Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.

Slides:



Advertisements
Similar presentations
1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
Optoelectronic Multi-Chip Module Demonstrator System Jason D. Bakos Donald M. Chiarulli, Steven P. Levitan University of Pittsburgh, USA.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
Disposable Mattress Cover with Wet Sheet Sensors ECE 4884 L05 Advisor: Dr. Art Koblasz Team Members: Youn Hur Michael Wozniak Pyungho Chung Dongki Yoon.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
E-readout workplan & organization Successfully passed FDR – Draft report: ATL-IP-MR-0003ATL-IP-MR-0003 Mechanical baseline is defined Focus now more on.
July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test1 WBS (& W.B.S & Services) Pixel Module Assembly & Test 1.Technical Status.
Microcontroller Hands-on Workshop #3 Ahmad Manshad New Mexico State University Institute of Electrical and Electronics Engineers November 7, 2009.
K.K. GanUS ATLAS Review1 Optical Hybrids K.K. Gan The Ohio State University WBS
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Apex Target Marco Oriunno, April 23, Design and fabrication by: Marco Oriunno, Dieter Walz, Jim McDonald, Clive Field, Douglas Higginbotham, and.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Hardware status GOLD Generic Opto Link Demonstrator Assess the use of optical backplane connectivity for use on L1Calo Uli Schäfer 1.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
CRIMPING TOOLS. CONTENTS INTRODUCTION EXAMPLES CABLE TIE TOOLS RJ45 CRIMP TOOLS HAND CRIMP TOOLS.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
Oct/07/2010Pixel PP0 opto replacement issues1 1 1 PP0 Opto Replacement Issues Philippe Grenier, Martin Kocian, Dave Nelson, Marco Oriunno, Su Dong, Charlie.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
A 128 fiber Slit-Plate assembly, Kinematic mount
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
CERN, CT Workshop, ID Week, July 2 nd, 2007 Connectivity Workshop Conclusions: Lessons learned C12 Test Next future Claudia Gemme, CERN - INFN Genova Connectivity.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
Belle-II iTOP HVB Status SLIDE FOR INCLUSION IN GARY’S PRESENTATION Belle II General Meeting Gerard Visser Indiana University CEEM 11/13/2012.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Mechanics: (Tim).
HB RM prototype component status
Some proposals on HV circuits realization for segmented straw detector
First of all we will remind some numbers:
Common termination methods:
“Breadboarding” a Simple FM Transmitter
Presentation transcript:

Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002

Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels2 Introduction Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here

Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels3 Power wires need to be cooled Opto boards must be kept below 20C Dedicated cooling loop 12 PPO Flex Boards connect Electrical cables from modules to Optical & electrical services Opto boards PP0

Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels4 PP0 Schematic

Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels5 Technical Status: PP0 V.1 First PP0 prototype fabricated Jan Rapidly became electrically obsolete Demonstrated folding technique to produce very long flex. Method works but, Yield is low & cost is high because surface area is large

Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels6 Technical Status: PP0 V.2 Need second prototype to: –Continue service integration work –Prepare for system test Module connector pinout specified HV on separate connector decided Will use micro-welded aluminum ribbon instead of folded flex cable Waiting for Opto-board power requirements to be decided

Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels7 Technical Status: Service Panel

Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels8 Technical Status: PP1 End Possible implementation TOP BOTTOM Aluminum power wires w/ gold-plated ends soldered to small flex tail with 180 pin SMT connector here This flex board carries 160A and dissipates 3.5W 6 cm

Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels Goals: PP0 Fabricate V.2 prototype –Fab. $3K –Connectors $3K –Outside assembly $1K –Testing 80 hours technician –Microwelding 40 hours technician Totals –$7K –120 hours technician

Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels Goals: Service Panel Assemble one electrical panel with carbon fiber face sheets –Mechanical materials $1K –Aluminum wires $2K –Gold plating of wires 40 hours shop –Qualification tests for wires 80 hours tech. –PP1 end connector tail fabrication & assembly $3K –Assembly 60 hours tech. –Testing 80 hour tech. Totals –$6K –220 hours technician –40 hours shop