Tunnel Gallery Girders 5 6 7 9 10 11 12 13 14 15 1 x ADC’s HV Power supply Rack 095 8 channels digitizer VME module (SIS3300), 12 bits 96.

Slides:



Advertisements
Similar presentations
12/02/2013 Gerrit Jan Focker, BE/BI/PM 1 WireGrid electronics in the Linac 4 tunnel.
Advertisements

The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
BLM Test Results 22 October SIC, Faraday cup and 2 cables mounted on Girder 5.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
(BI) Needs and Experience with Cameras in Radioactive Environment Stephane Burger BE BI-PM BI review on Radiation development and testing 22 nd of November.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
8 Channel Fiber Optically Linked Data Acquisition System for Booster Modulators Tsatsu Nyamadi Norfolk State University Supervisor Rene Padilla Fermilab.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
Beam diagnostics in the beamlines
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
DEVELOPMENT OF A BEAM LOSS DETECTION SYSTEM FOR THE CLIC TEST FACILITY 3 T. Lefevre Beam loss monitors for the CLIC Test Facility 3 Preliminary study done.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
WELCOME TO IHEP. RF Phase Control for BEPCII Linac Accelerator Wenchun Gao.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Beam Loss Monitor Yoshinori Sato (KEK, IPNS) Target & Monitor Sub-Group.
SEM SIC SEM SIC 2 SEMs & 2 SICs closed to the Dumps 1 SIC, 1 Faraday cup & 1 SEM SEM SIC F. cup 4 similar set-ups : Girder 6,7,11 and 13 4 th – 8 th October.
BLM FOR THE INJECTORS PROJECT LINAC4 & PSB Beam Instrumentation Review – 18/10/2011 Christos Zamantzas
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
ORNL is managed by UT-Battelle for the US Department of Energy Low Level RF Status and Development Activities at the Spallation Neutron Source Mark Crofford.
Report Technical Director Storage-Ring-Installation Completed
LHCb Outer Tracker Electronics 40MHz Upgrade
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
Calorimeter Mu2e Development electronics Front-end Review
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Analog FE circuitry simulation
Injectors BLM system: PS Ring installation at EYETS
Ewald Effinger, Bernd Dehning
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
352MHz Klystron Control for the 3MeV Linac test stand
ELENA tune measurement
Controls CBETA controls will extend existing EPICS control system
GlueX Electronics Review Jefferson Lab July 23-24, 2003
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Front-end electronic system for large area photomultipliers readout
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Combiner functionalities
Use of Beam Loss Monitor type detectors in CNGS muon station
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
Status of muon monitor R&D and construction
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Explanation of the Basic Principles and Goals
RF introduction Anders Sunesson RF group leader
Breakout Session SC3 – Undulator
Presentation transcript:

Tunnel Gallery Girders x ADC’s HV Power supply Rack channels digitizer VME module (SIS3300), 12 bits 96 MHz with up to 256 ksamples extendable to 1024 ksamples HV channels (0-2kV, 3mA) 10 BLM systems to be installed in the CTF3 linac : 1 per section (or girder) Each system is composed by 4 detectors. All the detectors is supplied in parallel by the same high voltage unit. Each system has its own amplifier card and provides 4 signals to the ADC’s e-e- Injector T. Lefevre BLM Linac system in 2004 Amplifier Card 4 channels, 300MHz, 26/46dB Amplication Card

Electronic & power supply in the Gallery ADC’s (30690CHF) Timing (paid by CERN) High voltage power supply (4100CHF) Cables from the tunnel ( = 40215CHF) T. Lefevre

Electronic & power supply in the tunnel High voltage from the gallery SIC Signals Amplifier box Signals to the ADC’s High voltages to the SIC Price : 7090CHF

Overview of the linac system SiC inside EM shielding box Beam tube or Accelerating cavity - The support is clamped on the beam girder so that we can move it at any Z position - The detector positions can be also adjusted transversely - The supports are made both in alumina and fiber glass with epoxy resin for the electrical insulation Mechanical Support T. Lefevre

SIC assembly & its mechanical support (3338CHF)(7757CHF) Mechanical Support T. Lefevre

The design can be found in the following autocad files : The system has been made in Spain (Solpey Inc.) : Contact :MALZACKER J.Marc CERN,Division TS/MME/MS BAT:72R010 Tel: Portable: BLM Mechanical Support T. Lefevre

BLM Cables SignalsHigh VoltageAmplifier power supplyLength Girder m Girder m Girder m Girder m Girder m Girder m Girder m Girder m Girder m Girder m Girder m Girder m

T. Lefevre BLM Cables Cabling is provided by CERN Contact :Gaidon Michele CERN,Division BAT: Tel: Portable:

T. Lefevre 4 channels Fast Amplifier Card 300MHz 26 to 46dB amplification

T. Lefevre Design made by M. Gasior Electronic card realized by the CERN electronic pool: Contact: Betty Magnin Schematics of the PCB card to be found on the CERN/EDMS website at 4 channels Fast Amplifier Card Price : 5907CHF

T. Lefevre 4 channels Fast Amplifier Card

Price estimate T. Lefevre Beam Loss Monitoring system: 12 BLM units  110kCHF Detectors : (48) 15kCHF Cables : 30kCHF Power supply : 2kCHF Mechanical support : 7.4kCHF Amplifier electronic + cables : 6kCHF + 15kCHF ADC’s : 30kCHF Total Material cost = 99100CHF + price of the SIC In summary