RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA 94720 MICO Weekly Phone Meeting March 21, 2011.

Similar presentations


Presentation on theme: "RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA 94720 MICO Weekly Phone Meeting March 21, 2011."— Presentation transcript:

1 RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA 94720 MICO Weekly Phone Meeting March 21, 2011

2 RFCC Module Update (1/2) Coupling coil magnets Coupling coil magnets – Weekly RFCC meeting at LBNL N. Li (LBNL engineer) reported her China trip: QH and SINAP visit N. Li (LBNL engineer) reported her China trip: QH and SINAP visit – Qi-Huan already provided winding procedures and waiting for final cryostat drawings – SINAP continues working on the cryostat design drawings and schedule to deliver to LBNL by end of March 2011 – LBNL will take over the responsibility and control of the cryostat design after March 2011 » Purchase of SOLID-EDGE-T (software) to review, modify and translate the drawings from SINAP (up to four weeks: need help from MICE and collaborators for the drawing review); » Any necessary modifications to the SINAP drawings; » Communications with Qi-Huan and HIT; » Design and assembly review (when and where?). Delivered Single Cavity Vessel Design to Fermilab Delivered Single Cavity Vessel Design to Fermilab – Internal review and RFQ New MICE RF postdoc opening at University of Mississippi posted New MICE RF postdoc opening at University of Mississippi posted

3 RFCC Module Update (2/2) – Cryostat design at SINAP Expect to finish and send the final drawing to LBNL by end of March Expect to finish and send the final drawing to LBNL by end of March – A new engineer joined the effort – Progress at HIT Sent the welding test raw data to LBNL Sent the welding test raw data to LBNL – Need further documentation and analysis Propose to host a meeting at Qi Huan at end of March 2011 to assess the current status of the CC magnets: Propose to host a meeting at Qi Huan at end of March 2011 to assess the current status of the CC magnets: Schedule Schedule Budget and resources Budget and resources Any technical issues Any technical issues … We plan to join the meeting by Skype if possible We plan to join the meeting by Skype if possible