P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.

Slides:



Advertisements
Similar presentations
Software for Quantity estimation and Project management.
Advertisements

Project Control: Developing the As-Planned S-Curves
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Project Planning: Assembling a Mortenson “Integrated Work Plan”
COST EFFECTIVE SOFTWARES IN ENGINEERING
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
AN-NAJAH NATIONAL UNIVERSITY FUCULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT GRADUATION PROJECT CONSTRUCTION PROJECT MANAGEMENT (Value Engineering)
Taking off and ESTIMATING
E STIMATION 1 Excavation 2 lesson 5. E XCAVATION 2 Recap from excavation 1 Looking at site plans Desk top study Site Visit Unit pricing of excavation.
Chapter 3 Measuring Excavation and Sitework
An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh.
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
The Gantt Chart in Project Management. What is a Gantt Chart?  A type of chart that shows the Work Breakdown Structure (WBS) in terms of the start and.
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Construction Engineering 221 Cost Estimating and Bidding.
EM15 – Contractors COST MANAGEMENT
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Specification & Quantities Estimating
Construction PROJECT MANAGEMENT Supervisor : E. Barraq Jumaa Prepared by: Ahmad Faqra Amjad Zarour Nidal Haroon.
Construction Project Management “Tubas Governmental Hospital” Prepared by: Asma’a Abu-Aqel Naheel Al-Naser Presented to: Ir: Barraq Jumaa.
 The assigned project is student’s schools which located in YABED; it was designed by Tubealh offices of the engineering design.  The contractor by.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
C ONSTRUCTION PROJECT MANAGEMENT Submitted in partial fulfillment of construction project management for the bachelor degree in civil engineering Fuad.
Measuring Palestinian labors productivity Rates for Block, Steel and excavation works Measuring Palestinian labors productivity Rates for Block, Steel.
1 8. I MPLEMENTING THE P LAN Objective: To understand the principles of successfully implementing a plan, by communicating the plan to key site personnel,
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
What is the “Project”? A temporary endeavor undertaken to create a unique product or service.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
Keith Roberts, P.E. Project Implementation Engineer IDOT – District 9.
University of Calgary Continuing Education
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
Construction Planning and Estimating Construction Technology I Module 2 part 2.
The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept.
Measuring Palestinian Labors Productivity
Construction Project management
Construction Project Management
Construction Project Management
An-Najah National University
An-Najah National University
Construction Project Management
What is the best method for constructing schools in Palestine ?
Construction Project Management
Construction Project management
Awarding Criterion for late tender: the lowest bid- why?
Project Scheduling – Critical Path Method (CPM)
In-Class Scheduling Exercise
Civil Engineering Department
6th. Semester Schedule: 1st. Week
An-Najah National University Faculty Of Engineering civil Department
Muskat Secondary School Project
Presentation transcript:

P ROJECT M ANAGEMENT

Case study Assumptions Methodology Discussion

Project title: Continues Education Building. Project Location: Palestine-Tulkarem Implemented by: PTU- kadoorie Financed by: German Palestinian Development Cooperation, (KFW) and (UNDP) Contractor: Zeta Company for Contracting Designer: (A.E.G) Supervisor: PTU & UNDP

Project Delivery Systems: Design-Bid-Build (DBB). Type of the contract: Unit price. The project total area: Is 700 m2. Bid Price: 1,745,685 NIS Project duration (as the bid documents): 9 months

The project will performed by a local construction company. Working day = 8 hours Working days are all days except Fridays and holidays. The electrical and mechanical work done by sub- contractor. Contract will be calculated in Shekels. Limited resources, no need for resource levelling The calculation made as a contractor’s.

Creating the WBS of the project Developing activity list Surveying quantities Estimating durations & time schedule: Cost estimating

Continues Education Building Substructure Site preparation Earth worksFoundationsSuperstructure Structural Elemnts Finishing

AutoCAD, Excel Bills of quantities, Design Drawings. Contractor’s calculations – Factor of waste – Earth works Paints, mortar and plaster materials

Using primavera Determining relationships Critical path method

Critical Activities: Soil Test Excavation works Footings Column's Necks (C.N) Ground Beams (G.B) Backfill and compaction works Slab on grade (S.G) Columns SlabBlock works Plastering works Tiless works Painting works

153 working days 184 calendar days The project starts at 12/4/2011 and ends at 12/10/2011 [As our schedule]

Material Labor Equipment Price

The cost of mechanical works = 129,550 NIS The cost of electrical works = 267,990 NIS The cost of structural works = 936,910 NIS The price of the project= 1,766,920NIS The Total cost of the project = 1,330,260 NIS

Bid price is 1,745,685 NIS. Bid project duration is 9 months. Our estimated price 1,766,920 NIS. Our scheduled time 6 months. Delay of the project Low quality

T HANK YOU