1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review 23-24 October 2002, LBNL Brookhaven - Fermilab.

Slides:



Advertisements
Similar presentations
Issue Identification, Tracking, Escalation, and Resolution.
Advertisements

Final/Shipout Inspection Approved for Public Release.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Managing the Information Technology Resource Jerry N. Luftman
Development plan and quality plan for your Project
NASA Johnson Space Center Contracting Officer and Contracting Officer’s Technical Representative.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
WCI LEA UPDATE MAY 2, 2014 RI Department Of Education Wireless Classroom Initiative Cynthia Brown, Director Office of Statewide Efficiencies Craig Hockenbrough,
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
TAC July 2, 2003 Market Design Implementation Process Recommendation.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Version 1.0– June 18, Leveraging the Texas Project Delivery Framework and.
Foundation Financial Services Post Award Nancy Gomez Post Award Analyst.
PMP® Exam Preparation Course
Server Virtualization: Navy Network Operations Centers
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
From Research Prototype to Production
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
Company Confidential Registration Management Committee 1 Completing Independent Assessments Robert Flaharty & John Horan January 17, 2013 OP Assessor Workshop.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
US LHC Accel Proj Review October 2003 Joseph Rasson LBNL Project Manager 1 LBNL Project Overview Joseph Rasson Jon Zbasnik Bill Elliott LBNL Presented.
Module 12 Session 12.1 Visual 1 Module 12 Terminating the Project Session 12.1: Terminating the Project.
1 LHC-DFBX DFBX Production Readiness Review Project Overview Joseph Rasson LBNL October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC ACCELERATOR.
Georgia Institute of Technology CS 4320 Fall 2003.
Slide 1 ACEOLE Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator ACEOLE kick-off meeting CERN 2 October 2008.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Decision Making Process Program Planning and Control Deana Hackfeld Management Systems Office November 17, 2006.
Day 3 in the pmProject Management Project Management (PM) ADJUST.
Elementary School Administration and Management GADS 671 Section 55 and 56.
Timesheet training Version: Introduction Duration: 1.5 hours Purpose: Guide on how to use Timesheet.
1 TAC Report to the ERCOT Board November 14, 2006.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
Project Planning Goal 1 - Estimates are documented for use in tracking and planning project. Goal 2 - Project Activities and commitments planned and documented.
The Contract Management Process Post Award Activities.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Production CM QA/QC Plans and Systems Production Cryomodule Final Design Review Jamie Blowers 12-May-2015.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Accelerator Readiness Review October 31, 2006
Software Project Configuration Management
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
2K CB FDR Overview:  Agenda, Charge, Review Process
Mastering Change Control
Lockheed Martin Canada’s SMB Mentoring Program
GLAST Large Area Telescope:
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
ESSI CHANGE AND nonconformity control SYSTEM
DOE Review of the LCLS Project October 2006
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC ACCELERATOR PROJECT

2 Outline  Production Oversight  Fabrication Oversight Plan  Vendor Monitoring  Oversight Level of Effort  Change Control Procedures  Summary

3 Production Oversight Project oversight tasks:  Manage fabrication activities at LBNL  Manage current leads procurement  Transfer GFM to cryogenic vendor  Monitor fabrication, assembly and acceptance tests at cryogenic vendor  Manage Change Control Process  Update engineering drawings to include as-built modifications  Update Interface Specifications  Manage hardware and document transfer to CERN  Report status to LHC-PMO

4 Fabrication Oversight Plan  Fabrication oversight is critical to delivering a quality product on schedule  Vendor is requested to provide detailed fabrication and assembly milestones to track progress  Implement a Change Control Procedures  Plan constant monitoring of vendor performance to:  Assist in resolving fabrication issues  Insure that DFBX is given the appropriate scheduling priority  Supervise the transfer GFM to the vendor  Witness critical assembly processes  Witness inspection tests  Manage change control process

5 Vendor Monitoring  Frequent visits to vendor fabrication facility  MTM is within a driving distance to FNAL  Will consider retaining professional QA support from local firms if PHPK wins the award  LBNL representative will have unrestricted access to the Subcontractor facility during normal working hours  Subcontractor will provide office space to LBNL representative

6 Vendor Monitoring (cont.)  Request Reports and Scheduled Meetings  Post Award Conference to kick-off DFBX production  Monthly Progress reports  Monthly meetings at the vendor’s facility to review Progress  Weekly phone or video conference meetings to review status  Meetings to be attended by Subcontractor’s Project Manager and lead engineer

7 Oversight Level of Effort  Fabrication oversight will be made up of LBNL and FNAL staff  The balance between LBNL and FNAL will depend on who the location of the vendor  DFBX Project Engineer is committed to stay with project throughout the production phase  On the average 2 FTE’s are available for project management and production oversight

8 DFBX Oversight Level of Effort

9 Change Control Procedures  Established project change control procedures to manage production cost and schedule  Change Control Procedures is a supplemental document to LBNL-LHC QA Plan  Procedures apply to LBNL or vendor generated change requests  Procedures insure that documents and drawings are updated and archived in the Document Control Center  Change requests that impact cost or schedule will be communicated to the vendor by LBNL Procurement Officer  Process flow charts and forms are available and being reviewed

10 LBNL Generated Changes Engineering Design Change initiated at LBNL or FNAL Design Change Notice Form submitted to DFBX Project Engineer for approval No further action taken Does change affect an in-house or an outside fab? Project Engineer issues an RFI to vendor to determine cost and/or schedule impact Project Engineer negotiates technical issues of change with fabrication vendor Is cost change more than $5k? Project Engineer makes changes to drawings and/or specifications Submitted to FNAL PM Office for approval Project Engineer requests Procurement Officer to issue contract mods (outside only) No further action taken Revised drawings and/or specifications filed in the Document Control Center Hardware is fabricated based on new prints and/or specifications AcceptedRejectedIn-house Outside >$5k <$5k Accepted Rejected

11 Vendor Generated Changes (1) Vendor identifies inconsistencies in LBNL drawings or specifications Vendor issues a Corrective Action Report Project Engineer makes changes to drawings and/or specifications Project Engineer requests Procurement Officer to issue contract modifications Revised drawings and/or specifications filed in the Document Control Center Hardware is fabricated based on new prints and/or specifications Report reviewed by LBNL Project Engineer for approval Is cost change more than $5k? Submitted to FNAL PM Office for approval AcceptedRejected >$5k <$5k Accepted Rejected No further action taken No further action taken

12 Vendor Generated Changes (2) Vendor identifies potential changes to simplify a fabrication or assembly Vendor issues a Deviation Request Project Engineer makes changes to drawings and/or specifications Project Engineer requests Procurement Officer to issue contract modifications Revised drawings and/or specifications filed in the Document Control Center Hardware is fabricated based on new prints and/or specifications Request reviewed by LBNL Project Engineer for approval Is cost change more than $5k? Submitted to FNAL PM Office for approval AcceptedRejected >$5k <$5k Accepted Rejected No further action taken No further action taken

13 Vendor Generated Changes (3) Inspected parts or assemblies do not conform to drawings and/or specifications Vendor issues a Nonconformance Report Project Engineer makes changes to drawings and/or specifications Project Engineer requests Procurement Officer to issue contract modifications Revised drawings and/or specifications filed in the Document Control Center Hardware is reworked based on new prints and/or specifications Project Engineer & Material Review Board determine necessary action Is there a cost impact? Use as is Scrap No Yes Reject and scrap parts No further action taken Rework Project Engineer requests Procurement Officer to issue contract modifications

14 LBNL Design Change Notice Form

15 Deviation Report

16 Summary  Fabrication oversight plan has been developed and being reviewed  LBNL and Fermilab will play active roles in oversight activities  Change Control Procedures and forms have been developed  Tailor fabrication oversight plan to vendor  Changes that impact cost or schedule will be communicated to vendor through LBNL Procurement Officer