CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

LAV front-end board test
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
1Domenico Di Filippo CHANTI Update and High rate effects Fabio Ambrosino, Tiziana Capussela, Michele Corvino (B.Sc.), Domenico Di Filippo, Paolo Massarotti,
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
VELO ADC vs Charge Calibration Jianchun Wang April 16, 2008 This is an update to the presentation at April 11 st VELO Group Meeting. A new scan data of.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Laura Gonella ATLAS-CMS Power Working Group, 08/02/2011
Uni Bergen:G. Eigen, J. Zalieckas, E. van der Kraaij FZU Prague: J. Cvach, J. Kvasnicka, I. Polák CALICE meeting, Argonne, 19/03/2014.
Saturation in V-calib LED scans CALICE AHCAL – Main Meeting 2010/07/05 Jaroslav Zalesak analysis still in progress but gives global results FNAL & CERN.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
HBD HV Control and Monitoring System PHENIX Manuel Proissl HBD Meeting 12/09/2008.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
CHANTI status F.A., C. Annunziatella*, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra**, M. Napolitano, L. Roscilli, G. Saracino Università degli.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Update on CHANTI F.Ambrosino, M.B. Brunetti*, F. Canfora*, T. Capussela**, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
LAV status report for the NA62 LAV working group Preliminary test beam results Future activities Progress on simulation A. Antonelli INFN-LNF SPSC meeting.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
M. LefebvreATLAS LAr week, November 19th HEC-EMEC beam test data analysis Filtering weight synchronization and timing issues TDC timing Cubic timing.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AIDA update Steve Thomas ASIC Design Group 9 December 2008.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
SEM SIC SEM SIC 2 SEMs & 2 SICs closed to the Dumps 1 SIC, 1 Faraday cup & 1 SEM SEM SIC F. cup 4 similar set-ups : Girder 6,7,11 and 13 4 th – 8 th October.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
Peter Križan, Ljubljana September 17, 2008 SuperB PID Peter Križan University of Ljubljana and J. Stefan Institute Forward PID: - SiPM as photon detectors.
TIMING DETECTOR ELECTRONICS FRONT END ELECTRONICS - NINO JOSE DA SILVA –CT-PPS TIMING ENGINEERING REVIEW /
HE FEE Boards production status 26 th May 2016 Mandakini Patil 1.
Study of the Radiation Damage of Hamamatsu Silicon Photo Multipliers Wander Baldini Istituto Nazionale di Fisica Nucleare and Universita’ degli Studi di.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
INSIDE in-beam PET system assembly and test at INFN Torino
LKr status R. Fantechi.
EZDC spectra reconstruction and calibration
CTA-LST meeting February 2015
Vito Palladino Straw Working Group 23/3/2015
Mini-drawers, FE-ASIC , Integrator
RPC FEE The discriminator boards TDC boards Cost schedule.
MEG II実験 液体キセノン検出器の建設状況
Presentation transcript:

CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino

Outlook Construction & installation CHANTI-FE boards calibration and tests ToT boards calibration and tests Progress on DCS Commissioning schedule To do list Conclusions

Construction All of the six stations have been fully assembled and cabled All of the 300 SiPMs have been tested for funtionality. A subset (25%) tested at diferent temperatures to compare temperature behaviour wrt Hamamatsu specs All of the connections with SiPMs and Pt100 probes checked before assembly

Construction (2)

Construction (3)

Construction (4)

Installation CHANTI stations aligned in Napoli to +- 0,5 mm. The last CHANTI station has adjustable feet to this aim. Check of alignment re-done at CERN after transportation. Installation on the beam line and survey successful.

Installation (2)

Installation (3) Small problem with the o-ring prevented us to complete the cabling and install the signal flanges. This will be done during the September 15th week.

CHANTI ToT boards: requests All the TOT mezzanines for the CHANTI have been modified in order to obtain G = 2 Hysteresis of the order of 5 mV Hysteresis corresponding to a lower threshold on the rising edge of the signal signal threshold hysteresis

Modified mezzanines: test All the 160 CHANTI mezzanines, corresponding to 640 channels, have been tested. ToT is evaluated with two different pulses, (mirror pulses), as a function of the threshold. In this way the value of the hysteresis and the threshold calibration parameters can be obtained. 50 ns10 ns 50 ns10 ns

Hyst(mv) Modified mezzanines: results All the 160 CHANTI-TOT mezzanines, corresponding to 640 channels, have been tested and only 7 of them are not good (already sent to the Artel for repair). We have however enough good channels for the full CHANTI instrumentation. The hysteresis is in agreement with the requests

Slope(mV/DAC)x10 -1 All the 160 CHANTI-TOT mezzanines, corresponding to 640 channels, have been tested and only 7 of them are not good (already sent to the Artel for repair). We have however enough good channels for the full CHANTI instrumentation. The slope distribution is about 0,15 mV/DAC (as expected for G=2) Modified mezzanines: results

Offset(mV) All the 160 CHANTI-TOT mezzanines, corresponding to 640 channels, have been tested and only 7 of them are not good (already sent to the Artel for repair). We have however enough good channels for the full CHANTI instrumentation. The average offset is 8 mV

CHANTI-FE CALIBRATION MUX 32 X CHANTI- FE Keithley picoAmperometer Calibrated high impedence resistor Semi-automatic DAC calibration system developed in Napoli. The procedure needs a picoAmperometer and a calibrated high resistence in order to calibrate both the DAC voltage value (read and set by CHANTI-FE) and the DAC current value (read by CHANTI-FE). Single-channel calibration for 9 CHANTI-FE boards has been performed at CERN in July. Two values for the resistive loads have beed used (1GΩ and 500MΩ).

DAC value CHANTI-FE CALIBRATION Example: CH1 of board 1 calibration with 500MΩ load Volt DAC value μAμA Set voltage calibration Read current calibration

CHANTI-FE CALIBRATION #CH Voltage Slope (Volt/DAC) Comparison of voltage-slope of board 1 channels for the two different loads (red points 1GΩ, blue points 500MΩ).

CHANTI-FE CALIBRATION Parameters distribution for voltage calibration (500MΩ load ) for all channels Volt/DAC Volt Slope parameter Constant parameter

CHANTI-FE CALIBRATION Keithley Source Voltage Current Meter MUX 32 X Board containing SiPM CHANTI- FE Keithley Current Meter MUX 32 X Board containing SiPM Testing calibration procedure: measure I-V curves of SiPMs with two different approaches: 1)Keithley used to apply voltage and measure current 2)Keithley used to measure current; CHANTI-FE apply voltage and measure current

Volt CHANTI-FE CALIBRATION Black curve: current measured by CHANTI-FE Red curve: current measured by Keithley I-V curve measured in the 2) circuit μAμA Volt μAμA I-V curve measured in the 1) and 2) circuits Blue curve: current measured by CHANTI-FE in 1) Red curve: current measured by Keithley in 2)

I-V curve measured in the 1) and 2) circuits CHANTI-FE CALIBRATION Volt μAμA CH1 CH17 CH20 Before correction

I-V curve measured in the 1) and 2) circuits CHANTI-FE CALIBRATION Volt μAμA CH1 CH17 CH20 After correction CH1

I-V curve measured in the 1) and 2) circuits CHANTI-FE CALIBRATION Volt μAμA CH1 CH17 CH20 After correction CH17

I-V curve measured in the 1) and 2) circuits CHANTI-FE CALIBRATION Volt μAμA CH1 CH17 CH20 After correction CH20

CHANTI-FE DCS

Commissioning schedule Signal flanges not mounted yet (missing orings) Internal cabling completed and tested (all of SiPMs look fine) External cabling and finally commissioning will start in the week of September 15th and will likely last till the beginning of the Run. However all of the parts of the system have already been tested individually.

To do list Upgrade of digitization and reconstruction on MC (deadline: few months ago actually…but not enough manpower up to now) Raw data definition and L1/L2 sw (deadline: end of September) Completion of DCS and inclusion in general framework (deadline: November)

Conclusions The CHANTI is installed and (almost) ready to take data !!! January 2009