MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

Line Efficiency     Percentage Month Today’s Date
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
MOM report 23/9 – 28/9 G.CECCHET. MOM report Hall PPS commissioning Target tests last night MOM laptop.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICE FAC Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MOM Report. Shield Wall – Gone Before During After 2.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
MOM Report Victoria Blackmore VC /06/11 1/7.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Linda Coney MICO June 6, 2011 MICE Online Report.
Target Installation Plan
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Olathe South ACT Timeline
Project Manager’s Report + DC/MoM Report
Primary Longman Elect 3A Chapter 5 Asking about dates.
MICE PM Report Progress with the Infrastructure A few problems
Completing the Step IV Programme
RAASA Report 04 September 2017

FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March

JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Event Plan & Meeting Schedule
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
TEL031 ODL Analytics Main Activities
Presentation transcript:

MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8

MOM Schedule MICE Operations ManagerStarting DateEnding Date Alain Blondel and Victoria BlackmoreMo 17 JanTu 15 Feb Ray GametMo 14 FebTu 1st Mar Paul HodgsonMo 28 FebTu 29 Mar Paul SolerMo 28 MarTu 12 Apr Victoria BlackmoreMo 11 AprTu 26 Apr Linda ConeyMo 25 AprTu 24 May Yağmur TorunMo 23 MayTu 7 June Victoria BlackmoreMo 6 JuneTu 5 July Yağmur TorunMo 4 JulyTu 19 July Pierrick HanletMo 18 JulTu 16 Aug Roumen TsenovMo 15 AugTu 13 Sep Linda ConeyMo 12 SepTu 27 Sep Giorgio CecchetMo 26 SepTu 25 Oct Linda ConeyMo 24 OctTu 22 Nov Yordan KaradzhovMo 21 Nov23 Dec (End of RUN + 1 day) VC-139: 14/04/112/8

MICE Shift (24/03/11) Shift went well, most systems tested.. Dry run for PPS in Hall: Full walkthrough Hall under MICE control Need intercom and documentation Licensing 1 st June Full beamline/DAQ test BPM not able to be tested. HV misconfigured after EPICS tests. Two CAEN SY127 crates and CAEN SY527 were meant to be daisychained together. CAEN SY527 still out for repair CAEN SY127 crates now connected together (as instructed by Pierrick) VC-139: 14/04/113/8

Rack Room Henry removed MICE DAQ PCs from their rack (grid data mover PC, micestore, miceacq* servers and DAQ KVM system). Currently in R76. Old rack has been moved, new one installed. PCs will be moved back v. soon (today/tomorrow). Consequences: No data taking until they’ve been reinstalled. KVM box has been removed, so machines connecting through it need a local keyboard and monitor (miceraid1&2, micecss1, micepps2, targetctl1) No backups of eLog, MICEmine (micestore removed) Cannot test BPM again until systems reinstalled. VC-139: 14/04/114/8

Target in R78 (T2.6) Ran successfully for 1.14M actuations Started getting stuck (theory: thermal expansion of bearings) Target dismantled on 05/04/11 for inspection (note: no dust seen) Target now back in R78 with (ever so) slightly looser bearings as of 13/04/11 Target stopped daily between 11am to 12pm for a more realistic test of its performance VC-139: 14/04/115/8

Magnets & Hydrogen System Beam magnets Water tank on roof had a leak in the trench (next to air receiver) -- fixed by John Govans Q6 water still off until repaired (next week!) Hydrogen system Matt Hills is commissioning the hydrogen system with the test cryostat. Hydrogen line developed a leak, now located (theory: ice in the system?) Fixing this is in hand (Mike Courthold/Matt Hills) VC-139: 14/04/116/8

Future Work Lots happening in the Hall Hydrogen system testing, new floor installation… Preparation for ISIS shutdown next week and access to the DSA. Substation upgrade soon! Hall will be without power for a few weeks in May VC-139: 14/04/117/8

Run Plan ISIS schedule: 1 March – 14 April 2011: ISIS run 15 April – 17 April 2011: machine physics 18 April – 1 May 2011: Easter shutdown 2 May – 8 May: run up and machine physics 9 May 2011: machine permits 10 May – 9 June 2011: ISIS run 10 June – 12 June 2011: machine physics 13 June – 26 June 2011: shutdown 27 June – 3 July: run up and machine physics 4 July 2011: machine permits 5 July – 4 August 2011: ISIS run 5 August – 7 August 2011: machine physics 8 August – 4 September 2011: shutdown? (subject to change) VC-139: 14/04/118/8