanSueB Software Presents iPortal.
V 1.0Slide 1 How to generate compliment and warning letter ? Award & Punishment – Generate letters.
Improved Access to RDA from the MSS OSD Executive Meeting April 28, 2009.
1 ANASAC Meeting – May 20, 2015 P. Jewell, J. Hibbard, C. Lonsdale Cycle 1 & 2 Status & Cycle 3 results.
© 2006 Cisco Systems, Inc. All rights reserved.1 Connection 7.0 Serviceability Reports Todd Blaisdell.
1 ANASAC Meeting – May 20, 2015 P. Jewell, J. Hibbard, C. Lonsdale ALMA / NAASC Status – 2015 ANASAC Meeting.
1 Visalia Unified School District SRTS User Training November 21, 2005 By SRTS Support
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Data Processing Progress.
Large Area Surveys - I Large area surveys can answer fundamental questions about the distribution of gas in galaxy clusters, how gas cycles in and out.
ADMIT: ALMA Data Mining Toolkit  Developed by University of Maryland, University of Illinois, and NRAO (PI: L. Mundy)  Goal: First-view science data.
ACIS Introduction to Data Analytics & Business Intelligence Database s Benefits & Components.
MBAT User Workflows View an Atlas Open Data Upload Data Run a Query –Search Data Further Examination Microarray Data Further Examination of 2D Data –Search.
PubMed/How to Search, Display, Download & (module 4.1)
A user guide to accessing, reviewing and contributing to the Online Registry System.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ALMA Pipeline.
PubMed/How to Search, Display, Download & (module 4.1)
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
1 Visalia Unified School District Principal & Area Administrator Service Request Approval Processing Using The SRTS November 16, 2005 Administrative Services.
ADMIT: ALMA Data Mining Toolkit  Developed by University of Maryland, University of Illinois, and NRAO (PI: L. Mundy)  Goal: First-view science data.
Science Overview and Discussion Al Wootten ANASAC Sept
Obtaining MISR Data Nancy Ritchey Atmospheric Sciences Data Center May 16, 2004.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
5-7 May 2003 SCD Exec_Retr 1 Research Data, May Archive Content New Archive Developments Archive Access and Provision.
+ GIO-land Verification/Enhancement Data Exchange Platform.
Fab25 User Training Cerium Labs LabCollector - LIMS Lynette Ballast.
1 © 2004 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Cisco Technical Support Seminar Using the Cisco Technical Support Website.
1 Logging into the new PCard (PaymentNet) System: PAYMENTNET * Introduction * May use IE 8.0 or greater or Firefox * Do not.
1.Switch on the computer and wait for loading. 2.Select the Windows 7 OS at the end of the list. 3.Click on the link ‘Administrator’ 4.Enter the administrator.
Easy Chair Online Conference Submission, Tracking and Distribution Process: Getting Started AMS WMC and AMS Annual Conferences Click on play to begin show.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Emdeon Office Batch Management Services This document provides detailed information on Batch Import Services and other Batch features.
Welcome to BLT Online NQT Induction.
From delivery to acceptance
NRAO VLA Archive Survey
Purchase Document Management
Presentation transcript:

1 ANASAC Meeting – May 20, 2015 Mark Lacy ALMA archive status and plans

2 ANASAC Meeting – May 20, 2015 Status Archive size and data rate The NAASC archive now contains about 90TB of data. The data rate from Cycles 1 and 2 (and future rate from Cycle 3) is only ~50TB/yr, comfortably below the Full Science specification of 200TB/yr. Our data link to Chile is 0.1Gb/s (400TB/yr). Working on making this 1Gb/s, (burstable to 10Gb/s), so capable of transferring a 1TB ALMA dataset in 2.2 (0.22) hrs. This should comfortably outpace even the highest peak data collection rates in Full Science.

3 ANASAC Meeting – May 20, 2015 Status ALMA archive query and request handler improvements since last year Request handler now shows data hierarchy. Download options are more clearly shown to the user. Angular resolution is now available both as a search and returned in the results table. “Programmatic” (command line) interface now available (though not documented). More than ~10 lines of results displayed by default.

4 ANASAC Meeting – May 20, 2015 Status Other archive-related projects Pipeline processing interface (PPI) – phase-I prototype now scheduled for end of August (see B. Glendenning talks). Use of NAASC cluster by outside, non-NRAO users being rolled out. NA-led ALMA software development programs: – CARTA viewer has prototype. – ADMIT enhanced metadata program (line IDs, previews, moment map generation etc) working on infrastructure, on track so far.

5 ANASAC Meeting – May 20, 2015 Issues Currently being worked Results table interface is still not very user friendly and needs tidying (e.g. fewer significant figures for angular resolution; angular resolution is called spatial resolution etc). 12m vs ACA vs TP observations need to be distinguished (and TP data recognized). Numerous “behind the scenes” issues such as incorrect download logging being fixed. Adding a search on largest angular scale (and returning in results table). Programmatic interface needs documentation.

6 ANASAC Meeting – May 20, 2015 Response to UC2014 Is there anything that needs addressing here? Otherwise I will hide this slide.

7 ANASAC Meeting – May 20, 2015 Next 180 Days/Future “Data tracker” will begin sending out delivery notification s automatically. Has already begun sending out s when data are 1 month from the expiration of their proprietary period. Planning has begun for rationalizing the row output in the query results table, with the aim of producing one row per source per member OUS. This is a necessary prerequisite for serving pipeline products. Planning is continuing for goal of making individual images available to users once the pipeline is producing them, and for making previews that can be downloaded from the archive interface. (Previews have been prototyped for Cycle 0 data.) Archive scientist’s F2F meeting in Santiago next month to explore these and other issues.

8 ANASAC Meeting – May 20, 2015 Example preview

9 ANASAC Meeting – May 20, 2015 Summary Archive continues to develop, though pace is slow due to lack of developer and (to a lesser extent) science staff resources. Also waiting on pipeline to produce images. Expect only incremental improvements until the pipeline is producing images for most data (late 2016?), when we will switch to serving individual images as the main products (raw data will still be available of course). Stoehr et al. ALMA archive paper published in SPIE – (arXiv: ) illustrates our long-term thinking.

10 ANASAC Meeting – May 20, science.nrao.edu The National Radio Astronomy Observatory is a facility of the National Science Foundation operated under cooperative agreement by Associated Universities, Inc.