ATLAS FP TRACKER PLANS Steve Watts School of Physics and Astronomy University of Manchester Well defined design in the FP420 Design Report Based on the.

Slides:



Advertisements
Similar presentations
New Operation Scenarios for Severely Irradiated Silicon Detectors G. Casse University of Liverpool 1 VERTEX 2009, Mooi Veluwe (NL) September 2009.
Advertisements

23 Jul 2008Paul Dauncey1 TPAC 1.1 vs TPAC2.0 vs TPAC2.1 Paul Dauncey.
Development of an Active Pixel Sensor Vertex Detector H. Matis, F. Bieser, G. Rai, F. Retiere, S. Wurzel, H. Wieman, E. Yamamato, LBNL S. Kleinfelder,
UK – quad module. Experience with FE-I4 UK groups relatively new to ATLAS pixel Have 5 USBPix systems up and running now – Glasgow, Edinburgh, Manchester,
For the RD42 Collaboration
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
February 8 th, 2001 Status Report: SciFi for MICE Edward McKigney Imperial College London.
AFP STATUS REPORT – WHERE ARE WE ???? Steve Watts We have spent the last year being reviewed. Decision and letter from ATLAS EB November Proceed.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
IEEE08/NSS R. Kass N Radiation-Hard/High-Speed Data Transmission Using Optical Links W. Fernando, K.K. Gan, A. Law, H.P. Kagan, R.D. Kass, J. Moore,
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
Development of an ASIC for reading out CCDS at the vertex detector of the International Linear Collider Presenter: Peter Murray ASIC Design Group Science.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
ATLAS micromegas activities (MAMMA)
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
LCWS08, Chicago, November 2008 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Active Pixel Sensors - Status and Plans - Ladislav Andricek for the DEPFET.
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Gossip/GridPix – guidelines, facts, and questions for review Version 1: Norbert Version 2: Tatsuo Version 3: Werner.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
Transition to cables Staves Services IP Underside of stave: IBL modules IBL Design.
UK Bump Bonding (Flip-chip) Meeting at Daresbury (15th May): Tentative Agenda 10:00 Coffee Introduction and Welcome: Phil Allport (Liverpool) 10:40.
MIMO  3 Preliminary Test Results. MIMOSTAR 2 16/05/2007 MimoStar3 Status Evaluation of MimoStar2 chip  Test in Laboratory.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
1 Performance of a CCD tracker at room temperature T. Tsukamoto (Saga Univ.) T. Kuniya, H. Watanabe (Saga Univ.); A. Miyamoto, Y. Sugimoto (KEK); S. Takahashi,
ACES Mar 2007Geoff Hall1 System level requirements for upgraded tracker.
March 14, 2016 Report on SMU R&D work1 Link-On-Chip (LOC) 1st Prototype  Status:  Prototype chip with the clock unit (PLL), serializer, laser driver,
Irradiated 3D sensor testbeam results Alex Krzywda On behalf of CMS 3D collaboration Purdue University March 15, 2012.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
TILC08, Sendai, March DEPFET Active Pixel Sensors for the ILC Marcel Vos for the DEPFET Collaboration (
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
Manchester, 24/02/2010 G.-F. Dalla Betta The common floor-plan of the ATLAS IBL 3D sensor prototypes Gian-Franco Dalla Betta (Univ. Trento and INFN) for.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
The timing upgrade project of the TOTEM Roman Pot detectors
Tracking detectors/2 F.Riggi.
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Available detectors in Liverpool
HPS: R&D issues Krzysztof Piotrzkowski (UCLouvain/CERN)
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Micro-channel Cooling
Strawman module design
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
Rita De Masi IPHC-Strasbourg on behalf of the IPHC-IRFU collaboration
R&D status of pixel sensors based on SOI technology
HVCMOS Detectors – Overview
Status of CCD Vertex Detector R&D for GLC
Physics event timing Use Pythia to generate hadronic decays at 125 GeV
Presentation transcript:

ATLAS FP TRACKER PLANS Steve Watts School of Physics and Astronomy University of Manchester Well defined design in the FP420 Design Report Based on the FE-I3 ATLAS Pixel Readout chip. Design suitable for 220 but needs roughly double the number of sensors. Layout is more difficult and power dissipation is higher. Radiation level close to beam is very high. Implications for the readout chip. Sensor is good to charged hadrons cm MRad Consequence – New Design for the Tracker…… R&D is linked to 3D sensor developments for IBL and SLHC

220 m 420 m

FE-I3 Lifetime issue charged particles per cm 2 or ~30 Mrad SOLUTION A 3D sensor safe to charged hadrons per cm 2 Dose highest in very narrow vertical band. Move sensors up and down by 1-2 mm to even out the dose Trick used with CCDs in NA32. Additional specification for mechanical design. Would give a factor 3.

New FE-I4 –Pixel size = 250 x 50 µm 2 –Pixels = 80 x 336 –Technology = 0.13µm –Power = 0.5 W/cm 2 FE-I4 Design Status –Contribution from 5 laboratories. –Main blocks MPW submitted in Spring –Full FE-I4 Review: 2/3/3009 –Submission in Summer 2009 –Expect IBL modules late mm 8mmactive 2.8mm FE-I3 74% 20.2mm active 16.8mm ~2mm ~200 μ m FE-I4 ~89% Chartered reticule (24 x 32) IBM reticule ~19 mm FE-I3 - lifetime issue Solution B Use FE-I4. Factor 5 more radiation tolerant than FE-I3. For IBL project Plus - better matched to track hit distribution at Common module design for 220 and x Fe-I4 each plane

NOTE: IMPROVED Y-Measurement. Consequence for physics ??? NOTE2: Assumes hits distribution stable with time…..

FE-I3 versus FE-I4 FE-I3 run had very poor yield. There will be another run in FE-I4 First run will produce chips in summer/Autumn 2010 ASIC designs always take more than one iteration. FE-I4 3D sensor is larger and thus yields will be lower. Conclusion FE-I4 baseline. There will be 3D/FE-I4 detectors developed for IBL. Mechanics/electronics engineers to look at FE-I4 design. FE-I4 - common 220/420 mechanics design