MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.

Slides:



Advertisements
Similar presentations
Beam Test of a High-Pressure GH 2 -Filled RF Cavity (for efficient muon beam cooling for a MC or NF, since the low-Z ionization energy-loss absorber and.
Advertisements

MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
The Muon Accelerator Program “High”- Gradient Normal Conducting RF R&D Alan BrossUS HG Workshop February 9-10, Meeting the RF in Magnetic Field Challenge.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
MICE LH2 Operating Parameters Mary Anne Cummings MICE October ‘02 LBL Oct. 24, 2002.
MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002.
2/7/2002 RolMUCOOL/MICE1 20b. Gaseous Energy Absorber, 21a. High Pressure RF Cavities New Money for New Approaches DOE Small Business Innovation Research.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
LH2 Absorber Heat Load and Homeostasis. What has happened before… 1.Huge LH2 volumes, low heat deposition: Bubble chambers 2.Small LH2 volumes, low heat.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MUTAC Review 3/16/06 A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC Review March 16, 2006 A. Bross.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
MuCool Test Area RF Workshop 111/15/2010 Muons, Inc. Loaded Pillbox Cavity Milorad Popovic & Katheryn Decker French (with Mike, Chuck, Katsuya, Al and.
CMPB Alain Blondel 14 April STATUS OF MICE.
Overview of Experiment and Parameter Choices presented by Giles Barr.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Mahzad - 8/9/2007 AAC Presentation 1 High Pressure RF Studies Mahzad BastaniNejad Muons, Inc., Old Dominion University Muons, Inc.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
1 Alan Bross MUTAC April 9, 2008 MuCool Program Overview Muon Cooling R&D Alan Bross.
The Neutrino Factory and Muon Collider Collaboration R&D Program and Participation in the IDS.
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
Fast TOF for Muon Cooling Experiments Robert Abrams Muons, inc.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
A. Bross MUTAC Meeting BNL April MuCool Overview Muon Cooling R&D Alan Bross.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
MICE: The International Muon Ionization Cooling Experiment Ulisse Bravar University of Oxford ICHEP ‘04 1 MICE: The International Muon Ionization Cooling.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
Topical workshop on The Neutrino Factory and Muon Collider Oct 2007 RF Systems for a Neutrino Factory Rebecca Seviour Cockcroft Institute Lancaster University.
RF studies at Fermilab MuCool Test Area Fermilab MuCool Test Area MuCool Test Area (MTA) at Fermilab is a dedicated facility at the end of the LINAC built.
Recent progress of RF cavity study at Mucool Test Area Katsuya Yonehara APC, Fermilab 1.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
NFMCC Meeting 3/12/06 A. Bross MuCool Overview Muon Cooling R&D NFMCC Meeting March 12, 2006 A. Bross.
DOE Program Review 5/17/06 A. Bross Muon Accelerator R&D DOE Program Review May 17, 2006 A. Bross.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
NFMCC Meeting 3/12/06 A. Bross LiH Absorbers Muon Cooling R&D NFMCC Meeting March 12, 2006 A. Bross.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
Dazhang Huang MUTAC Review LBNL, April 2008 Fermilab MTA 805 MHz RF Program.
MUTAC 04 - April A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC 04 A. Bross.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
RF R&D (Issues) for Muon Ionization Cooling Channels
Completion of the MICE-US construction project
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
M. Migliorati, C. Vaccarezza INFN - LNF
BriXS – MariX WG 8,9 LASA December 13, 2017.
Presentation transcript:

MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross

MCTF 8/17/06 A. Bross MuCool Program  Currently consists of 9 institutions from the US and Japan RF Development ANL Fermilab IIT JLAB LBNL Mississippi Absorber R&D Fermilab IIT KEK NIU Mississippi Osaka Solenoids LBNL Mississippi  Mission u Design, prototype and test all cooling channel components (SFOFO) u 201 MHz RF Cavities, absorbers, SC solenoids u Support MICE (cooling demonstration experiment) u Perform high beam-power engineering test of cooling section components

MCTF 8/17/06 A. Bross  R&D Focus of MuCool u Component testing Fermilab s RF Cavities –High RF-power Testing s Absorbers –Technology tests –High power-load testing With beam s Magnets

MCTF 8/17/06 A. Bross MuCool Test Area  Facility to test all components of cooling channel (not a test of ionization cooling) u At high beam power s Designed to accommodate full Linac Beam s 1.6 X Hz – 2.4 X p/s –  600 W into 35 cm LH MeV u RF power from Linac (201 and 805 MHz test stands) s Waveguides pipe power to MTA

MCTF 8/17/06 A. Bross MTA Hall

MCTF 8/17/06 A. Bross MTA  The MTA is the focus of our Activities u RF testing (805 and 201 MHz) u High pressure H 2 gas- filled RF u LH 2 Absorber tests  Two parts of infrastructure yet to be completed u Cryo Plant u Beam Line

MCTF 8/17/06 A. Bross Phase I of RF Cavity Closed Cell Magnetic Field Studies (805 MHz)  Data seem to follow universal curve u Max stable gradient degrades quickly with B field  Sparking limits max gradient  Copper surfaces the problem Gradient in MV/m Peak Magnetic Field in T at the Window

MCTF 8/17/06 A. Bross Phase II of 805 MHz studies  Study breakdown and dark current characteristics as function of gradient and applied B field in Pillbox cavity u Curved Be window Test s TiN coated s Cavity has been conditioned to 32MV/m without B field s Measurements at 2.5T –So Far – stable gradient limited to about 14MV/m u Button test s Evaluate various materials and coatings s Quick Change over

MCTF 8/17/06 A. Bross RF R&D – 201 MHz Cavity Design  The 201 MHz Cavity is now operating u Recently reached 16MV/m at B=0 (design gradient!)

MCTF 8/17/06 A. Bross  2D Transverse Cooling and  Figure of merit: M=L R dE  /ds M 2 (4D cooling) for different absorbers Absorber Design Issues H 2 is clearly Best - Neglecting Engineering Issues Windows, Safety

MCTF 8/17/06 A. Bross Convective Absorber Activities  First Round of studies of the KEK absorber performed in the MTA u GHe used to input power

MCTF 8/17/06 A. Bross Convective Absorber Activities II

MCTF 8/17/06 A. Bross Convective Absorber Activities III  Next Round of tests will use a modified absorber  Test u Electrical Heater u New Temperature sensors u LH liquid level sensor Absorber Body being modified in Lab 6 at Fermilab Instrumentation will be used in MICE

MCTF 8/17/06 A. Bross MuCool and MICE  Muon Ionization Cooling Experiment (MICE) u Demonstration of “Study II” cooling channel concept s Has Phase I UK funding ($20M)  MuCool Collaboration interface to MICE u Design Optimization/develop of Study II cooling channel s Simulations u Detailed engineering s Full component design s Systems integration s Safety u RF cavity development, fabrication, and test u Absorber development, fabrication, and test u Development of beam line instrumentation u MuCool will prototype and test cooling hardware including MICE pieces for which the collaboration is responsible  Fermilab is also contributing to the cryogenics and readout electronics for the two fiber trackers used in the spectrometers.

MCTF 8/17/06 A. Bross MTA recent activities  Due to Tritium problem from Numi u Our cooling water feed for the MTA hall was changed to Casey’s pond s Introduced some problems that have now been remedied  LHe delivery system for magnet has been upgraded u Heat load now at spec  5T Solenoid has been re-trained u Now operates at spec  Instrumentation Installed u Spark protection for 201 cavity s Includes video camera and DVR u Scintillation counters s Now have complete coverage for 805 and 201 systems s Includes thin and thick Plastic counters and NaI

MCTF 8/17/06 A. Bross Plans for the MTA  805 MHz RF studies (with and without B field) u Long-term (1 week) conditioning at fixed gradient and 2.5T u Be Window tests u Materials tests u Surface treatment  201 MHz RF test program u B field tests s Conditioning to highest possible gradient (up 16MV/m) at max field available from magnet u Curved Be Windows u Note: The 201 MHz power source from the Linac has been offline since before the end of the shutdown s Hope to have it available for our program in the next week or two  Second round of tests with KEK LH 2 convective absorber 201 MHz RF is Highest Priority!